Heat Flow Mockup - Status J. Rutherfoord 2 June 2014.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Click on this image to open the full PDF document.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products.
Inside-, Depth-, and Height-Measuring Instruments
External nut type series 43
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Bulk Deformation Processes in Metal Forming Chapter 19 Part 1-Rolling
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
Tutorial on Machine vice
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Openergo A self-build rowing machine
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
Manufacturing Processes
Lecture 17 Problems & Solution(1). [1] What is the magnitude of the current flowing in the circuit shown in Fig. 2? [2] A copper wire has resistance 5.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze June, 7 th 2007.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
Metal cutting, or machining, is a process of cutting off a layer of metal from a work-piece surface in the form of chips by the cutting tool in order to.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
EXAMPLE 27.1: A copper wire carries a current of 10 A. It has a cross- sectional area of 0.05 cm 2. Estimate the drift velocity of the electrons.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Duke nEDM Collaboration Meeting The status of 3 He Relaxation Time Measurement at ~400mK Q. Ye, D. Dutta, H. Gao, W. Zheng, X. Zhu Duke University R. Golub,
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Machinists' Parts Drawings Heat Exchanger (HE) block Authorized Access Keith Sawa Findlay’s Machine Shop.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
ASSEMBLING THE PCB Your PCB has two sides, a COMPONENT side and a TRACK side. The view below shows the component side.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
EnviroSCAN Flat Cap Probe Assembly, Normalisation & Installation Version 1.3 (01/03/2012)
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
The tuning mechanism: Left—variable capacitor with a 1.5:1 built-in vernier reduction drive; Middle—a 10:1 vernier reduction drive; right—a crank knob.
Presentation created by T. Trimpe Presentation was developed for use with DNA Jewelry lesson at
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Drawing Two Dimensional Shapes
Date of download: 9/17/2016 Copyright © ASME. All rights reserved. From: A Stepped-Bar Apparatus for Thermal Resistance Measurements J. Electron. Packag.
Internal and External Screw Threads
Metal forming processes
What is the Cam? A Cam is a rotating or sliding piece in a mechanical linkage used especially in transforming rotary motion into linear motion. A cam may be defined as a rotating machine part designed to.
DNA Keychains.
1 – processed surface, 2 – cutting surface, 3 – finished surface
Area of a Rectangle = base x height
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Injection direction This area is OK , because the pin into the tube have a supporting point in this area . The injection force push the pin to the other.
BULK DEFORMATION PROCESSES IN METALWORKING
Design of Distribution Feedbox at LHC P7
Area of a circle Lesson 4.5 February 12th, 2012.
Atlas Calorimeter with LN2 Cooling Loops
LARP Rotatable Collimators for LHC Phase II Collimation
Micrometer.
Bearings Sunday, 17 February 2019.
LARP Phase II Secondary Collimator RC-1
Making a simple steady hand game
Miniature Train Project
Status of the laser test setup and test beam news
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

Heat Flow Mockup - Status J. Rutherfoord 2 June 2014

Status as of 2 June 2014 Our “Instrument Shop” has finished all machining jobs we’ve given it so far. 2 June 2014J. Rutherfoord/R.Walker2

Status – Con’t And orders have been delivered Temp Probes Support and rotation hardware Heater pads But no “hanger” or “push-rod” yet 2 June 2014J. Rutherfoord/R.Walker3

Photos of Mock-up parts 2 June 2014J. Rutherfoord/R.Walker4 For these and more photos see

2 June 2014J. Rutherfoord/R.Walker5 One row of three HEC plate ends – Finger tightened Two and a half of the other eight rows can be seen. These are the ends which face the 12 mm LAr gap.

2 June 2014J. Rutherfoord/R.Walker6 One of many HexCell pads to be cut into rectangles and fit between rows of HEC Cu plate ends.

2 June 2014J. Rutherfoord/R.Walker7 Backside of Al “tube” showing grooves for temperature probes and wires. The other side faces the 12 mm LAr gap.

2 June 2014J. Rutherfoord/R.Walker8 Copper plate with grooves for temperature probes and wires.

2 June 2014J. Rutherfoord/R.Walker9 Other side of Cu plate with grooves for heater connections and wires

2 June 2014J. Rutherfoord/R.Walker10 Clockwise from top left  Threaded G10 rod  Temperature probe  Heater pad

2 June 2014J. Rutherfoord/R.Walker11

2 June 2014J. Rutherfoord/R.Walker12

2 June 2014J. Rutherfoord/R.Walker13

2 June 2014J. Rutherfoord/R.Walker14 Support and Rotation Hardware

2 June 2014J. Rutherfoord/R.Walker15 10 cm × 10 cm LAr level capacitor

Still to come … “Hanger” – Need top plate drawing “Push rod” – Need diameter of feedthru Bronze twisted pair (temp) - ordered Copper twisted pair (heat) – ordered Improved simulations with more accurate mockup geometry 2 June 2014J. Rutherfoord/R.Walker16