TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.

Slides:



Advertisements
Similar presentations
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 20 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits and.
Advertisements

for a neutrinos factory
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
FCC-hh Injection and Extraction
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
PS-SPS days, January 18 th, 2006AB/BT Kicker and Septa status and expected performance at the 2006 start-up With input from: B. Balhan, E. Carlier, F.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
RWA, EPAC06 The LHC Collimation System R. Assmann, CERN/AB for the LHC Collimation Team EPAC 2006 Edinburgh.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
PS losses during CT extraction, a history about 30 year long... J. Barranco, S. Gilardoni CERN - AB/ABP.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
SEPTA and spares follow-up J. Borburgh for SEpta section.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Technology Department 1 TCDS material selection and qualification W. Weterings
Issues Raised by the Design of the LHC Beam Dump Entrance Window Ray Veness / CERN With thanks to B.Goddard and A.Presland.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Beam absorbers for Machine Protection at LHC and SPS
Energy deposition as function of intensity and emittance  The damage potential of a beam does not only depend on the total intensity Energy deposition.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
1 CAN WE KEEP THE CURRENT SYSTEM FOR LIU BEAMS ? Francesco Cerutti, Alessio Mereghetti, Joao Saraiva LIU-SPS Beam Scraping System Review 2013 Jan 22 contributions.
TPSG4 Run 3 Konstantinos Karagiannis, on behalf of the TCD Team – January 20 th 2016.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Dynamic structural analysis of absorbers with spectral-element code ELSE Yacine Kadi, Roberto Rocca, Wim Weterings - CERN Luca Massidda - CRS4 Workshop.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
BEAM LOSS MONITORING SYSTEM
Collimation Concept for Beam Halo Losses in SIS 100
LINAC4 ADVISORY COMMITTEE
National Research Center” Kurchatov Institute”
M. Tomut GSI Helmholtzzentrum für Schwerionenforschung
Proposal TDIS-TZM WP14 TDIS jaw validation testing
Options and Recommendations for TL and Dumps
Setup beam intensities for FCC-hh
Challenges of vacuum chambers with adjustable gap for SC undulators
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Septa requirements and suitable septa topologies for FCC
Target and Horn status report
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Thermo-mechanical simulations jaws + tank
FCC hh dump kicker - switch topologies and impact on beam
Septum protection challenges by LIU beams in the SPS
Federico Carra – EN-MME
BEAM LOSS MONITORING SYSTEM
HiRadMat Test Facility
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Presentation transcript:

TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings

Contents Scope Diluter calculations Validations of calculations Beam conditions Post irradiations steps References

Scope 2 types of septa protection elements exist in the SPS: – TPSG4, diluter to protect thick MSE septa in LSS4 SPS – TPSG6, diluter to protect thin MST septa in LSS6 SPS The first to be constructed and installed was TPSG4 phase 1 (in 2003). Developments from work on TCDS and TPSG6 showed that upgrade was needed for TPSG4 as well (phase 2, installed 2005) [5]. LIU-SPS beam parameters now available – more challenging for these protection devices (a phase 3 will be needed). All designs are based on simulations – need benchmarking.

Purpose of TPSG’s Protect Magnetic septa (MS downstream) from damage by the beam. – Protect MS copper coil from being deformed → ΔT <80 K – Limit water pressure rise in cooling channels of MS coil ΔP < 25 bar (tpsg6 to protect thin septum MST) (→ ΔT < 8 K) ΔP < 50 bar (tpsg4 to protect thick septum MSE) (→ ΔT < 15 K)

SPS LSS4 extraction layout (top view) TPSG4;3800 kg SPS LSS4: 6 MSE

Aperture: 20 x 63.5 mm 2 Water cooled copper conductor Vacuum mbar MSE Cooling flow per magnet: 160 l/min Water speed in septum: 9 m/s Operating water pressure: 24 bars Weight of full tank 2270 kg Static water pressure test: 80 bars Bake-able at 150°C

Absorber blocks are edge cooled to cope with continuous losses Dry weight 3800 kg Under vacuum, operating pressure in mbar range TPSG4 Active length: 3000 mm RP shielding under vacuum

Diluter calculations Nuclear calculations were done at CERN Thermal and mechanical dynamic calculations were done at CRS4 (Sicily) [2,3] Results were presented workshop on Materials for Collimators and Beam Absorbers (3-5 September CERN [4]

TPSG4 beam diluter In the first design (phase 1) the TPSG4 was 3.0 long and had the following material composition: 2.4m of graphite, 0.3m of a titanium alloy, and 0.3m of a Nickel based alloy The design has then been modified by substituting several graphite blocks with a CfC composite and by adding another 10cm long graphite block The three section were composed of several blocks each having a cross section of 30 x mm, the block length is mm CZ5 Ti 6Al 4V INCO718 CfC 1.75 Phase 1 Phase 2

TPSG4 beam load For the purpose of the analysis, the LHC ultimate beam intensity is considered as the worst case Intensity will increase with LIU-SPS (for HL-LHC), to around 2.5e11 p+/b, and beam sizes will also be smaller (0.75 and 0.30 mm in H/V) with reduced emittance PresentLIU-SPS Momentum450 GeV/c Time structure25ns x 72 x 4 Bunch intensity protons Total intensity protons Beam size H mm Beam size V mm

TPSG4 phase 2 results: diluter temperature increase  The temperature increase is similar to the results of phase 1  The max ΔT is found in the 1st and 2nd blocks, the beam is also highly focalized  The additional graphite block in phase 2 compensates the effect of the lower density of CfC.  The temperature increase is similar to the results of phase 1  The max ΔT is found in the 1st and 2nd blocks, the beam is also highly focalized  The additional graphite block in phase 2 compensates the effect of the lower density of CfC.

TPSG4 phase 2 results: max Stassi ratio  The CfC greatly reduces the resulting equivalent stresses  The results are acceptable for the graphite block, are well below the failure limit for the CfC  The stress ratio is high for the Ti and Inconel blocks, but these alloys have a ductile behavior  The CfC greatly reduces the resulting equivalent stresses  The results are acceptable for the graphite block, are well below the failure limit for the CfC  The stress ratio is high for the Ti and Inconel blocks, but these alloys have a ductile behavior Need beam test to see how this fails

CfC anisotropy Young’s modulus for the TCDS materials as a function of the temperature (detail)

Validation of calculation Presently several extraction protection equipments are installed in SPS and LHC (TPSG4, TPSG6, TPSN, TCDS, TCDQ). Protection of the downstream equipment relies fully on effectiveness of these diluters! All designs are based on simulation results. High energy variants (as in use in SPS and LHC) use CfC and graphite, with non isotropic mechanical properties. Validation of design is required: – for the behaviour of the non isotropic CfC – for the assumption that exceeding the Stassi limit for ductile materials is acceptable (Ti and Inconel blocks) – To demonstrate the MSE is properly protected by TPSG4

Proposed HighRadMat test set-up Required: vacuum gauges and ion pumps power supplies, for logging and pumping water pressure in MSE coil (24 bar) (MSE not powered, so no real cooling needed, but water under pressure needed, logging only possible at the coil entrance) BLMs Other diagnostics for TPSG – laser vibrometer etc. being discussed Installation and dismantling under nitrogen flow to achieve good vacuum TPSG4 (operational spare) MSE (second choice spare) Pumping module

Beam conditions Ideally, proton beam: /bunch, 288 bunches, 3.75 μm, 1.0 mm H x 0.4 mm V Requested beam time: 4 h Beam parameters: 1 mm H, 0.4 mm V Beam intensity: pilot + ultimate Intensity ramped up in steps: , , , , ,

Post-irradiaton analysis steps Evaluate data logged during test (vacuum, pressure, temperature, intensity, BLM’s). ALARA analysis needed Leak test of MSE coil Disassembly of TPSG4: inspection of absorber blocks Repair of TPSG4, as needed Renovate MSE

References [1] HighRadMat experiment request, sps/Beam%20Requests/HiRadMat_BeamRequestSurvey_HRM6_TPSGRP.docx sps/Beam%20Requests/HiRadMat_BeamRequestSurvey_HRM6_TPSGRP.docx [2] L.Massidda and F. Mura, “Dynamic Structural Analysis of the TPSG4 & TPSG6 Beam Diluters”, CRS4, Cagliari, Italy, June 2005.L.Massidda and F. Mura, “Dynamic Structural Analysis of the TPSG4 & TPSG6 Beam Diluters”, CRS4, Cagliari, Italy, June [3] L.Massidda and F. Mura, “Analysis of the Water Dynamics for the MSE-Coil and the MST-Coil”, CRS4, Cagliari, Italy, June 2005.L.Massidda and F. Mura, “Analysis of the Water Dynamics for the MSE-Coil and the MST-Coil”, CRS4, Cagliari, Italy, June [4] Workshop on Materials for Collimators and Beam Absorbers, CERN, 3-5 September 2007Workshop on Materials for Collimators and Beam Absorbers, CERN, 3-5 September 2007 [5] J. Borburgh et al., “MODIFICATIONS TO THE SPS LSS6 SEPTA FOR LHC AND THE SPS SEPTA DILUTERS”, EPAC2006, EdinburghJ. Borburgh et al., “MODIFICATIONS TO THE SPS LSS6 SEPTA FOR LHC AND THE SPS SEPTA DILUTERS”, EPAC2006, Edinburgh