Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
LHCb HCAL PMT problems HAMAMATSU studies 1 Yu. Guz.
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
ECAL status and plans  Current status and problems  Recent activities:  C-W noise studies summary;  Lab measurements of LED Monitoring system performance;
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
Yu. Guz 13/06/ ECAL LED system : degradation of clear fibers The radiation degradation of clear fibers of the LED system is (still) well pronounced.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
M.N Minard Calorimeter Calibration scheme Calorimeter calibration procedure.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Calorimeter and its Upgrade Pascal Perret LPC Clermont 8 December 2015 OUTLINE  Detector status  Calibration  Upgrade.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
CALO News Pascal Perret LPC Clermont 23 October 2011.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1/10 Irradiation test of CW bases Yu. Gilitsky / IHEP (Protvino)
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
PreShower Characterisations
The PSD at Pb-Pb run PSD drawbacks at Ar beam
PMT/CW Irradiation tests-2010
2009: restart the system: few observations. Hw maintenance week:
SuperB LNF meeting March 21st 2012 Marcello Piccolo
ScECAL+AHCAL+TCMT Combined Beam FNAL
NanoBPM Status and Multibunch Mark Slater, Cambridge University
LHCb HCAL: performance and calibration
Presentation transcript:

Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities

Yu. Guz 08/02/ The HCAL maintenance was performed on Dec (side C) and Jan (side A). This time it was decided to replace: dead dark current > 50 nA rate effect > 0.2 (abnormally high rate effect was seen with the LED system for many HCAL PMTs, reported several times at CALO meetings, see also next slides). Replaced only the most unstable ones, mainly for studies. Total of 59 PMs replaced !!! 2x more than in 2010/2011. The replaced PMT/CWs side C were briefly studied with LED pulses at the pit. Few observations: 1) the rate effect in replaced PMTs a) is visible also with oscilloscope on LED pulses b) is a feature of PMT itself and not of CW: an attempt made to replace the CW board c) to some extent, observed also in all “leaking” PMTs Why this abnormal rate effect is absent at all in ECAL? Studies will be continued, after the RP clearance of PMTs. PMT replacement > 200 nA (13) nA (14) nA (20) rate effect > 0.2 (11) dead CW (1)

Yu. Guz 08/02/ The HCAL 137 Cs run was performed on 26-Jan Three source passages, in order to determine the PMT slope parameters. A preliminary HV recipe (for E T max=15 GeV) prepared. To be done: check the contact in ATI connectors with CAT using the reflection test. Are we going to work at E T max = 30 GeV in 2012? If yes: 1.a HV recipe should be produced (based on the last 137 Cs run; one more Cs run may be useful to verify it). 2.L0 recipe for E T max = 30 GeV should be produced 3.not to be forgotten: recover the energy scale in the reconstruction (Conddb?) Preparations for the 2012 run

HCAL PMT rate effect Larger than in ECAL! To be understood. The PMTs with high rate effect look distributed randomly, so not related to the average anode current. In some PMTs, the gain stabilizes rather slowly, at few hours time scale. In several cells the instability is high, suspect malfunctioning CW base, to be replaced / repaired during the winter shutdown. (shown for 07-Sep – 05-Oct) 4Yu. Guz 2011/11/23

Yu. Guz 09/02/ There were few dead and unstable PMTs to replace. In addition, it was decided to replace also those with anode leakage >40 nA, with the following motivation: 1) the leakage current tends to grow (reported several times at CALO meetings in 2010), it reached ~ nA in few cells, starting from ~10 nA in October 2009; 2) although a moderate leakage is not a problem for HCAL, at >1000 nA the 137 Cs calibration may fail : the calibration current itself is up to 700 nA in some cells, and the sum may saturate the integrator (the limit is ~1500 nA) 3) the replacement therefore makes sense to avoid (or at least reduce number of) channels with nA by the end of 2011; Total of 25 PM/CWs replaced: dead : 3 unstable, intermittent 5 anode leakage /2011 – a reminder dead (3) unstable (5) nA (2) nA (6) nA (9)

Yu. Guz 08/02/ September 2009: leakage < 5 nA over the whole HCAL Present situation: 17 PMTs with 40…900 nA replaced + 30 PMTs with 10…40 nA left on HCAL Features of the leakage current: - surprisingly, appeared 5 years after the production; - increases with time; - “ohmic” (proportional to HV rather than to PMT gain); - the PMTs with high leakage showed also high long-term gain variation: 10…40% drop from to PMs with maximal leakage currents were studied. In each of them a dynode exists for which the resistance to anode is ~ GΩ. The conductive path is situated inside the PMT bulb and not on its outer surface. In principle, there can exist PMTs with high conductivity between two dynodes, but they are not detectable with integrators. PM anode leakage The leakage seems to be intrinsic for our PMTs, we cannot do much about it.