Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Superconducting Spoke Resonator Cavities and Cryomodules
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
RDR Linac Definition  Tasked Cryomodule & Cryogenics Groups with defining cryomodule length and cryoplant layout First pass generated at Jan CERN.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Detail plan of S1-Global H. Hayano (KEK),
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
650MHz-Cryomodule for CEPC
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
CERN – Zanon discussions
Meeting for S1-Global module design Cryomodule and Cryogenics
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Sensors in the S1-G Cryomodules (Updated )
S1-G cryomodule assembly status
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Yamamoto WG3: ML-SCRF Parallel Session,
KEK injector cryomodule
Summary of the checking items of the Module-C design
IHEP Cryomodule Status
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)

Solid model of FNAL S1-G cavities 2009/8/25 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics) 2 From the slide by Don

FNAL cavities and magnetic shieldings 2009/8/25 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics) 3 Holes on the shield plates What is the function of the holes?

Cavity Packages 2009/8/25 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics) 4 From the KEK modeling Gate valve at room temperature A B A: The present shield design by FNAL/Don has an interference with the gate valve. The length of the shield in the solid model by Don is mm while the length might be 286.5mm. B: The length of the FNAL shield is mm. For overlapping to DESY shield, the length might be mm. The length between the input couplers is mm at room temperature. In the drawing by Don, the distance is mm. Are the modeling made at cold temperature?

Input couplers 2009/8/25 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics) 5 By Don The enclosed components by white circles are required for assembling and supporting warm coupler and vacuum pipes. The hole on the shield has interference with the coupler components.

S1-G cryomodule JT file – – File: S1_Assembly_ jt In the solid model by Don, cavity packages are same as the KEK modeling and component list. In some components, the seals and bolts are missed. – FNAL cavities in KEK modeling are based on the CAD data by Don. 2009/8/25 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics) 6