CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.

Slides:



Advertisements
Similar presentations
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
Advertisements

DMITRY MACHERET First deputy Chairman of the Russian Railways Joint Scientific Council, Doctor of Economic Sciences, Professor 17 October 2012 Russia –
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Pilot Schools Subpart A General
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
ACCIDENTS SITE MANAGEMENT AND ENQUIRIES. AUTHORITY The ACCIDENT MANUAL notified by the Zonal Railway Administration.
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Schedule of Dimensions And Track & Bridge Structure for Dedicated Freight Corridor adhpm.
INSPECTION AND ITS EFFECTIVENESS PREAMBLE:  Inspections are important to get exact, current field data.  Periodical inspections are called schedules.
Railway Safety Plan and Its Status in Korea
SKV welds - limitations Fatigue life only 50 % of Rail Skill of welder very important Quality control difficult Heating Tapping fusion The Age of weld.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Certification of railway equipment. JSC VNIIZhT Test Centre Speakers: Alexandr Savin Eduard Gunchenko 17 October 2012 VNIIZhT (JSC Railway Research Institute)
Guidelines for Traffic Control at Surface Mines
UNIT III GEOMETRIC DESIGN OF TRACKS
Track for High Speed Trains on IR Challenges Ahead –An Overview Onkar Singh CE/Co-ord/N.E.Railway.
Innisfail Mini Rail Club Inc
Rail Related Research at IIT Madras
CRS Sanction.
LATEST INSTRUCTIONS ON TRACK
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
Old Policy – which no one ever seem to have heard of.
TEST TRACK FOR INDIAN RAILWAYS
Testing and Stability of Rolling Stock
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
Maintenance of LWR/CWR
REVIEW OF CRITERIA FOR REALIGNMENT OF A CURVE
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
LESSONS LEARNT ON THE BASIS OF ACCIDENT ENQUIRY REPORT OF CRS ( LEVEL CROSSINGS )
PWP / LAW Book Short Comings & System Improvement.
INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING. COORDINATION WITH ENGG DEPT Engineering Department responsible for construction and maintenance of following.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
STANDARD MOVING & FIXED DIMENSIONS FOR DEDICATED FREIGHT CORRIDOR.
CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
AN OVERVIEW OF LAWS AND RULES GOVERNING ROAD FREIGHT TRANSPORT AND THEIR ENFORCEMENT ISSUES IN PAKISTAN Shahbaz Latif Mirza Assistant Chief National Transport.
John McBride Locomotive Engineer Kirk Thomas Conductor Kevin Mahoney Road Foreman John Pepe Rail Traffic Controller Bruce Parkin FRA.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
CE2303 Railway Engineering
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Getting a Driver’s License. Junior License »You will have a junior license until you are 18. *(Unless you take DE classroom AND in-car, drive on your.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Geometric Design of Railway Track
1 Address: UIC Safety Database (SDB) System and Results.
INDUSTRIAL SEMINAR ON RDSO : TELECOMMUNICATION DEPARTMENT MADE BY: MAMTA CHAUDHARY
CE2303 Railway Engineering
Simile Billing Process. On the 20 th of the month the Project Administrators monthly billing reminders to all subcontractors that need to be paid.
Reactive to Proactive Approach to Track Maintenance on Indian Railways
MBTA/MassDOT RAILROAD QUIET ZONES
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Simulation of mixed traffic on a railway section
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
Procurement at Lithuanian Railways
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
Welcome To our Presentation
Procurement at Lithuanian Railways
ELECTRIC TRACTION SYSTEM
Pavel Kodym Interoperability expert
CDRL E003 CFAT REPORT TEMPLATE
CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS.
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Fiber Reinforced Polymer Systems
Life Cycle Costing.
Presentation transcript:

CRS SANCTIONS Chetan Bakshi, CRS/Central

WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened for Public carriage of passenger until” CRS has:- Inspected the Railway & rolling stock proposed to be used. There is no infringement to SOD. Structure of line i.e. rails, bridges, signaling, OHE & general character of works comply with laid down standards. CRS has satisfied himself that Railway can be opened for public carriage of passengers without any danger.

WHAT IS RAILWAY FOR THE PURPOSE OF CRS SANCTION ? Railway or Portion of Railway for the public carriage of passengers includes :- All lines including all structure on it or crossing it. Newly built lines, Doubling, Multiple lines, Gauge conversion, Electrification, DC/AC conversion. Yards, Signaling installations. Electric traction equipments Rolling stocks ( Locos,Coaches, Wagons, track machines, Tower wagon etc )

RAILWAY DOES NOT INCLUDE ?  Tramway wholly within municipal area  Lines built in any exhibition ground, fair, Park or any other place solely for the purpose of recreation

TYPE OF WORKS REQUIRES CRS SANCTION (A) Opening of Railways :- New line, Doubling Multiple lines, Gauge conversion, Electrification, DC/AC conversion. (B) Permanent Diversion more than 2 KM length and less than 2 KM length if new station is involved/ Chord line/ Bye pass line. (C) Minor Works :- These are works which are proposed on lines which are opened for public carriage of passengers by CRS. ( Cond…)

TYPE OF WORKS REQUIRES CRS SANCTION These works are :- Opening of new bridge. Strengthening of bridge. Closer of existing bridge. ROB, RUB & FOB Extension of existing bridges. Temporary diversion ( Except for restoring traffic during accidents, floods & breaches ) Permanent diversion less than 2 KM length. Yard remodeling and interlocking installation or alteration to existing installation. New station. ( Cond…)

TYPE OF WORKS REQUIRES CRS SANCTION Heavy re grading of lines > 500 mm Opening of new L/C, shifting of existing L/C, Manning of L/C, up gradation of L/C, Closer of L/C. Addition or alteration to electric installation of tracks equipped to electric traction.

TYPE OF WORKS REQUIRES CRS SANCTION (D) SANCTION FOR INTROUCTION OF NEW LOCOMOTIVES AND ROLLING STOCKS. (E) SANCTION OF INCREASE OF SPEED OF NOMINATED TRAIN ABOVE 110 KMPH & UP TO 120 KMPH. (F) SANCTION OF INCREASE OF SPEED OF NOMINATED TRAIN ABOVE 120 KMPH.

Currency of CRS Sanction Currency of CRS sanction is 12 Months. If for any reason a sanctioned work is not taken in hand within 12 months from date of sanction, CRS should be approached for re validation of sanction.

BASIC RULE BOOKS / ACT The Railways Act Indian Railways General Rule, Opening for Public Carriage of Passengers Rule Schedule of Dimension. All Railways should comply with stipulation of above basic rule books. All other codes and manuals should be in conformity to stipulations of above basic rule books. In case of conflict, stipulations of above rules books will prevail.

PROCEDRURE FOR APPLYING CRS SANCTION (A)Opening of Railways :- Submission of opening document to CRS is termed as “ Reference to CRS for inspection “. Reference to CRS should be made at least one month before the date on which ‘Railway line’ is proposed for opening. ( Cond….)

PROCEDRURE FOR APPLYING CRS SANCTION Reference to CRS is made by General Manager of the Zonal Railway. General Manager should accompany CRS during inspection. If for any unavoidable reasons, if it is not possible for him to accompany CRS, then CAO/C along with concerned officer should accompany CRS. ( Cond….)

PROCEDRURE FOR APPLYING CRS SANCTION DRM along with concerned Branch officers should accompany CRS during the entire period of inspection.

PROCEDRURE FOR APPLYING CRS SANCTION Opening documents consists of following :- GM’s certificate on Form XVI. Brief description of project. Joint safety certificate signed by PHODs Track certificate. Bridge Certificate. Bridge list & bridge abstract Curve / gradient list & abstract Statement of Station and station sites. - Contd…

PROCEDRURE FOR APPLYING CRS SANCTION Statement of Station Machinery Statement of Station accommodation. Level crossing abstract. List of Electrical Crossing. List of telephone wire crossing. Power supply installation abstract. List of infringement to SOD List of question answers. Completion bridge drawings. Index Plan & Section - Contd…

PROCEDRURE FOR APPLYING CRS SANCTION LWR diagram Inspection certificate of material used. Certificate of Earth Work by CE/C. Speed calculation on Curves.

PROCEDRURE FOR APPLYING CRS SANCTION (B ) Permanent Diversion more than 2 KM length and less than 2 Km if new station is involved /chord line, Bye Pass line. Procedure of submission of opening document is same as for opening of Railways.

PROCEDRURE FOR APPLYING CRS SANCTION (C ) MINOR WORKS Application is submitted to CRS by JAG officer of Division / field unit of construction organization. All drawings of minor works are approved by Hqrs. CRS can sanction the opening of minor works for passenger traffic, if he is satisfied; either with or without inspection.

PROCEDRURE FOR APPLYING CRS SANCTION (a)FOLLOWING DOCUMENTS ARE SUBMITTED ALONG WITH APPLICATION OF MINOR WORKS Application on standard format. Descriptive note of proposed works. Drawings duly approved by Hqrs. List of infringement to SOD. Speed restrictions during currency of work. Traffic working rule. List of deviations from General Rule / SEM

(D) SANCTION OF INTRODUCTION OF NEW TYPE OF LOCOMOTIVES/ROLLING STOCKS Application is submitted by Hqrs (CBE). (a) Documents to be submitted along with application. RDSO’s speed certificate. Joint safety certificate signed by PCE, CME, CSTE, CEE & COM. Track Certificate. Bridge Certificate. OHE Certificate.

(E) SANCTION OF INCREASE OF SPEED OF NOMINATED TRAIN ABOVE 110 KMPH & UP TO 120 KMPH. Route proving run is to be conducted by Rly. Application is submitted by Hqrs (CBE). (a) The following documents to be submitted along with application. Result of Route Proving Run. RDSO’s speed certificate of All types of Rolling Stock. Joint safety certificate signed by PCE, CME, CSTE, CEE & COM. Track Certificate. Bridge Certificate. OHE Certificate.

(F) SANCTION OF INCREASE OF SPEED OF NOMINATED TRAIN ABOVE 120 KMPH. COCR is to be done by RDSO. Application is submitted by Hqrs (CBE). (a) The following documents to be submitted along with application. Results of COCR. RDSO’s speed certificate of All types of Rolling Stock. Joint safety certificate signed by PCE, CME, CSTE, CEE & COM. Track Certificate. Bridge Certificate. OHE Certificate.