P25 Business 2/8/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration ASU, Tempe, AZ February.

Slides:



Advertisements
Similar presentations
NCAR Scientific and Research Engineering Staff Appointments Process Bill Randel 2014 Appointments Review Group (ARG) Chair November 12, 2013.
Advertisements

Oregon State Library Transformation Project Launch
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Designing and Implementing An Effective Schoolwide Program
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
McLean & Company1 Improving Business Satisfaction Moving from Measurement to Action.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM January.
Facilities Appropriation Advisory Committee Update – (FAAB) CRIHB-NPAIHB Joint Biennial Board Meeting Thunder Valley Casino Resort Jim Roberts, Policy.
District Grants Office Annual Grant Development Update Report to Presidents, September 2014.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
Collab 4/15/04 #1 EDMEDM Funding the Project Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Raleigh, NC March 3, 2006.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Developing a Monitoring and Pre-Scoring Plan for the Virginia Grade Level Alternative (VGLA) Adapted from the Virginia Department of Education Division.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
AdvancED District Accreditation Process © 2010 AdvancED.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
March Leadership Webinar March24, :00-11:30am To access this meeting by voice, please dial , participant code #
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. Urban.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
EDMEDM EDM Collaboration Meeting Project Management Fast Start Summary Prepared by: John P. Tapia May 25, 2006.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
U.S. Fusion Energy Sciences Program Fusion Program Summary for Program Leaders February 7, 2005 E xcellent S cience in S upport of A ttractive E nergy.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
P25 Business 11/1/07 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration MIT-Bates, Middleton,
E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
Office of Nuclear Physics Response 12/14/06 #1 Response to the CD-1 Review Report Martin Cooper Los Alamos.
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
ALICE-USA in the BTU project 1. 2 US Scope: Inner Read-out Chambers and Associated Readout Electronics.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
P25 Business 5/20/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration Duke University, Durham,
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June 20,
Governor Support Service Training Governor Workshop 31 st March 2016 As a service we have a responsibility to enable all governors to access appropriate,
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
Office of Program Administration and Accountability Virginia Department of Education Title II, Part A, University May 2, 2016.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Specifications for the Integrated Tests II Paul Huffman.
AISL PI Conference February 29, 2016 Division of Grants and Agreements.
Phase II Financial Review Guidance
Collaboration Business
North Carolina Council on Developmental Disabilities
Project Management W. J. Foyt
POLICY COUNCIL MEETING
Budget and Appropriations 101
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
Stan Whitcomb LSC meeting Livingston 21 March 2005
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
Legislative Budget Office (LBO) 2-Year Workplan
TIBC Budget Formulation Improvement Project
Federal Budget Process – Its Challenges as well as its Opportunities
Preliminary Project Execution Plan
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

P25 Business 2/8/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration ASU, Tempe, AZ February 8, 2008 Collaboration Business

P25 Business 2/8/08 #2 Outline A.Response to the DOE annual review B.Impact of DOE guidance and the federal budget C.NSF news (Brad Filippone and Doug Beck) D.Budgetary information E.Status of dispersing funds F.An August agency review? G.Preliminary engineering review H.Teleconferences I.The next collaboration meeting

P25 Business 2/8/08 #3 Response to the DOE Annual Review Five Recommendations - Five Page Response 1.The new R&D activity related to the operating temperature should be investigated and a new plan to address the problem developed and reported to the agencies by the end of the calendar year. Attached the report from the 3 He transport team by Paul Huffman Stated that the most important element was detailed calculations Stated that the 3 He transport team would decide if there was a key experimental demonstration necessary

P25 Business 2/8/08 #4 Response to the DOE Annual Review 2.Have a cryogenics expert evaluate the layout of the EDM hall at ORNL to ensure that the layout is optimized. Report back at the next annual review. Committed Ernie Ihloff to write a report on the nEDM usage of the FNPB-UCN building Committed to have Ernie’s report reviewed by JLab cryogenics team Committed to be done by the preliminary design review of the FNPB-UCN building

P25 Business 2/8/08 #5 Response to the DOE Annual Review 3.Provide a new projected date for the CD-2 request, based on progress on R&D activities, and in the context of funding guidance from the agencies. Reevaluated the R&D risk table based on last collaboration meeting Stated that the collaboration was defining technical feasibility as eliminating the high risk items and having the information for a sensitivity calculation Committing to finish all R&D by June 30 except 3 He injection and new 3 He transport test Requested the CD-2/CD-3a review for ~Dec. 1

P25 Business 2/8/08 #6 Response to the DOE Annual Review

P25 Business 2/8/08 #7 Response to the DOE Annual Review Assumed NSF funding at the proposed amounts and times Assumed all FY’08 carryover, an additional $0.5M in FY’09 above $1.1M, and $4M in FY’10 Projected a 6 month delay in CD-4 Acknowledged Congressional action 3 days prior to submission of the response

P25 Business 2/8/08 #8 Response to the DOE Annual Review 4.Given the large time span of the project, the CD-2 staffing plan should include a succession plan. Noted there was no preventing the evolution of the collaboration leadership Took credit for smooth transition from Chris Gould to Jim Miller Acknowledged the responsibility of the CPM to manage leadership changes Acknowledged LANL responsibility, as lead laboratory, to manage leadership changes

P25 Business 2/8/08 #9 Response to the DOE Annual Review 5.Highest priority should be given on behalf of the collaboration and LANL management in finding the necessary scientific, engineering and technical workforce needed to complete the R&D program and demonstrate technical feasibility to ensure a successful path forward for the project. Took credit for collaboration responding to needs, e.g. a student for David Haase and Xiaofeng and Ameya’s visits to LANL Identified the need for a student at Berkeley Stated that the LANL technician problem was solved Identified the possibility of more engineering at MIT and LANL

P25 Business 2/8/08 #10 Response to the DOE Annual Review Noted that Justin Torgerson had committed 25% of his effort Stated that recruiting was going on within the existing LANL nuclear physics staff Discussed in detail the LANL hiring situation in view of general reductions in force

P25 Business 2/8/08 #11 Budgetary Scenarios New DOE Guid- ance MDC DOE NSF Reality DOE NSF ? ? ? < ? … …

P25 Business 2/8/08 #12 Impact of DOE guidance and the federal budget Assumed all FY’08 carryover, an additional $0.5M in FY’09 above $1.1M, and $4M in FY’10 In actuality, $0.5M in FY’08 rescinded, no additional FY’09 funds, possibly $4.5M in FY’10 If NSF participates, the profile is uncertain Once NSF informs me, I will do an exercise to understand the impact Anticipate putting the cryogenics back on the critical path and seeing what else bad happens. Report on February 27 to DOE

P25 Business 2/8/08 #13 NSF Proposal I yield to Brad and Doug

P25 Business 2/8/08 #14 Budgetary Information

P25 Business 2/8/08 #15 Status of Dispersing Funds w w P All NSF waiting for NSF advance or DOE approval

P25 Business 2/8/08 #16 Status of Dispersing Funds J P J P P P

P25 Business 2/8/08 #17 An August Agency Review? A.Funding agencies will decide in the Spring (late April?) whether to hold an August review depending on what I report on R&D progress B.A guess at what evidence will satisfy them 1. 3 He relaxation time at Duke/NCSU taking data 2. 3 He relaxation time at Illinois taking data 3.Light collection with preliminary results 4. 3 He transport calculations show practicality of the multi-temperature scheme – an experimental design if necessary 5.HV at 500 mK taking data 6. 4 He evaporative purification taking data 7. 3 He injection prepared (waiting) for dual-use cryostat 8.Full valve test taking data

P25 Business 2/8/08 #18 Engineering and Safety Reviews A.Preliminary engineering review of FNPB-UCN building in early April combined with briefing of ORNL safety people B.Preliminary design review of the main cryostat in ~June C.Final design review of the main cryostat ~September D.Preliminary design review of full project ~September

P25 Business 2/8/08 #19 Engineering and Safety Reviews P-Cryogenics – 4 h in June F-Cryogenics – 4 h P-Beam/Shielding – 2 h P- 3 He services – 4 h P-Central detector – 4 h P-Magnets – 4 h P-Computing/electronics – 2 h P-Infrastructure – 2 h i.e. 3-4 days at ORNL in September

P25 Business 2/8/08 #20 Engineering and Safety Reviews Committee Paul Huffman (chair) Martin Cooper (ex-officio) Steve Lamoreaux Vince Cianciolo JLab specialist in cryogenics 2 engineers from subsystems not being reviewed (rotating) A very experienced machinist from … (ORNL?) ORNL safety people 1-2 collaboration volunteers optional A written report from the committee is necessary Jan sets the agenda with advice from Martin and Paul Possible talks by subsystem managers, work package leaders, and design engineers

P25 Business 2/8/08 #21 Engineering and Safety Reviews Material to be covered Specifications and goals A breakdown of the subsystem into subassemblies Assembly drawings of all subassemblies (the model) Finite element analyses where appropriate Other simulations where appropriate to back up specs Heat transfer and dissipation where appropriate Justification of tolerances Compatibility with neighboring parts Compatibility with other subsystems Accounting for CTE’s of dissimilar materials were needed Meeting materials specs for n-activation, n-absorption, n- and 3 He- depolarization, magnetism, electrical conductivity, etc. Safety issues Value engineering (cost minimization) Assembly scenarios Required tests Service and repair scenarios

P25 Business 2/8/08 #22 Collaboration Teleconferences A.Comments

P25 Business 2/8/08 #23 The Next Collaboration Meeting A.When B.Where