CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Presented by: Gail G. Goodwin, CPIM Principal Solution Consultant.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
INDUSTRIAL & SYSTEMS ENGINEERING
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
CLIC Permanent Magnet Quadrupole Engineering Development Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 2/07/2010.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
RF Cavity / Coupling Coil Module
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
RUP Fundamentals - Instructor Notes
VALIDATION METHODOLOGY
From Research Prototype to Production
ENGR-11_Engineering_Design_Cycle_Details.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
TECHNOLGICAL DESIGN Architectura l Design Process.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 13/09/2012.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Interpreting and Using Engineering Information. Overview This unit aims to give learners the knowledge and skills needed to use engineering information.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Aviation Maintenance Management
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Drive Beam Quadrupoles Jim Clarke, Norbert Collomb, Ben Shepherd, Graham Stokes STFC Daresbury Laboratory, UK Antonio Bartalesi, Michele Modena, and Mike.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
CLIC Permanent Magnet Dipole Feasibility Proposal
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Accelerator Readiness Review October 31, 2006
Aeronautical PUBLICATIONS
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
LIU Wire Scanner Milestones June 2017
Kyle Erwin Manager, Development Engineering
Status of the PANDA Magnet
Flooding Walkdown Guidance
2K CB FDR Overview:  Agenda, Charge, Review Process
Undulator Assembly Procedure
First Article Inspection
Controlling Project Cost and Schedule
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
L&V Manpower Development Prepared by: HR department Mar, 2013
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
DOE Review of the LCLS Project October 2006
East Hall under construction
Presentation transcript:

CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011

CLIC Permanent Magnet Quadrupole Since last meeting 13/04/2011 much progress –CAD model complete –Analysis complete –Final tweaks complete –Detail drawings complete –Long lead time items have been quoted for –Purchase orders for long lead time items placed (will be today) –Request for quotes on manufactured items in progress –Bill of materials established and verified –Assembly area identified and reserved N. Collomb 03/10/2011 2

CLIC Permanent Magnet Quadrupole CAD Model (spot the difference) N. Collomb 03/10/ Previous (April 2011) model had details missing. Gearboxes identified and fitted Outer Limit switch added Optical Linear Encoders introduced Inner Limit switches added Analysis identified some mechanical improvements were required.

Next step (1): Manufacture Request quotes from manufacturers Discuss process if required and associated tolerances Agree price and lead times Discuss possibility of supplying part assemblies Expected manufacturing duration: 4 months N. Collomb 03/10/2011 4

Next step (2): Assembly Assemble manufactured components Analyse assembly process and identify automation processes Write assembly procedure (work in progress) Identify jigs and fixtures required for assembly process (work in progress) Expected assembly duration: 3 months N. Collomb 03/10/2011 5

Next step (3): Testing Identify required instruments and measurement equipment (manual and automated) Measure magnetic characteristics Measure mechanical tolerances Specify ‘Go and No-Go’ criteria Mark up any deviation for installation purposes Rework or adjust if required Establish test specification document Expected testing duration: 3 months N. Collomb 03/10/2011 6

CLIC PM Quadrupole summary I would like to stress that the prototype is to be treated completely different to the future mass production system This is a proof of principle study There will be some testing during assembly A post analysis will be carried out to identify opportunities for subsequent systems –Procedures and processes (automation) need to be established for mass production –Cost analysis for manufacture, assembly and testing as primary contributor needs to be carried out –Commissioning, Installation, Maintenance and operation costs can be estimated as secondary overall contributor Corrector features are still in preliminary design state CLIC Permanent Magnet Quadrupole prototype (strong family member) completion scheduled for March 2012 N. Collomb 03/10/2011 7