Change Laser Rep Rate for the Fall 2015 / Spring 2016 Configuration.

Slides:



Advertisements
Similar presentations
Operational Amplifiers
Advertisements

Reconfigurable Computing (EN2911X, Fall07) Lecture 04: Programmable Logic Technology (2/3) Prof. Sherief Reda Division of Engineering, Brown University.
© Copyright Andrew Hall, 2002 FOMGT 353 Introduction to Management Science Pivoting Slide 1 The Simplex Method Pivoting, an Animation.
Warm Up: Tuesday. Today I will learn…  Order of Operations.
System X 3500 Fan Cage Removal Here are some basic steps and helpful hints.
Introduction Our goal this semester was to setup a recently purchased tunable diode laser from Thorlabs (TLK-L780M). Tunable lasers are important in physics.
ECE 352 Electronics II Winter 2003 Ch. 8 Feedback 1 *Feedback circuit does not load down the basic amplifier A, i.e. doesn’t change its characteristics.
Wien-Bridge Oscillator Circuits. Why Look At the Wien-Bridge? It generates an oscillatory output signal without having any input source.
30 September 2004Comp 120 Fall September 2004 Chapter 4 – Logic Gates Read in Chapter 4 pages , , section 4.8 through top of page.
EE42/100 Spring 2006Week 9a, Prof. White1 AC  DC: Using a full-wave diode rectifier circuit (used in the music system final project) The 20:1 turns ratio.
UNIVERSAL COLLEGE OF ENGG. AND TECH. ANALOG ELECTRONICS.
How to enter the General Education data.. Click the Faculty tab at the top right of the UC home page.
Converting binary to decimal decimal to binary
Box and Whisker Plots. Order numbers 3, 5, 4, 2, 1, 6, 8, 11, 14, 13, 6, 9, 10, 7 First, order your numbers from least to greatest: 1, 2, 3, 4, 5, 6,
Scale Power Measurement Pengcheng Jia Nov 21, 2002.
3.2 Solving Systems of Equations Algebraically Substitution Method Elimination Method.
Logic Design A Review. Binary numbers Binary numbers to decimal  Binary 2 decimal  Decimal 2 binary.
FSS Review 18th August Opto-isolator:Opto-isolator: Top 4 frequency bits set by DIP switchTop 4 frequency bits set by DIP switch FPGA controls bits.
Vela NDU EAS Controller BEFORE connecting any hardware, verify that the NDU front power LED indicator is OFF. BEFORE connecting any hardware, verify that.
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
WORD STUDY Mrs. Poole’s Class Buddy Study Procedures.
Electronic Troubleshooting Chapter 8 Operational Amplifiers.
The PITZ Timing System Frank Tonisch DESY - Zeuthen.
Frames in XHTML Please use speaker notes for additional information!
AUP2G57 configured as flip flop Dual Configurable Logic Design Contest.
ECE 352 Electronics II Winter 2003 Ch. 8 Feedback 1 *Feedback circuit does not load down the basic amplifier A, i.e. doesn’t change its characteristics.
ENS 203- Amplitude Modulation and Demodulation Lab 6 Radio Experiment Meric Ozcan After you configure the radio as specified in your lab sheet, you will.
Use Agilent MSO9404A scope as DAQ system to measure APD time resolution with laser diode - Step by step instruction C. Lu Princeton University (3/30/2015)
ECE 352 Electronics II Winter 2003 Ch. 8 Feedback 1 *Feedback circuit does not load down the basic amplifier A, i.e. doesn’t change its characteristics.
‘Rig’ components Audio Amplifier/Speaker Stimulator DC Strain Gauge Amplifier AC Amplifier AM Amplifier Analog Oscilloscope Power Supply.
1 Installation Training Everything you need to know to get up and running.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Step 1: Place x 2 term and constant into the box 2x 2 2 PROBLEM: 2x 2 + 5x + 2.
Chapter 1 Section 1.6 Algebraic Properties of Matrix Operations.
Proper Keyboarding Technique Andrea. Names The one on top is called the top row. The one in the middle is called the home row. The one on the bottom is.
1 Divide large numbers Example 639 ÷ 3 Set out the working like this: 3 2 Then the tens Start with the hundreds 639 ÷ 3 = ÷ 3 = 1 6 ÷ 3 = 2.
Box Method for Factoring Factoring expressions in the form of.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Blazes and Signs On the Oak Ridges Trail.
ECE 1270: Introduction to Electric Circuits
Monitoring system commissioning
Start on the corner of your picture *(Not the corner of the paper)
35mm slide scanning in the HoA Visual Resources Centre
Section 5.3 Dividing Monomials
Power amplifiers Prepared by Tanvi V. Patel Pooja K. Rana
Gridding BIG Paper One square at a time….
Warm Up: *Hand in Task Sheet! (P5)
EEL 3705 / 3705L Digital Logic Design
Topic 3: Data Binary Arithmetic.
To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.
Karnaugh Maps Topics covered in this presentation: Karnaugh Maps
Low Level RF Status Outline LLRF controls system overview
Integers and Opposites on a Number Line Guided Notes
Bitwise Operators CS163 Fall 2018.
Please retrieve a copy of page A8 from the Student Handout Packet.
NASA Spin-Offs Year 1 Science.
Hardy 3030 Home Page These slides will walk you through setting up the mapping to send a “Tare” command to the HI 3030 unit. This same principle would.
Job Performance Requirement 10-15
Low Level RF Status Outline LLRF controls system overview
Box and Whisker Plots.
AM-7026 Down Converter-Receiver
Recap Subatomic particles Mendeleev v. Mosely. Recap Subatomic particles Mendeleev v. Mosely.
Piecewise Functions.
CPSC 121: Models of Computation
CPSC 121: Models of Computation
Diode Laser Experiment
Properties of Numbers Review Problems.
Presentation transcript:

Change Laser Rep Rate for the Fall 2015 / Spring 2016 Configuration

Step 1. Turn laser amplifier emission OFF. Step 2. You should see “Emission” bit OFF and “E Off” bit ON. Step 3. You should also see Laser Output zero. Step 4. The LLRF can be left on. These are the good values. Step 5. Open the Frequency Division Controls (see next page)

A B C Step 6. Rear IN01B04 connect each laser (A/B/C) to either: a)250 MHz = MIDDLE OUTPUT b)499 MHz = BOTTOM OUTPUT Note - Here, A/C=250 and B=499 Note - Splitter on low row provides LLRF 499MHz to close feedback look – do not remove! TOP ROW = 499MHz INTO CHASSIS

Step 7. For each laser enter “*a02” for seed to operate at 499MHz or “*a04” to operate at MHz Step 8. The seed power will report a value of about 200 when connected to the same LLRF output (499 or 249.5)

Step 9. Turn laser amplifier emission ON. Step 10. You should see “Emission” bit ON and “E Off” bit OFF. Step 11. You should also see Laser Output 4-6.

Procedure Complete