ATF2 Meeting December 18-20 2006 Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October 9-11 2006 20 participants from 3 regions! LAPP/Annecy in.

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
1 A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Reflections on stabilization table B.Bolzon, F.Cadoux, N.Geffroy, A.Jeremie,
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Physics is mathematical not because we know so much about the physical world, but because we know so little; it is only its mathematical properties that.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Some information on the Stacis 2000 Table from CERN, currently in Annecy B.Bolzon,
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
BPM support and beam pipe length FD support status A.Jeremie.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Brett Parker* BNL-SMD *For BNL Superconducting Magnet Division and the ATF2 Superconducting Magnet Upgrade Collaboration ILC Superconducting Final Doublet.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
1 A_RD_2A_RD_2 Design of the linear collider machine-detector interface and ATF-2 at KEK Ph.Bambade, J.Brossard, O.Dadoun, C.Rimbault, M.Alabau Pons, A.Jeremie,
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
Alignment and stability session
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
Complementary ISTC Projects #3888, 3889p
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Active isolation Target : a low cost dedicated table
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
A.Jeremie Some drawings from different CLIC’08 presentations
ATF2 review R. Tomas ATF2 review web:
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
FD supports A.Jeremie.
IP configuration session
Presentation transcript:

ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in ATF2 Annecy tasks: Measure low frequency behavior of CERN Table (done: see talk by Benoit Bolzon) Study FFTB magnet mover modification (done: see next slides) Prepare arrival of FFTB magnet movers (movers are being shipped) Determine usefulness of CERN table for final focus section (this meeting)

ATF2 Meeting December Andrea JEREMIE2 4 FFTB Movers on their way to Annecy (arrival after Christmas) Spring 2007: learn to use the movers and do vibration measurements with equivalent masses When Cherrill Spencer has the FFTB magnets modified, they will probably make a stop at Annecy for realistic vibration measurements on their way to KEK (before summer break) See on real movers if 8cm support modification OK Schedule : movers

ATF2 Meeting December Andrea JEREMIE3 QD0:400kg mover: 25kg T-plate:10kg

ATF2 Meeting December Andrea JEREMIE4 Height to beam-line In a message from Tauchi san, the beam-line is at a height of 120cm CERN Table at Annecy Movers QC3 = QD cm 16 inches = cm 61 cm Total: cm OUPS! A.Jeremie

ATF2 Meeting December Andrea JEREMIE5 Mover modification (Nicolas Geffroy/Annecy) cm cm cm

ATF2 Meeting December Andrea JEREMIE6 Two possibilities cm 5.59 cm cm ( ) 3.05 cm - Very accurate base plate thickness for desired magnet height. - Use of spacer to adjust magnet height / inclination

ATF2 Meeting December Andrea JEREMIE7 Send CLIC CERN table a little before arrival of QD0 (and other final focus section) magnets (end of 2007, beginning 2008) But since our measurements show that the CLIC CERN table is not ideal for ATF2 Final Focus section => work on alternative support : Rigid mount or rigid mount with polymer sheet Eigenmode simulations or dynamic simulations if measurements done on support => work with Sugahara san and Kume san Schedule : movers