HL-LHC/LARP Cable Review, CERN, Nov 05-06 Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.

Slides:



Advertisements
Similar presentations
HT-C22 and C23 LARP Video-Mtg Arup K. Ghosh Arup Ghosh
Advertisements

LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
MQXF Quench Protection Analysis HiLumi workshop – KEK, Tsukuba Vittorio Marinozzi 11/18/2014.
Report of the LARP/HL-LHC International Review of the Superconducting Cables for the HL-LHC Inner Triplet Quadrupoles (MQXF) International Review Committee:
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Innovation with Integrity Klaus Schlenga Washington, March 25, 2015 Bruker response to the FCC specifications.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
DOE Review of LARP – February 17-18, 2014 QXF Design, Fabrication and Irradiation Study Giorgio Ambrosio 2/17/14 1.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
April-20, 2015MQXF Strand :Specification choices - A. Ghosh1 MQXF Strand: Available Implementations of various Cu/No-Cu in RRP April-20, 2015 LARP-CERN.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
Lessons learnt from CERN experience
MQXF cable with RRP wires for Q2
Coil Design and Fabrication
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Nb3Sn IR Quadrupole Program
MQXF Quench Protection and Meeting Goals
CERN Conductor and Cable Development for the 11T Dipole
MQXF Short Models Status and Plans
Procurement of Nb3Sn strand for coils assembled at CERN
MQXF cable with RRP wires for Q2
تكملة الوحدة الاولى الفصل الثاني بالكتاب للاطلاع ثم الفصل الثالث التخطيط لبناء الاختبارات التحصيلية الفصل الثالث من الكتاب (87-164)
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Development of Nb3Sn in Japan
Presentation transcript:

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International review of the Superconducting Cable for the HL-LHC Inner Triplet Quadrupole (MQXF) CERN Nov 05-06, 2014

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 2 Outline Introduction Production History of 108/127 strand Performance of 108/127 Ta-Ternary Ti-Ternary Ti-Ternary HQ-strand : Sn-content design change for RRR control Summary - Lessons Learned Strand Production Cable production

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 3 OST data For Ti-Ternary at mm Reduced- Sn 210C/48h + 400C/48h + 650C/50h reduced by ~ 3% for the “Reduced-Sn” billets

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 4 OST data For Ti-Ternary at mm 210C/48h + 400C/48h + 650C/50h Reduced- Sn 5% reduction in Sn content has strong influence on RRR

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 5 OST data For Ti-Ternary at mm Reduced- Sn

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 6 Summary – Lessons Learned 108/127 strand procurement from three different labs and evolving specification from LQ to HQ to QXF has made it hard to adequately oversee the various contracts and its production. 108/127 took several years to be a stable product. So far OST production for LARP strand has been a mix of optimization of strand design, wire production that is not strictly a production, and has been a learning experience for OST. Going forward we need to apply production QA controls at OST and more oversight with vendor site visits on a regular basis. This might also require performing process audits at the vendor. Identifying a QA manager at OST that will be responsible for our product.

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 7 Summary – Lessons Learned The “reduced-Sn” design change without making any other change in the processing has yielded high dividend in RRR control and should be implemented for all billets going forward. As shown earlier the 132/169 strand needs to have more manufacturing margin to meet Ic specification. In this regard, OST is further optimizing the Sn content to increase Ic and still meeting the RRR specification. Cable _lessons learned (input from Dan)

HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 8 End of Presentation