Magnetic Nanofluidics ME342 Design Project Update 2 Abhishek Dhanda Kwan-Kyu Park Michael Pihulic Katherine Tsai July 13, 2006.

Slides:



Advertisements
Similar presentations
Metrology Roadmap 2003 Update EuropeUlrich Mantz (Infineon) Mauro Vasconi (ST) JapanMasahiko Ikeno (Mitsubishi) Toshihiko Osada (Fujitsu) Akira Okamoto.
Advertisements

Dry Etch and Thin films & Process Integration Jan 6th, 2015 NNfC monthly admin committee meeting.
PMMA & HSQ trend chart December 2012 Sangeeth kallatt.
CHAPTER 8: THERMAL PROCESS (continued). Diffusion Process The process of materials move from high concentration regions to low concentration regions,
CMOS Inverter Layout P-well mask (dark field) Active (clear field)
Vertical Pillars for Biological Force Sensing Class update – July 6th Sarah Coulthard, Nahid Harjee, Nathan Klejwa, Ronald Kwon.
Adhesive Bonding with SU-8
INTEGRATED CIRCUITS Dr. Esam Yosry Lec. #6.
NOVEL PROCESSES FOR SOI-BASED MEMS AT VTT
MonolithIC 3D  Inc. Patents Pending 1 The Monolithic 3D-IC A Disruptor to the Semiconductor Industry.
EE412: EVG Spraycoater Characterization Project Owner: Mahnaz Mansourpour Project Mentor: Jason Parker Student Investigator: Ehsan Sadeghipour 1/12/2011.
Design and Implementation of VLSI Systems (EN1600) lecture04 Sherief Reda Division of Engineering, Brown University Spring 2008 [sources: Sedra/Prentice.
Top Side Conductor vacuum deposition Aluminum sputter deposit in Argon plasma CVC 601-sputter deposition tool.
Process integration
Design and Implementation of VLSI Systems (EN0160) Sherief Reda Division of Engineering, Brown University Spring 2007 [sources: Sedra/Prentice Hall, Saint/McGrawHill,
Bulk MEMS 2013, Part 2
Tom McMullen Week 9 1/4/2013 – 5/4/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
Rochester Institute of Technology - MicroE © REP/LFF 8/17/2015 Metal Gate PMOS Process EMCR201 PMOS page-1  10 Micrometer Design Rules  4 Design Layers.
Status and outlook of the Medipix3 TSV project
Magnetic Nanofluidics ME342 Design Project Update 3 Abhishek Dhanda Kwan-Kyu Park Michael Pihulic Katherine Tsai July 27, 2006.
McGill Nanotools Microfabrication Processes
Fabrication of Active Matrix (STEM) Detectors
Weekly Group Meeting Report Renjie Chen Supervisor: Prof. Shadi A. Dayeh.
G. Parès – A. Berthelot CEA-Leti-Minatec GU project status.
IC Process Integration
Lecture 24a, Slide 1EECS40, Fall 2004Prof. White Lecture #24a OUTLINE Device isolation methods Electrical contacts to Si Mask layout conventions Process.
Fabrication Technology(1)
Tom McMullen Period 3 Week 9 8/4/2013 – 12/4/2013.
BioMEMS Device Fabrication Procedure Theresa Valentine 8/19/03.
SMEAS 2007 Bex, Rob, Georgios, Jason. Fabrication Process status...looks like ~45% of the process is completed... Hmmm....
Norhayati Soin 05 KEEE 4426 WEEK 12/1 3/13/2005 KEEE 4426 WEEK 12 CMOS FABRICATION PROCESS.
PTC Proposal Seongjin Jang September 09, Submit Application To PTC All the users should submit their process-related information to Process Technology.
Presenter Name Facility Name Ultra Thin CCD detectors for particle physics experiments.
Spencer/Ghausi, Introduction to Electronic Circuit Design, 1e, ©2003, Pearson Education, Inc. Chapter 3, slide 1 Introduction to Electronic Circuit Design.
VCSEL Fabrication Processing
1. Wafer clean 2. Thermal oxidation 3. PR coating and patterning, Mask #1 4. Wet BOE etching SiO2 Dry RIE etching low stress nitride 5. Positive resist.
LPICM slides for WP3 Wanghua Chen and Pere Roca i Cabarrocas
Weekly Group Meeting Report Renjie Chen Supervisor: Prof. Shadi A. Dayeh.
ANODIC BONDING – WAYS OF SURFACE CLEANING
Silicon Design Page 1 The Creation of a New Computer Chip.
ME342E Class update IR Grating Group 7/13/2006. Characterizations performed ► Al deposition thickness (got 120 nm) ► LTO deposition thickness (.6-.8 um)
Plasma bay modernised in Sentech SI 500 RIE cluster Si 3 N 4, SiO 2, polySi and Al etching 2 x Oxford System 100 ICP Si 3 N 4, SiO 2, polySi, polymers,
Fab - Step 1 Take SOI Wafer Top view Side view Si substrate SiO2 – 2 um Si confidential.
MEMS 2016 Part 2 (Chapters 29 & 30)
EE412 Project: Corrosion resistant ALD coatings Alex Haemmerli and Joey Doll Mentor: J Provine.
(Chapters 29 & 30; good to refresh 20 & 21, too)
Preshower PRR July NCSR DEMOKRITOS Production Center : Institute of Microelectronics (IMEL) Regional Center : Institute of Nuclear Physics (INP)
ALD for Conformal and High Aspect Ratio Coverage Bryan (Insun) Park Mentor: J Provine 01/12/2011 EE412.
Micro-scale Tensile Tester Update # 3 Cheng-Chieh Chao Maryam Ziaei-Moayyed Ranadeep Bhowmick Sujay Bangalore Ramachandra ME342 Spring 2006 Prof. Beth.
Weekly Group Meeting Report
Process integration 2: double sided processing, design rules, measurements
New Mask and vendor for 3D detectors
CMOS Fabrication CMOS transistors are fabricated on silicon wafer
ALD Fiji for Conformality Test
Simplified process flow for bonding interface characterization
Date of download: 10/17/2017 Copyright © ASME. All rights reserved.
Bonding interface characterization devices
E-beam Lithography for Optical Gratings and Waveguides
MEMS Two-Phase Vapor Escape Heat Exchanger
Micro-cooling devices for LHCb Velo CERN
Process Flow for ESS5810 AMSF
Summary of Samples Photolithography Samples: EBL Samples:
VLSI System Design LEC3.1 CMOS FABRICATION REVIEW
BioMEMS Device Fabrication Procedure
Lecture #25 OUTLINE Device isolation methods Electrical contacts to Si
Vertical Pillars for Biological Force Sensing
ROCHESTER INSTITUTE OF TECHNOLOGY MICROELECTRONIC ENGINEERING
ME342E Project Update (Part II) July 27th 2006.
A film starts at 13:45 and lasts for 1 hour and 35 minutes
1) Wafer Cleaning Oxidizing – Field Oxide (~130 nm)
Presentation transcript:

Magnetic Nanofluidics ME342 Design Project Update 2 Abhishek Dhanda Kwan-Kyu Park Michael Pihulic Katherine Tsai July 13, 2006

Progress: Equipment Training Completed  Kwan-Kyu: Thermco1,2,poly, P-5000  Katherine: Tylan1-6, EValign, EVbond*  Mike: Wafer Saw, EValign, EVbond* Pending  SEM, E-beam, PMMA station, Metalica, wbgeneral

Progress: Masks Set 1: Microchannels (Etch1, Metal1, Back, Pyrex) H = 10 um, 5 um W = 30 um, 10 um, 5 um, zigzag L = 475 um um Set 2: Nanochannels (Ebeam, Etch2, Metal2, Back, Pyrex) H = 500 nm, 100 nm W = 1 um, 500 nm, 100 nm L = 30 um

Mask Set 1: Microchannels Revisions since 6/10/06: Reduced die size by bending microchannels Increased number of devices per wafer Rearranged layout to facilitate wafer dicing Added labels to each die Added trenches around metal labels

Mask Set 1: Microchannels

ProcessTargetRecipe Estimated SettingTool 1Diffusion Cleaning Std. Clean30-40minWbdiff 2Oxide Growth500nmWet mintylan 1,2 3Diffusion Cleaning Std. Clean30-40minWbdiff 4Polysilicon deposition100nm,500nm Thermcopoly 5E-beam Lithography100nm 2% PMAA 45minPMMA spinning tool 6Si Etch100nm,500nmSMOODEEP5-25 secSTS Etch 7Resist Strip strip/clean20-30minwbnonmetal 8Lithography1um SPR3612#1 Front Etch45minsvgcoat/karl-suss/svgdevel 9Si Etch100nm,500nmSMOODEEP5-25 secSTS Etch 10Resist Strip strip/clean20-30minwbnonmetal 11Diffusion Cleaning Std. Clean30-40minWbdiff 12Oxide Growth10nmWet 11001mintylan 1,2 13Lithography7um SPR220#2 Backside2-3hoursvgcoat/karl-suss/svgdevel 14Si Etch400umDEEP100minSTS Etch 15Oxide Etch500nm 3minP Resist Strip strip/clean20-30minDrytek2 17Lithography1.6um SPR3612#3 Metal45minsvgcoat/karl-suss/svgdevel 18Au(Cr) Deposition100nm,500nmSputtering3hourMetallica 19Lift off 10minWbgeneral 21Anodic Bonding 10minevalign/evbond 22Lithography7um SPR220#4 Pyrex Etch 23Pyrex Etch300um 24Resist Strip Std. Clean wbgeneral 25Wafer Saw wafersaw

Progress Processing: Steps 1 (wbdiff) & 2 (tylan)  Purpose: Etch stop for nanochannel definition  Time = 38 min 23 sec; Temp = 1100 C  t ox (target) = 0.5 µm  1st batch, 4 wafers Tylan1: t ox (measured) =~0.46 +/ µm (3  )  2nd batch, 4 wafers Tylan2: t ox (measured) =~0.5 +/ µm (3  )

Progress Materials purchased  Particles ( 6 µm fluorescent, magnetic particles 250 nm magnetic particles 15 nm fluorescent particles  Si wafers for nanochannels (SNF stockroom) 4 for 500 nm channels 4 for 100 nm channels  SOI wafers for microchannels (Pruitt inventory) 1 for 5 um channels 1 for 10 um channels

Emergent Problems Progress delay  SNF mask writer down for repairs (Back-up plan: mask UC Berkeley)  Coral shut down on 7/11/06  ThermcoPoly shut down as of 7/12/06 Resource  Metal tweezers out of stock until August Process undefined  Litho on pyrex wafer - Alignment issues?  Selective etch for pyrex? Etc.  Need to buy more SOIs? (budget?)  Testing setup

Future Work Current week  Revise mask set 1 (microchannels) if necessary. Submit to Berkeley  Finish mask set 2 (nanochannels)  Poly-Si deposition (nanochannels) Next week  Masks arrive  E-beam (nanochannels)  Litho (microchannels)