Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Proton Economics Eric Prebys FNAL Accelerator Division.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims

Proton Plan PMG 4/18/05 E Prebys/J. Sims 2 Agenda Operations Report – E. Prebys Technical Progress – E. Prebys NuMI Target Status – D. Bogert Project Status and Cost Report – J. Sims

Proton Plan PMG 4/18/05 E Prebys/J. Sims 3 Operations Report

Proton Plan PMG 4/18/05 E Prebys/J. Sims 4 Proton Delivery In light of the NuMI target failure, it’s not meaningful to analyze separate NuMI and BNB progress separately. After summarizing initial NuMI performance, we will concentrate on total proton delivery:  Hourly rates: compare actual total rate to pbar+BNB+NuMI projections.  Integrated total: compare MiniBooNE actual to BNB+NuMI projections. Except for shutdown dates, these have not changed for 2005 since the November document.

Proton Plan PMG 4/18/05 E Prebys/J. Sims 5 Initial NuMI Progress

Proton Plan PMG 4/18/05 E Prebys/J. Sims 6 Hourly Proton Rate

Proton Plan PMG 4/18/05 E Prebys/J. Sims 7 Efficiencies

Proton Plan PMG 4/18/05 E Prebys/J. Sims 8 Overall “Peak to Week” Efficiency

Proton Plan PMG 4/18/05 E Prebys/J. Sims 9 Integrated Delivery (BNB)

Proton Plan PMG 4/18/05 E Prebys/J. Sims 10 Technical Progress

Proton Plan PMG 4/18/05 E Prebys/J. Sims 11 Scope Changes Criteria to be in plan (one of following):  Critical path to plan goals.  Expensive (>$200K)  Requires significant coordination across departments Descoped:  Instrumentation upgrades  Booster solid state RF Added (proposed):  Booster dump relocation  New booster notcher  Main Injector injection kicker mods  Pbar extraction kicker mods  Stage II working group

Proton Plan PMG 4/18/05 E Prebys/J. Sims 12 Progress Baseline plan  The majority of scheduled tasks have been assigned dates and populated with resources based on information provided by level 3 managers. Technical Progress Linac  PA Vulnerability – AD Effort tubes have been ordered Sale of Burle – discussed shortly  Quad PS – Proceeding with 300 A prototype test and specifications  Instrumentation – (descoped) Booster  Determine Rep Rate Limit – Ducar beginning to investigatge  Orbump – TD Effort - First Magnet is complete. 15% complete with the assembly of the remaining magnets (costs collected in Run II) AD Effort - Power supply specification and simulations are complete. Procurement is now underway.

Proton Plan PMG 4/18/05 E Prebys/J. Sims 13 Progress Booster  Correctors – TD Effort – Design and Early Procurements are beginning.  Hz Harmonic – Procurement proceeding for prototype test  Gamma T – Studies continue  Alignment Improvements – Put BPM offsets into databse  Drift Tube Cooling – (no significant progress)  Cavity #20 – (no significant progress)  SS RF PA’s – Descoped  Instrumentation Upgrade - Descoped  Booster Dump Relocation – NEW SCOPE Discussed shortly  Booster Chopper - NEW SCOPE Working on specifications

Proton Plan PMG 4/18/05 E Prebys/J. Sims 14 Progress Main Injector  Large Aperture Quads – TD Effort – Design and Procurement are nearly complete. Fabrication of the first unit is 30% complete.  Collimation – AD Effort - Beam loss studies in MI and MI-8 are ongoing. Residual Radiation measurements and simulations will begin soon.  NuMI MultiBatch Operations – Barrier Bucket Procurement, Mixed Mode Operations NEW SCOPE- Injection Kicker Replacement, Extraction Kicker Modifications  RF Upgrade – Discussed shortly Studies  1.05 Proton Study Group– NEW SCOPE – Discussed shortly

Proton Plan PMG 4/18/05 E Prebys/J. Sims 15 Burle Status Burle has been sold:  Buyer still confidential, but “foreign”, so must be approved by the government  Rumored to “sort of” have “something to do” with “tubes” already might mean test tubes, tube socks, tube tops, etc.  Must continue to support coaxitron for the Navy until ~2020  In light of that, it is claimed that we are still profitable. Current delivery schedule (21 total):  APR-05: 1  MAY-05: 3  JUN-05: 3  JUL-05: 2  AUG-05: 0  SEP-05: 2  OCT-05: 2  NOV-05: 2  DEC-05: 2  JAN-06: 2  FEB-06: 2 Standard order (mostly rebuilds) Proton Plan order (all new)

Proton Plan PMG 4/18/05 E Prebys/J. Sims 16 NEW SCOPE - Long 13 Relocation ( ) Even after the lattice improvements of recent years ( “dogleg fix”), the original extraction at Long 13 remains a major source of loss in the Booster. This extraction region is needed for  Short batches  Study cycles  RDF It is relatively straightforward and inexpensive (few hundred K$) to move this dump to the MI-8 line.  Move kickers from Long 12  Install spare extraction septum  Move power supplies  Use MiniBooNE test dump Loses RDF, but SY120 a better option for radiation studies. Working on detailed plan. Will do it in the 2005 shutdown.

Proton Plan PMG 4/18/05 E Prebys/J. Sims 17 Main Injector RF ( ) The Main Injector Upgrade path remains the single largest uncertainty in the Proton Plan  Might be possible to reach intensities of the current Plan without upgrades of any kind. Towards a decision  Proceed with two/PA prototype  Proceed with systematic studies in the Main Injector  Organize a workshop this summer Will consider the following –Potential of feed forward system –Potential and concerns with two PA solution –New RF system proposals. Will coordinate needs of current plan, Stage II Plan, and Proton Driver Generate a perfomance/price table  Goal: reach a decision for Stage I by end of FY05

Proton Plan PMG 4/18/05 E Prebys/J. Sims 18 NEW SCOPE - Proton Plan Stage II (1.05) In the wake of the BTeV cancellation, a committee formed to study options for maximizing proton delivery after the end of the collider program (~2009):  Mike Syphers (chair)  Paul Derwent  Jim Hylen  Sergei Nagaitsev  Ralph Pasquinelli  Eric Prebys Committee has met several times and is actively soliciting ideas from any interested parties. Report to Division Head June 1, NOTE: The actual implementation of the recommendations of this commitee is beyond the scope of the present plan.