MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.

Slides:



Advertisements
Similar presentations
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 1. Some recent views ( ) 2 Linac tunnel
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Update on the Laser Beam Line
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
PASI OsC meeting 12th July 2012
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
1 Building Design Progress Dan Wilcox March 2012.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Cryomodule test stand at ESS site
SUPERB site status report for layout v12
Safety in the Neutrino Platform Hall
CLIC Handling Engineering Update
Francois and Lau EATM 17 July 2012
ELENA installation and commissioning status
CLIC Civil Engineering & Infrastructure
COOLING & VENTILATION INFRASTRUCTURE
Status of the cryogenic system for B180
UK RFD Pre-Series cryomodule
Installation XFEL Tunnel WP 34
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
High Level Readiness Reviews
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1

MEF - Machines & Experimental Facilities Main remaining General Services work Civil Engineering & Infrastructures – Infrastructure at the end of the transfer tunnel – Infrastructure over the wave guides in the tunnel Linac4 Electrical systems & cabling – Installation of the electrical boxes in the tunnel at final position – Pulling of 50 distribution cables for heating protection of the ionic pumps – Connection of the modulators – Installation of 2-3 missing canalis over the racks in the hall – Local cabling of the klystrons ongoing 14/03/2013J.Coupard2

MEF - Machines & Experimental Facilities Main remaining General Services work Cooling and Ventilation – Cooling pipes in the dump area and for the transfer line – Ventilation system of the control room Safety systems – New fire detection system along the modulators in the hall – Use of the access system (PAD/MAD) for 10MeV beam commissioning (2014) Transport and handling systems – New crane in the dump area – Installation of the machine structures/equipment Survey – Marking of the diagnostic line, transfer line support – Alignment of the machine structures/equipment 14/03/2013J.Coupard3

MEF - Machines & Experimental Facilities Work baseline for H- source installation & commissioning The installation planning will be detailed in collaboration with J. Lettry and R. Scrivens. The first solenoid is installed on the LEBT and tests have been performed. March-April-May-June-July-August Hardware commissioning for 3MeV Test procedure for the commissioning of the modulators and the klystrons need to be detailed in order to define the safety aspects and all operational equipment needed. July-August /03/2013J.Coupard4

MEF - Machines & Experimental Facilities Work baseline for RFQ and chopper line installation The installation planning will be detailed in collaboration with C. Rossi. The priority is the installation of the cooling system in the local in order to install then the klystron of the RFQ. This installation takes into account the installation of the diagnostic line. June-July-August MeV beam commissioning The 3MeV area will be separated by fence and the access will stay possible in the Linac4 and transfer tunnel. From September /03/2013J.Coupard5

MEF - Machines & Experimental Facilities In addition Klystrons & modulators The installation of the klystrons will continue according to the availability of them. The installation of the modulators will start in the coming weeks with the RFQ modulator and will continue during the year according to their availability. Linac4 machine installation It would be possible to install some CCDTL according to the installation readiness planning of the structures and the availability of the jacks. Open Days The Linac4 will be one of the visiting site at CERN September /03/2013J.Coupard6

MEF - Machines & Experimental Facilities Concerns In March 2014 is foreseen the beam commissioning at 10MeV. According to the safety requirements, the access system will need to be operational and the ventilation need to run at nominal conditions. – The tunnel need to be hermetic: The material shaft need to be closed Do we need to make the services shaft airtight ? 14/03/2013J.Coupard7

MEF - Machines & Experimental Facilities BIG thanks to Everyone involved in the Linac4 installation for their good collaboration and great job done – CERN staff – Firms (Ineo, Ineo Cofely, EMTE, Spie, Scrasa, Iniziative, Cegelec, MZ, Soteb, Ouvaroff …) – Coordination on site (E. Paulat, J. Etheridge, A. Masson, G. Pastor) … and all those I might forgot ! The installation of Linac4 has a good progress and the first phase of General Services was completed successfully. Everything is ready for the machine installation. THANKS FOR YOUR ATTENTION 14/03/2013J.Coupard8