LAI Intercomparison workshop III Missoula Montana 16 August 2004 Jeff Morisette (301) 614-6676.

Slides:



Advertisements
Similar presentations
Future Directions and Initiatives in the Use of Remote Sensing for Water Quality.
Advertisements

AIAA Task Force on Earth Observations 2 October 2009 AIAA HQ Reston VA.
Committee on Earth Observing Satellites Land Product Validation subgroup LBA Fire and Deforestation Accuracy Assessment 26 July 2004 Jeff Morisette
Earth MONITORING and DISASTER WARNING WG Natural Resource Area Report APAN Conference 2002 Phuket, Thailand 23 rd -24 th January 2002.
SUBGROUP REPORT Jeff Morisette (301) GOFC/GOLD Global Geostationary Fire Monitoring CEOS Working Group on Cal/Val.
2010 CEOS Field Reflectance Intercomparisons Lessons Learned K. Thome 1, N. Fox 2 1 NASA/GSFC, 2 National Physical Laboratory.
Overview Jeff Morisette (301) EGU Breakout on Validation of Global Albedo products Vienna Austria 27 April 2005 LAND.
CEOS Working Group on Information Systems and Services - 1 Committee on Earth Observation Satellites (CEOS) Working Group on Information Systems & Services.
U.S. Department of the Interior U.S. Geological Survey Charge to workshop: Develop an international protocol to quantify the accuracy of remote sensing.
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
LAND PRODUCT VALIDATION update F. Baret, J. Nightingale, S. Garrigues, J. Nickeson Missoula, 17 June /29.
Potentially Hazardous Asteroids: Characterization, Atmospheric Entry and Risk Assessment 9 July 2015 Ames Research Center Moffett Field, California IAWN.
15-18 October 2002 Greenville, North Carolina Global Terrestrial Observing System GTOS Jeff Tschirley Programme director.
J.L. Privette, NASA’s GSFC New CEOS WGCV Subgroup on Land Product Validation (LPV) Jeffrey L. Privette, NASA’s GSFC Jeffrey Morisette, SSAI.
Translation to the New TCO Panel Beverly Law Prof. Global Change Forest Science Science Chair, AmeriFlux Network Oregon State University.
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
CEOS WGCV Land Product Validation Sub-Group Overview Joanne Nightingale, Jaime Nickeson (Sigma Space Corp / NASA GSFC) With input from LPV Focus Group.
Stennis Space Center International Workshop on Radiometric and Geometric Calibration Aims and Goals Bruce A. Davis, Ph.D. Co-Chair, CEOS/ISPRS Cal/Val.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
1 Peter Regner (ESA) Paula S. Bontempi (NASA) Prakash Chauhan (ISRO) Contributions from IOCCG Ocean Color Radiometry – Virtual Constellation CEOS Plenary.
Joint Canada-Mexico-USA (North American*) Carbon Program Planning Meeting January 25–26, 2007 *By North America we mean the North American land, adjacent.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Recommendations from the GEO TASK AG Community of Practice Image: NASA, ASTER Science Team Minnesota Kansas Germany Bolivia Thailand Brazil.
CEOS Working Group on Information Systems and Services - 1 Data Access and Integration: Global and Regional Initiatives and Client Perspectives Rapporteur’s.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Global Terrestrial Observing System linking the world’s terrestrial monitoring systems to provide a global vision of the Earth we share.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Committee on Earth Observation Satellites Plenary Agenda Item #3 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015.
Some thoughts on the validation of fire products Ivan Csiszar UMd.
Land Product Validation subgroup activity in support of LAI inter-comparison.
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
Fire Emissions Network Sept. 4, 2002 A white paper for the development of a NSF Digital Government Program proposal Stefan Falke Washington University.
Ken Jucks and Diane Wickland Carbon Monitoring System: Welcome from NASA HQ November 12, 2014.
SUBGROUP Update to MODIS land discipline team Jeff Morisette (301) March 2005 CEOS LAND PRODUCT GEOSS.
Page 1 CSISS Center for Spatial Information Science and Systems 09/12/2006 Center for Spatial Information Science and Systems (CSISS) George Mason University.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
CEOS Working Group on Information System and Services (WGISS) Data Access Infrastructure and Interoperability Standards Andrew Mitchell - NASA Goddard.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Global land cover validation activities Martin Herold (FSU Jena) & Mark Friedl (UBoston) CEOS Cal/Val land subgroup (land cover)
Institut für Methodik der Fernerkundung International Workshop on Radiometric and Geometric Calibration - Gulfport, Dec I N T R O DU C T I.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 STAR Enterprise Synthesis.
Incoming Themes for 2017 Frank Kelly, USGS
Task DA Report Stephen Ungar (WGCV/NASA), POC
Future directions of CEOS WGCV: Incoming chair perspective
CEOS Carbon Strategy – WGClimate Actions
Preparing for the Production of Essential Climate Variables (ECVs) for Biomass from Future Spaceborne Remote Sensing Missions: Is There A Role for CEOS-Carbon?
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
Kansas Minnesota Germany
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
Committee on Earth Observation Satellites
WGISS-WGCV Joint Session
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
Status of Carbon Action Items
WGCV Overview K. Thome WGISS#45 / WGCV#43
CEOS Status/Overview Steven Hosford WGCV-43/WGISS-45 10th April 2018
Return to First Principles
Site classifications, definitions, and updates to Landnet
Capacity Building for WGCV
Carbon Actions for WGCV
Carbon Actions for WGCV
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
Overview of the validation of active fire products
Communicating Terminology and definitions
Committee on Earth Observation Satellites
CEOS Status/Overview Steven Hosford WGCV-43/WGISS-45 10th April 2018
Recent activities of OCR-VC
LSI-VC Work Plan Updates
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
Working Group on Cal/Val Update
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
Presentation transcript:

LAI Intercomparison workshop III Missoula Montana 16 August 2004 Jeff Morisette (301)

Acknowledgements Jaime Nickeson and Youngee Cho for meeting preparation and planning Jeff Privette (previous LPV chair) and Ranga Myneni for initiating the LAI Intercomparison effort Frédéric Baret (future LPV chair) providing input to this meeting and previous LAI meetings Steve Running for hosting All participants for attending the meeting and participating the LAI-Intercomparison

CEOS/WGCV/LPV Organizational Structure CEOS Committee on Earth Observing Satellites WGCV Working Group on Cal/Val LPV Land Product Validation Subgroup

GOAL: ensure that critical scientific questions relating to Earth observation and global change are covered and that satellite missions do not unnecessarily overlap each other. PRIMARY OBJECTIVES: Committee on Earth Observing Satellites 1: to optimize benefits of spaceborne Earth observations through cooperation of its participants in mission planning and in development of compatible data products, formats, services, applications, and policies 2: to serve as a focal point for international coordination of space- related Earth observation activities; and 3: to exchange policy and technical information to encourage complementarity and compatibility of observation and data exchange systems.

CEOS comprising 41 space agencies and other national and international organizations created in 1984 recognized as the major international forum for the coordination of Earth observation satellite programs and for interaction of these programs with users of satellite data worldwide Individual participating agencies make their best efforts to implement CEOS recommendations …“recommendations” often come from the CEOS Working Groups.

Working Group on Information Systems & Services (WGISS) Working Group on Calibration and Validation (WGCV) Education and Training (WG-Edu) Strategic Implementation Team (SIT) Ad Hoc Team on Utilization Ad Hoc Working Group on Earth Observation Ad Hoc Group on Earth Observations (GEO) CEOS Organization

Working Group on Cal/Val GOAL: ensure long-term confidence in the accuracy and quality of Earth observation data and products. SPECIFIC TASKS: 1.sensor-specific calibration and validation 2.geophysical parameter and derived product validation. -a forum for calibration and validation information exchange, coordination, and cooperative activities -promotes the international exchange of technical information and documentation, joint experiments, and the sharing of facilities, expertise, and resources. WGCV also seeks to be the recognized first point of contact for the international user-community as far as calibration and validation is concerned. With the advent of the Integrated Global Observing Strategy (IGOS), the WGCV has devoted increased attention to the validation of higher-level products.

WGCV Organization Atmospheric Chemistry Subgroup Infrared and Visible Optical Sensors (IVOS) Subgroup Land Product Validation (LPV) Subgroup Microwave Sensors (MS) Subgroup Synthetic Aperture Radar (SAR) Subgroup Terrain Mapping (TM) Subgroup - The goals and activities of WGCV are summarized in its Three-Year Work Plan. Current chair: Steve Ungar, NASA GSFC

Land Product Validation subgroup Initial focus (matching GOFC/GOLD implementation teams): oLand cover/land cover change oBiophysical parameters (starting with LAI) oFire and burn scar Established in 2000 A topic-specific (non-wavelength-specific) subgroup

Big Picture LPV provides a validation service to the Integrated Global Observation Strategy (IGOS) –Global Terrestrial Observation System Terrestrial Observation Panel for Climate (TOPC) Global Observation of Forest Cover/Land Dynamics –Global Carbon Observing System Implications: –Focus Products: Biophysical, Land Cover, Fire Disturbance, & Albedo –Working in conjunction with GOFC/GOLD’s regional networks –Opportunity/Need to integrate with TEMS, GT-Net, & UN’s GLC-net

Validation: the process of assessing by independent means the quality of the data products derived from the system outputs (LPV will operates under this definition, but also with the understanding that validation activities should consider user accuracy needs and feedback to algorithm improvements.) CEOS WGCV Definition

Mission Statement & Goals to foster quantitative validation of higher level global land products derived from remote sensing data and relay results so they are relevant to users to increase the quality and economy of global satellite product validation via developing and promoting international standards and protocols for field sampling, scaling, error budgeting, data exchange for global land product validation to advocate mission-long validation and intercomparison programs for current and future earth observing satellites.

Why validate global land products Committee on Earth Observing Satellites (CEOS) definition validation = “Estimating Uncertainty” Good science and resource management require understanding of product accuracy/uncertainty Explicit statements of uncertainty fosters an informed user community and improved use of data International environmental protocols and agreements imply products may be independently evaluated and possibly challenged As more, and similar, global products are produced by NASA & other CEOS members, inter-use will require characterization of each product’s uncertainty

Validation “hierarchy” Stage 1 Validation: Product accuracy has been estimated using a small number of independent measurements obtained from selected locations and time periods and ground-truth/field program effort. Stage 2 Validation: Product accuracy has been assessed over a widely distributed set of locations and time periods via several ground-truth and validation efforts. Stage 3 Validation: Product accuracy has been assessed and the uncertainties in the product well established via independent measurements in a systematic and statistically robust way representing global conditions.

LPV Plans ( ) Create infrastructure for validation data exchange and management (with WGISS) resulting in on-line access to CEOS Land Validation Core Site data sets (pilot for 5 sites exists) – modeled after EOS Land Validation Core Sites Conduct product Inter-comparisons Develop consensus “best practice” protocols for data collection and description Enhance web based information: –Establish individual listserv groups for: biophysical, land cover, fire (done in 2003) –Continue working with users to define uncertainty objectives/needs (by integrating with the CEOS/WMO database)

LPV Plans ( )

“Intercomparison” General Timeline LAI Albedo Fire related Land cover Topical meeting to establish data requirements Decide on Sites Develop data sharing infrastructure Field Campaigns & individual product analysis Synthesis of results Boston U, 1998 Frascati, Italy 2001 Montana August 2004 Boston U, 2002 Avignon 2005 Lisbon, 2001 Darmstadt 2004 Toulouse, 2001 UMd, fall 2004 Boston U, Feb ‘02 (special issue)

“Intercomparison” General Timeline LAI Albedo Fire related Land cover Topical meeting to establish data requirements Decide on Sites Develop data sharing infrastructure Field Campaigns & individual product analysis Synthesis of results Boston U, 1998 Frascati, Italy 2001 Montana August 2004

Objectives of Workshop (1 of 2) Review current results from multiple validation efforts, with attention to: –field data collection techniques (instruments and sampling scheme) –scaling procedures on how field points are integrated with high resolution imagery and then compared to moderate resolution LAI products –each project’s findings “to-date” –plans for sharing field data and/or high resolution LAI products Decide if, collectively, we can establish “best practices” for the above issues

Objectives of Workshop (2 of 2) Develop a timeframe and roadmap for combining the results for an accuracy statement for global LAI products (leading to stage-two validation and an article in the IEEE TGARS special issue; Morisette, Baret, and Liang eds.) Define research opportunities available through the combined data sets

Discussion Points If there should be and LAI-validation summary paper in the IEEE special issue on Global Land Product Validation, if so, schedule, outline, and leads Data sharing infrastructure –ORNL/WGISS –Data sharing policy Future research –Apply common approach across all sites and compare to each site’s initial results –Inter compare recently available global LAI products –Time series filtering/smoothing algorithms –Under story –LAI confidence Layer –RT vs Backup algorithm –fPAR/cover fraction, Albedo, NPP/GPP Intercomparison –Accupar vs others

Action items Morisette, Privette, Myneni, Baret, Nickeson to lead the special issue intro section to pass along to all presenters Telecon demo of Mercury (Bob Cook to lead initial call/demo, Jaime to follow-up to have data available by the beginning of November) telecons (every 3-6 months) with each groups contact Earth Observer Article

Accuracy/Confidence Layers MODIS Land cover product (MOD12Q1) MODIS land coverAssociated Confidence layer (lighter = more confidence) Note lower confidence in deforestation areas

“Typical” Validation “Reference data” (such as a field observation) Satellite product value Regression analysis or Error Matrix

Validation of confidence layer Confidence Layer values Agreement between product and observed