R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.

Slides:



Advertisements
Similar presentations
Principles of I/O Hardware I/O Devices Block devices, Character devices, Others Speed Device Controllers Separation of electronic from mechanical components.
Advertisements

CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/27 A Control Software for the ALICE High Level Trigger Timm.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
Specification and Simulation of ALICE DAQ System Giovanna Di Marzo Serugendo.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
CHEP03 - UCSD - March 24th-28th 2003 T. M. Steinbeck, V. Lindenstruth, H. Tilsner, for the Alice Collaboration Timm Morten Steinbeck, Computer Science.
Sept TPC readoutupgade meeting, Budapest1 DAQ for new TPC readout Ervin Dénes, Zoltán Fodor KFKI, Research Institute for Particle and Nuclear Physics.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg 1 HLT and the Alignment & Calibration DB.
PCIe based readout U. Marconi, INFN Bologna CERN, May 2013.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
ALICE Data Challenge V P. VANDE VYVRE – CERN/PH LCG PEB - CERN March 2004.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
DDL hardware, DATE training1 Detector Data Link (DDL) DDL hardware Csaba SOOS.
System performance monitoring in the ALICE Data Acquisition System with Zabbix Adriana Telesca October 15 th, 2013 CHEP 2013, Amsterdam.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
1 Alice DAQ Configuration DB
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
The ALICE Data-Acquisition Software Framework DATE V5 F. Carena, W. Carena, S. Chapeland, R. Divià, I. Makhlyueva, J-C. Marin, K. Schossmaier, C. Soós,
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
NA49-future Meeting, January 26, 20071Ervin Dénes, KFKI - RMKI DATE the DAQ s/w for ALICE (Birmingham, Budapest, CERN, Istanbul, Mexico, Split, Zagreb.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
Modeling PANDA TDAQ system Jacek Otwinowski Krzysztof Korcyl Radoslaw Trebacz Jagiellonian University - Krakow.
PCI B ASED R EAD-OUT R ECEIVER C ARD IN THE ALICE DAQ S YSTEM W.Carena 1, P.Csato 2, E.Denes 2, R.Divia 1, K.Schossmaier 1, C. Soos 1, J.Sulyan 2, A.Vascotto.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
LHCbComputing LHCC status report. Operations June 2014 to September m Running jobs by activity o Montecarlo simulation continues as main activity.
Irina Makhlyueva ALICE DAQ group 28 February 2005 DATE multi-stream recorder.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
R.Divià, CERN/ALICE Challenging the challenge Handling data in the Gigabit/s range.
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
Filippo Costa ALICE DAQ ALICE DAQ future detector readout October 29, 2012 CERN.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Pierre VANDE VYVRE ALICE Online upgrade October 03, 2012 Offline Meeting, CERN.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Introduction to DAQ Architecture Niko Neufeld CERN / IPHE Lausanne.
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
The ALICE data quality monitoring Barthélémy von Haller CERN PH/AID For the ALICE Collaboration.
P. Vande Vyvre – CERN/PH for the ALICE collaboration CHEP – October 2010.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
DAQ thoughts about upgrade 11/07/2012
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
ALICE Computing Data Challenge VI
LHC experiments Requirements and Concepts ALICE
TPC Commissioning: DAQ, ECS aspects
ALICE High Level Trigger Interfaces and Data Organisation CHEP 2006 – Mumbai ( – ) Sebastian Robert Bablok, Matthias Richter, Dieter Roehrich,
Controlling a large CPU farm using industrial tools
ALICE – First paper.
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
J.M. Landgraf, M.J. LeVine, A. Ljubicic, Jr., M.W. Schulz
ProtoDUNE SP DAQ assumptions, interfaces & constraints
ALICE Data Challenges On the way to 1 GB/s
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
The LHCb High Level Trigger Software Framework
ALICE Data Challenges Fons Rademakers Click to add notes.
Use Of GAUDI framework in Online Environment
Implementation of DHLT Monitoring Tool for ALICE
Presentation transcript:

R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface

R.Divià, CERN/ALICE 2 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT components LDC/FEP DAQ Network GDC Mass Storage Servers RORC DDL Detector readout electronics ~ 430 ~ 290 ~ 500 ports ~ 40 DDL DIU DDL SIU HLT Network HLT node ~ 540 ports ~ 250

R.Divià, CERN/ALICE 3 ALICE off-line week, CERN, 9 September 2002 Goals Provide a mechanism to: Provide a mechanism to: u allow efficient resource sharing between DAQ and HLT u smooth transition between DAQ only and DAQ-HLT modes modes u transfer events DAQ  HLT with minimum overhead u give HLT access to the data u grant the HLT the capability to: m discard (part(s) of) an event m replace (part(s) of) an event m insert new data block(s)

R.Divià, CERN/ALICE 4 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT modes u Local: m LDC: local processing and decision  operate on data: discard/add/replace/compress m GDC: local processing and decision  operate on data: discard/add/replace/compress u Global LDC m global decision at LDC level m reject/accept full event u Global LDC & GDC m global decision at LDC level m reject/accept full or partial event u Global LDC-HLT Farm-GDC m global decision by the HLT Farm m reject/accept full or partial event

R.Divià, CERN/ALICE 5 ALICE off-line week, CERN, 9 September 2002 Local LDC LDCreadoutrecorder Raw DATA pool GDCDDL HLT-RORC hltAgent HLT DATA pool

R.Divià, CERN/ALICE 6 ALICE off-line week, CERN, 9 September 2002 Local LDC u Independent from all other levels u Infrastructure ready: m initialization and control of HLT-RORC m synchronization:  between DATE processes and hltAgent  within DATE framework (start/stop/reset/abort) m notification and transfer of events m allocation and run-time handling of memory banks m buffer manager u Zero extra network traffic & latencies u All tested OK

R.Divià, CERN/ALICE 7 ALICE off-line week, CERN, 9 September 2002 Local GDC GDCEventbuilder Raw DATA pool LDC HLT DATA pool hltAgent

R.Divià, CERN/ALICE 8 ALICE off-line week, CERN, 9 September 2002 Local GDC u Independent from all other levels u Infrastructure ready: m synchronization:  between DATE processes and hltAgent  within DATE framework (start/stop/reset/abort) m notification and transfer of events m allocation and run-time handling of memory banks m buffer manager u Recording library ready (synchronous & asynchronous) u All tested and ALICE Data Challenge IV

R.Divià, CERN/ALICE 9 ALICE off-line week, CERN, 9 September 2002 Global LDC LDCreadoutrecorderGDCDDL hltAgent readoutrecorder DDL hltAgent readoutrecorder DDL hltAgent readoutrecorder DDL hltAgent

R.Divià, CERN/ALICE 10 ALICE off-line week, CERN, 9 September 2002 Global LDC u Super-set of local LDC level m see support and status as for local LDC level u Inter-LDC hooks to be implemented m synchronization m communication u Synchronization needed on all LDCs m even the LDCs not participating to the HLT decision u Extra network latencies

R.Divià, CERN/ALICE 11 ALICE off-line week, CERN, 9 September 2002 Global LDC/GDC LDCreadoutrecorderGDCDDL hltAgent readoutrecorder DDL hltAgent readoutrecorder DDL hltAgent readoutrecorder DDL hltAgent

R.Divià, CERN/ALICE 12 ALICE off-line week, CERN, 9 September 2002 Global LDC/GDC u Super-set of global LDC level m see support and status as for local LDC level m see support and status as for global LDC level u Some LDC-to-GDC hooks to be implemented m protocol needed to accept/reject & define ROI u Extra network and protocol latencies at different levels m between LDCs m LDCs to GDC u Big impact on the event builder

R.Divià, CERN/ALICE 13 ALICE off-line week, CERN, 9 September 2002 Global LDC-HLT Farm-GDC LDCreadoutrecorderGDCDDL hltAgent readoutrecorder DDL hltAgent readoutrecorder DDL hltAgent readoutrecorder DDL hltAgent HLT Farm

R.Divià, CERN/ALICE 14 ALICE off-line week, CERN, 9 September 2002 Global LDC-HLT Farm-GDC u Super-set of global LDC/GDC level m see support and status as for local LDC level m see support and status as for global LDC level m see support and status as for global LDC/GDC level u Data transfer HLT Farm-to-GDC ready m use standard DATE recording library u HLT Farm-to-GDC hooks to be defined m protocol needed to accept/reject & define ROI u Extra network and protocol latencies u Big impact on the event builder

R.Divià, CERN/ALICE 15 ALICE off-line week, CERN, 9 September 2002 Food for thoughts u During the ALICE Data Challenge IV the event builders already accepted 1.8 GB/s sustained m Flat data pattern to saturate the network m Network & PC technologies from 2001 m Reduced set of LDCs (40) m Realistic set of GDCs (38)  one CPU unused (on dual-processor machines) u Global LDC vs. Local GDC: where is the cross-over?