Hall C Compton Polarimeter Working Group Meeting Jefferson Lab August 8, 2007 1.Meeting agenda 2.Compton Polarimeter overview 3.Subsystem status.

Slides:



Advertisements
Similar presentations
Hall A Collaboration Meeting S. Nanda, June 23, 2005 Hall A Compton Polarimeter For Hall A Collaboration Meeting June 23 rd 2005 Sirish Nanda Thomas Jefferson.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Compton Laser and Systematics for PREx Abdurahim Rakhman Syracuse University PREx Collaboration Meeting, JLab January 30, 2011.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
1 Electron Beam Polarimetry for EIC/eRHIC W. Lorenzon (Michigan) Introduction Polarimetry at HERA Lessons learned from HERA Polarimetry at EIC.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Compton Polarimeter for Qweak Evaluation of a Fiber Laser reference laser high-power fiber laser comparison S. Kowalski, M.I.T. (chair) D. Gaskell, Jefferson.
Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 1 Introduction & Overview O Compton polarimetry basics.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
Polarimetry for Qweak OverviewStatusPlans S. Kowalski, M.I.T. (chair) D. Gaskell, Jefferson Lab R.T. Jones, U. Connecticut Chuck Davis, incoming Hall C.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Hall C Compton Polarimeter Preliminary Design by the Qweak Polarimetry Working Group S. Kowalski, M.I.T. (chair) D. Gaskell, Jefferson Lab R.T. Jones,
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
The Detector and Interaction Region for a Photon Collider at TESLA
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
New Methods for Precision M ø ller Polarimetry Dave Mack Jefferson Lab ( for Dave Gaskell ) May 20, 2006 PAVI06 Precision M ø ller polarimetry Beam kicker.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Summary of Workshop on Precision Electron Beam Polarimetry Newport News June 9-10, 2003 workshop summary by Dave Gaskell, Jefferson Lab Richard Jones,
External Seeding Approaches: S2E studies for LCLS-II Gregg Penn, LBNL CBP Erik Hemsing, SLAC August 7, 2014.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
PAC07, Albuquerque, NM, June25-29, 2007 Fiber-Based Drive Laser Gain-switched seed ErYb-doped fiber amplifier Frequency-doubler 1560nm 780nm.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Hall A Installation Review John J. LeRose 2/25/2009.
PREX Issues. Outline New issue: souce systematics and Aug. 07 run. Update on old issues. Progress at SU.
1 A Proposal for Compton Electron Detector R&D Stephan Aune 9, Alexandre Camsonne 1*, Wouter Deconinck 8, Dipankgar Dutta 4, Gregg B. Franklin 7, David.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy The Department.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Hall C Compton Polarimeter: A new Compton for JLab Jeff Martin University of Winnipeg for the Hall C Compton collaboration U. Conn., Hampton U., JLab,
In the SM to the first order x: variable relevant to the nucleon internal structure Q 2 : Four-momentum transfer squared between the electron and the target.
Analysis of 14/20 mrad Extraction Line Energy Chicane
Magnetized Bunched Electron Beam from DC High Voltage Photogun
Compton effect and ThomX What possible future?
Compensation of Detector Solenoid with Large Crossing Angle
Special Considerations for SIDIS
Hall C Beamline Upgrade
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Andrew Hutton Concept suggested independently by Haipeng Wang
Some of the Points Raised During my JLAB Visit
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Hall C Compton Polarimeter Working Group Meeting Jefferson Lab August 8, Meeting agenda 2.Compton Polarimeter overview 3.Subsystem status

Meeting Agenda Overview and Status (Gaskell) Fiber Laser (Hansknecht) Beamline Design Update (Benesch) Break Electron Detector (Martin) Interaction Region Instrumentation (all) Discussion –DAQ –Photon detector tests –Slow controls –Schedule and manpower

Meeting Goals Summarize current systems’ status Review milestones and update as needed Identify areas that are lagging Identify areas that as yet have not been addressed

Compton Polarimeter Overview Compton polarimeter required to make continuous beam polarization measurements at same time as data-taking Provides cross-check of Hall C Møller, although (initially) the precision will likely be worse Requires the insertion of a m dipole chicane in the Hall C beam line

Polarimeter Requirements and Constraints Precision –We want a device that can (eventually) reach 1% systematic uncertainty Luminosity –Rapid measurements (~ hours) required to understand the device performance and for cross-checks with Moller Backgrounds –Must be able to either suppress backgrounds or make them small compared to signal of interest Geometry –Must fit in Hall C line –Constrained by requirement that fast raster must be ~15 m from pivot: also, no quads between raster and target!

Compton Subsystems Laser + optics –Pursing development of RF pulsed (499 MHz) 25 W green laser –Luminosity comparable to 90 W low duty-cycle system previously on the table –Background suppression a-priori worse, but makes use of electron detector simpler Photon detector –Prototype lead tungstate detector built by Yerevan –Need to pursue photon beam tests Electron detector –“Diamond” detector to be built by Miss. State and Winnipeg –NSERC funding ~ $85k, DOE funding partial with more available upon completion of working prototype Chicane and beamline –Optics design exists – next job to tackle is physical layout –Dipole design underway

Compton Chicane and Beamline Layout Constraints Compton requires insertion of m dipole chicane Hall C Beamline must be overhauled Constraints/Requirements –Fast raster must be at least 14.5 m from the Hall C pivot –No quadrupoles between raster and target –Polarized target chicane still useable –Compton must work for Q Weak (1.165 GeV) AND at 11 GeV –Compton must accommodate coincidence electron+photon detection In particular, we want to detect the asymmetry “zero- crossing” in the electron detector

Cartoon of Hall C Beamline

Beamline Features Dipoles increased from 1 m to 1.25 m to avoid high fields at 11 GeV Moller quads are part of the beamline –Quadruplet before Compton chicane is used to prepare the beam for the interaction region (3C16, 3C17, 3C18, 3C19) –Quadruplet after the Compton chicane used to prepare beam for target (3C20, 3C21, MQ1, MQ2) No combined optics –Moller quads cannot be at “measurement” values while beam is on target Allowed combinations –Compton + target –Compton + Moller (high current questionable)

Photon Detector (Yerevan/HU) Prototype has been tested in SOS, but pion backgrounds made it difficult to precisely map out response Would like to make some photon beam tests: Can we map out detailed response at Duke FEL (HI  S)?  E  = 50 MeV

Laser Re-evaluation Laser choice for Compton had been a high power, diode- pumped solid state green laser –Example: Coherent-90 Pulse structure: 150 ns at 5-10 kHz Average power = 90 W (at 5 kHz) M 2 ~ 32  beam diverges rapidly from focus Advantages of this system –Easy to use – turn it on and go, no high power caity (a la Hall A) to build and maintain –Low duty cycle (~10 -3 ) strongly suppresses background –Multiple backscattered photons per laser pulse  requires use of “energy-weighted” counting, which has larger figure of merit Disadvantages of this system –Large M 2 may make focusing and transporting beam into beamline vacuum difficult –Multiple backscattered photons per laser pulse (on average 2)  may make use of electron detector difficult

Fiber Laser for Hall C Compton (I) Last year, Matt Poelker proposed a “fiber” laser system for use with the Hall C Compton –Fiber laser has been used in the JLab polarized source for ~2 years with excellent results –Source laser has provided excellent stability and minimal maintenance Proposed laser based on system described in Optics Letters v.30 no. 1 (2005) 67 –high average power: 60W average power (520 nm). –demonstrated high peak power: 2.4KW (d.f. = 30) –almost ideal optical properties: M 2 = 1.33 System not pursued at that time –Significant R&D required –Manpower issues

Fiber Laser for Hall C Compton (II) Matt Poelker proposed a fiber laser option again this year, with some differences: –modest average power: 20 W (532 nm). –Pulsewidth ~ 30 ps at 499 MHz –almost ideal optical properties: M 2 = 1.33 This system is more straightforward and uses the following components –Seed laser (1064 nm) –Fiber amplifier (50 W output at 1064 nm) –Frequency doubling cavity Polarized source group is willing to build this laser (with help from Shukui Zhang from FEL for the frequency doubling)

Luminosity from Fiber Laser Average power from fiber laser modest (20 W)  does this equal factor of 5 reduction in luminosity compared to 100 W laser? No – we can actually get about a factor of 4 improvement –For laser pulsed at electron beam repetition rate (499 MHz) and comparable pulse width (on the order of ps), the luminosity is increased by a factor: For typical JLab parameters, this yields about a factor of 20 improvement in luminosity for  = 20 mrad

Luminosity from Fiber Laser Fiber laser pulse-width about 15 times larger than electron beam – no problem! 2.0 cm 2 1 cm 2  e =  laser = 100  m,  = 20 mrad Luminosity gain only weakly dependent on laser pulse width  for laser pulses ~ 10’s of ps

Laser Figure of Merit laser P E max rate t (1%) option (nm) (W)(MeV)(KHz) (%)(min) Hall A UV ArF UV KrF Ar-Ion (IC) DPSS Fiber laser Fiber laser (counting mode) Energy-weighted asymmetry

Figure of Merit FOM comparisons on previous slide not entirely fair to fiber laser –DPSS laser crossing angle limited to 0.85 degrees for s=200 um spot size –Fiber laser can achieve crossing angle of 0.5 degrees for 100 um spot size Comparing “best” scenarios for each laser: –Fiber: Compton rate = 46 kHz –DPSS: Compton rate = 11 kHz Both systems can get an extra factor of 2 just by re- circulating the beam once

Fiber Laser Development Source group will develop 20 W laser in their lab –PO for 50 W fiber laser amplifier signed Matt Poelker and John Hansknecht will set up laser to deliver 50 W IR Shukui Zhang will undertake frequency doubling Hall C Compton group will develop laser transport –Transport into vacuum beamline, focusing –Alignment system (R. Jones) –Linear  circular polarization –Polarization monitoring, determination of “transfer function” This system should be relatively low risk – however, this particular configuration never attempted at JLab before –In the worst case, fall back to original plan (low duty cycle, pulsed laser)

This page intentionally left blank

Interaction Region

Open Items: Photon Detector Photon detector tests Zeroth order tests in photon beam would be useful Check global response Stability Signal speed Can we characterize detailed response (linearity) adequately at HI  S? –How well is the photon energy known?

Open Items: Data Acquisition We need to read out at least 2 detectors –Photon detector –Electron detector –What are the detailed requirements for each (channels etc.)? –Rates are high – assumedly we need detailed info event-by-event Other signals –Laser diagnostics –Beam conditions (epics readout fast enough?) Software and analysis

Open Items: Slow Controls Will need slow controls for: –Laser system (on-off, mirror adjustment?, focusing?) –Electron detector (motion mechanism) –Anything else?

Manpower Beamline (JLab): Competing with 12 GeV, other experiments for resources here Chicane (MIT-Bates) Laser system (JLab/UVa/?): – “JLab” (Matt, John, Shukui) will deliver laser –“JLab”/UVa (Dave, Kent, or designated alternates) will handle transport, diagnostics Electron Detector (Canada/Miss. State): remarkable progress in short amount of time Photon detector (Yerevan/HU): prototype in hand DAQ/software (?) Slow controls (?)  subsystems develop their own?

Schedule If we can meet these milestones, we should be ok – is this realistic? TaskResponsible InstitutionsPlanned Completion Date Dipole magnet construction MIT-BatesJanuary 2008 Finalize chicaneMIT-BatesJuly 2008 Photon detector testsYerevan/HUApril 2008 Photon detector final construction Yerevan/HUJanuary 2009 Fiber laser low power prototype JLab/UVaOctober 2007 January 2008? Final laser choiceJLab/UVaJanuary 2008 Laser transport setupJLab/UvaJuly 2008 Electron detector fabrication Winn./Man./TRIUMF/ Miss.St. October 2008 Compton InstallationJLabSpring 2009