Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.

Slides:



Advertisements
Similar presentations
First thoughts on polarized protons in the FCC and injectors Mei Bai, BNL and FZ Juelich John Jowett, CERN J.M. Jowett, Edinburgh 24/10/
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Beam-beam studies for eRHIC Y. Hao, V.N.Litvinenko, C.Montag, E.Pozdeyev, V.Ptitsyn.
Accelerating Polarized Protons Mei Bai Collider Accelerator Department Brookhaven National Laboratory PHNIX Focus, Feb. 24,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
Plans for Polarized Beams at VEPP-2000 and U-70 Yu.Shatunov BINP, Novosibirsk P S IN 2006.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Polarization in ELIC Yaroslav Derbenev Center for Advanced Study of Accelerators Jefferson Laboratory EIC Collaboiration Meeting, January 10-12, 2010 Stony.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
RHIC Store Energy Scan Mei Bai Collider Accelerator Dept. Brookhaven National Laboratory.
Thomas Roser SPIN 2008 October 10, 2008 The Future of High Energy Polarized Proton Beams Spin dynamics and depolarizing resonances Early multi-GeV polarized.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
Accelerating Polarized Protons to High Energy Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
Thomas Roser Derbenev Symposium August 2-3, 2010 Polarized Beam Acceleration In their seminal paper “Radiative Polarization: Obtaining, Control, Using”
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
Polarization of CEPC M. Bai Collider Accelerator Department Brookhaven National Laboratory, Upton, NY Dec , 2013 International workshop on.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Beam-beam effects in eRHIC and MeRHIC
Deuteron Polarization in MEIC
Large Booster and Collider Ring
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
Beam-beam R&D for eRHIC Linac-Ring Option
Possibility for polarized beam at J-PARC Summary of Satellite Workshop on Polarized Proton Beam at J-PARC Satellite Workshop Program: Overview of the status.
eRHIC with Self-Polarizing Electron Ring
Other issues and concepts under study Conclusions References
JLEIC Collaboration meeting Spring 2016 Ion Polarization with Figure-8
Current Status of Ion Polarization Studies
Report on Electron Polarization Study
Presentation transcript:

Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Outline Introduction – RHIC polarized proton setup Achieved performance – Polarization – Luminosity Plans for improvement Summary A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

SpinFest, August 7,

RHIC Polarized Proton Setup  Energy: 23.8 GeV ~ 250 GeV (maximum store energy) A total of 146 imperfection resonances and about 10 strong intrinsic resonances from injection to 100 GeV. A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

RHIC Polarized Proton Setup  Energy: 23.8 GeV ~ 250 GeV (maximum store energy) A total of 146 imperfection resonances and about 10 strong intrinsic resonances from injection to 100 GeV.  Two full Siberian snakes A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Snake depolarization resonance in RHIC  Location  In the presence of two snakes, with zero closed orbit distortion  The stronger the intrinsic spin resonance, the stronger the snake resonance 6 3/4 7/10 11/16 old working point current working point Py

Snake resonance observed in RHIC 7/10 snake resonance polarized protons were accelerated to an energy of G  =63, a location of a strong intrinsic spin resonance

How to avoid a snake resonance  Keep spin tune as close to 0.5 as possible -Snake current setting A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010 set the vertical tune to measure the beam polarization with different snake current expect no depolarization if the corresponding spin tune is very close to 0.5 8

How to avoid a snake resonance  Keep spin tune as close to 0.5 as possible -Snake current setting -Control the angle between the horizontal orbits at the two snakes 9

How to avoid a snake resonance  Precise control of the vertical closed orbit -Minimize the vertical closed orbit distortion to reduce the strength of even order snake resonances  Precise optics control – Proper working point at a location with no or negligible snake resonances – Minimize the linear coupling to avoid the resonance due to horizontal betatron oscillation – Minimize tune spread – Chromatic effect – Non-linear effects A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Polarization Performance: 100 GeV  Polarization transmission efficiency -negligible polarization loss during acceleration RUN 06 RUN 08RUN 09

Polarization Performance: 100 GeV  Polarization lifetime during store -No deterioration during store w/w.o spin rotator

Polarization Performance: 250 GeV  Polarization loss between 100 GeV and 250 GeV -Measured with CNI polarimeter

Polarization Tune Scan: 250 GeV acceleration 7/10 resonance 11/16 resonance 3/4 resonance Working pt for 250 GeV run

Polarization Profile Fill 10753, Yellow2 Fill 10486, Yellow2 Courtesy of A. Bazilevsky Sharper polarization profile for 250 GeV than for 100 GeV A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

How to Improve Polarization at 250 GeV? RHIC: – accelerate close to between 100 GeV and 250 GeV – Tighter control of optics and orbit Dispersion slope at the two snakes Local orbit at rotators – CNI polarimeter improvement AGS: – Horizontal tune jump quad to avoid polarization losses at horizontal resonances Source: – Upgrade to achieve ~90% polarization A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Luminosity Performance Courtesy of W. Fischer Polarization as measured by H Jet target, average of the entire beam distribution. For 250 GeV, sharper polarization profile was observed and hence, effective polarization is ~ 20 % higher

Luminosity Improvement: 9MHz Dedicated 9MHz for acceleration: Mike Brenann and Blaskiewicz – Provide better longitudinal match at injection to avoid the longitudinal emittance blowup – Longer bunch length during acceleration to reduce the peak bunch intensity. Hence, minimize the electron cloud effect to avoid transverse beam size blowup – Adiabatic switch to existing 28MHz cavity results in a shorter bunch length. For a 1 ev-s beam, expected the bunch length rms ~ 1ns. A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Luminosity Improvement: ELens Electron lens: W. Fischer, Y. Luo and et al – Low energy electron beam to provide a focusing len to compensate the beam-beam induced tune spread – Allows higher bunch intensity – Simulation by Y. Luo and et al

Luminosity Improvement: ELens RHIC Electron lens: W. Fischer, Y. Luo and et al – One 2.5m long 6 T super-conducting solenoid with field lines straight within ~ 0.2σ – Electron gun of current intensity 14A/cm^2 – Received $4 million ARRA fund – Expect a factor of 2 gain in luminosity – Expect to commission in RUN 2012 A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Luminosity Improvement for 250 GeV Increase bunch intensity – From 1.1x10^11 to 2.0x10^11 bunch intensity reducing beta* at 250 GeV – Run 09 shows 0.7 m beta* is the limit at 100 GeV. This is equivalent to a beta* of ~0.3 m at 250 GeV A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Summary of Achieved Performance and Projection p  - p  operation 2006(2009)(2011/12)(2014) Energy GeV / No of collisions … Bunch intensity / / Beta*m / Average L10 30 cm -2 s / 5530 / Polarization P % / 3570 A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010

Summary The successful story of RHIC as the world’s first/only high energy polarized proton collider proved the genius invention of Siberian snake works! Continuous efforts at RHIC to keep improving its performance to achieve its design goal for both polarization as well as luminosity – H tune jump quads in the AGS – Source upgrade to yield 90% polarization – Accelerating pp with Qy close to 0.67 from 100 GeV to 250 GeV – 9MHz accelerating cavity, Elens and etc to increase luminosity A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's 70th Birthday 8/2/2010 – 8/3/2010