The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.

Slides:



Advertisements
Similar presentations
Page 1 GEO/CEOS-SIT Call to Action Ken McDonald WGISS Vice-Chair.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
GEO Work Plan Symposium 2011 Days 2 & 3 ID-01 Data Sharing.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
ID-06 Building a User-Driven GEOSS Essential Components of User Management for GEO Tasks.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
1 DA POC/Lead: Doug Nebert (USGS) Lead: Martha Maiden (NASA) Facilitate the development, availability and harmonization of data, metadata, and products.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
ADC Management Strategy Ivan DeLoatch, USGS, ADC Co-chair Barbara Ryan, WMO, ADC Co-chair Alessandro Annoni, EC, ADC Co-chair ADC/CBC Joint Committees.
Earth Sciences Sector Canada Centre for Remote Sensing The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew,
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-5 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
GEO Cold Regions: from Regional to Global effort --- As the interface between SAON and GEOSS Yubao Qiu Vancouver, Canada 29 March 2013.
Water & Health Community of Practice (CP) Taking a Watershed Approach (a draft for review) GEO User Interface Workgroup Geneva, Switzerland December 16,
SAON is a process to support and strengthen the development of multinational engagement for sustained and coordinated pan-Arctic observing and data sharing.
Building GEOSS Trying to communicate the vision and a coherent work plan.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
STATUS REPORT ON WA TASK DESCRIPTION: “Organize workshops on water observations, encompassing space-based, airborne, and in-situ observing systems,
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
Task DA Sensor Webs Enablement for In-Situ Observing Network Facilitation Dr. Jay Pearlman Presentation to ADC May 14, 2007.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
Earth Sciences Sector Canada Centre for Remote Sensing The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Francesco Pignotelli,
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
GEO ADC Co-Chair meeting, Tokyo, Japan, 13 May 2007 Slide # 1 Cross-GEO Coordination Report of C4 Meeting and follow-up discussion Ivan Petiteville, CEOS.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014.
WA Task Report Prepared by Rick Lawford May 29, 2008.
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
ADC Portal & Clearinghouse GEO Architecture and Data Committee 2-3 March 2006 George Percivall OGC Chief Architect
An Integrated A&D Strategy Jay Pearlman, A Annoni I DeLoatch, B Ryan Briefing to ADC Meeting March
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
© GEO Secretariat Welcome Note on Behalf of GEO S&T Stakeholders Workshop Bonn, Germany 28 August 2012 Barbara J. Ryan Director, GEO Secretariat.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
Data Services Task Team WGISS-22 meeting Annapolis, the US, September 12th 2006 Shinobu Kawahito, JAXA/RESTEC.
Splinter Session 1a : Identify topics Europe would like to have included in the GEO WP Chair: Luigi Fusco, ESA Reporting: Luca Demicheli, EuroGeoSurveys.
1 BUILDING A USER-DRIVEN GEOSS: Continuing User Engagement as a Priority of GEO Presented by Lerato Senoko, South Africa On behalf of the UIC Co-Chairs:
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
Report of the Capacity Building Committee to the ADC-6 meeting.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
GEOSS Data Sharing Principles
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Oceans and Society: Blue Planet
Presentation transcript:

The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006

Community of Practice A user-led community of stakeholders, from providers to the final beneficiaries of Earth observation data & information, with a common interest in specific aspects of societal benefits to be realized by GEOSS implementation.

Why CPs? no global mechanism to bring together actual users, potential users, researchers, producers and distributors of Earth Observation data & information; the absence of a coordinated and consistent global approach has resulted in impediments to information sharing & duplication of effort; and some information concerning the importance of the particular societal benefit area.

CP Membership representatives from GEO member states, participating international organizations and any other stakeholders/organisations having similar interests, goals, and/or objectives, working closely together to create a forum for efficient and effective intelligence and advice to be provided to GEO for the successful implementation of GEOSS.

UIC Interest in ADC Tasks Task AR-06-03, in part, will Identify architecture requirements, drawing from the user requirements identified in each societal benefit area and the outcome of Task DA The UIC needs to interact with ADC on how the user requirements will be obtained for each societal benefit area.

UIC Interest in ADC Tasks Task AR will Produce an inventory of existing in-situ observation networks Associate them with societal benefit areas as appropriate. The UIC will encourage its members to assist in this Task

Challenges for the CPs Engage a Spectrum of Users Draw in Leaders from across the Globe Involve Developing Countries (CBC – UIC Interaction) Specify User Requirements (ADC – UIC Interaction) Ultimately Show How to Measure Societal Benefits

The ADC, the CBC and the UIC Five Tasks Where These Committees Could Be Interacting?

UIC Interest in ADC Tasks Task AR will, in part, Identify architecture requirements, drawing from the user requirements identified in each societal benefit area and the outcome of Task DA The UIC, CBC and the ADC need to interact to ensure that the spectrum of users in both developing and developed countries are engaged in identifying requirements.

UIC Interest in ADC Tasks Task AR will Produce an inventory of existing in-situ observation networks Associate them with societal benefit areas as appropriate. The UIC & CBC should encourage their members, and the CPs, to contribute to the inventory.

UIC Interest in ADC Tasks Task DA will do the following Workshops with participants from developed and developing countries An initial version of an inventory of required data, metadata, products & services commonly required across diverse societal benefit areas A Findings and Recommendations document The UIC will encourage the CPs to contribute and ultimately use the inventory and Findings & Recommendations Document from this Task.

UIC Interest in ADC Tasks Task AR-07-P3 notes a prominent requirement for the Health, Ecosystem & Biodiversity SBAs, A prototype data access & analysis system for overlaying various data (e.g. species distribution, protected area boundaries, specimen locations) with remote sensing and other geospatial data. The UIC and its CPs should interact with the ADC on this Task.

UIC & ADC Interest in CBC Tasks Task CB-07-P1 will do the following Hold a symposium in early 2007 to define the capacity building activities for the next few years. Identify the best practice examples identifying gaps (infrastructure, education & training, institutional) Prepare a Strategy with recommendations for filling these gaps and on synergy & coordination of existing CB programs & initiatives. The CBC, UIC & ADC should (jointly?) review the results of the symposium and then the CB Strategy when available.