1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.

Slides:



Advertisements
Similar presentations
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
Advertisements

Analysis of chip with 100 events, July 2001 Variation in pixel to pixel average ADC values (fixed pattern noise) Pixel ADC value event to event repeatability.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Evgeny Gushchin (INR,Moscow) 23-Feb-2009 Calorimeters meeting, CERN Status of PS/SPD LED tuning C-side : SPD, PS A-side : PS Some statistics, problems.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Analog FE circuitry simulation
Presentation transcript:

1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the LED timing scan of the ECAL/PRS sub- detectors;  ECAL HV and LED quality after CW upgrading;  PS/SPD HV and LED quality after HV upgrading and LED intensity tuning;  Problematic channels. LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP]  Last time, some of the winter shutdown detector upgrading works have been finished and an intermediate detector quality check was an actual task. LED timing scan test is one of the possible detector quality tests. This test was done for ECAL_C with upgraded CW bases and for PS/SPD with upgraded HV system and partially tuned by Evgeny LED intensities.  LED timing scan allows to perform a powerful test of the detector functional parts. The HV, LED monitoring and FE electronics performance and quality of the FE and HV recipes could be checked with this test.

2 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] Conditions of the LED time Scan data collection: ECAL_C side C_side file /daqarea/lhcb/data/2009/RAW/FULL/ ECAL /TEST/44102 ; rate 122 Hz, 101 steps, 800 ev/step; start =100ns ; step=1 ns; LED intensity = PHYSICS + corrected LED ch=9212; HV = PHYSICS recipe; FE recipe with delay=5 ns; PIN_FE recipe with delay=5 ns and Lat=150; 7. C_side file /daqarea/lhcb/data/2009/RAW/FULL/ ECAL /TEST/44105 ; rate 122 Hz, 101 steps, 800 ev/step; start =100ns ; step=1 ns; LED intensity = PHYSICS + corrected LED ch=9212 ; HV = PHYSICS recipe; FE recipe with delay=5 ns; PIN_FE recipe with delay=5 ns and Lat=150; PS /SPD A side / LEDTSB delay_step with Specs short_Reset. 1. PS_ A_side file /daqarea/lhcb/data/2009/RAW/FULL/ PRS /TEST/44201 ; 2.PS_ A_side file /daqarea/lhcb/data/2009/RAW/FULL/ PRS /TEST/44206 ; Conditions: rate 112 Hz, 101 steps, 800 ev/step; start 100 ns ;step=1 ns LED intensity = 1900,2800,1800,1730,1850,1800,2450,1700,2400,2500 cnts; HV = PHYSICS. Improvements: Now Specs_short_Reset instead of Command_Reset is used for initializing Delay Chip settings of LEDTSB. The problem (mentioned by Edu) with triggering signal oscillation disappeared. The scan with 100 steps is used now to exclude problem with PS/SPD data compression in case of TAE events. Only the adct0 data are used now for PS/SPD analysis. The 100 steps LED time scan data collection takes about 15 minutes with trigger rate about 100 Hz. LEDTSB Triggering output behavior before improvement

3 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] Each set of the LED time scanned data are grouped on one LEDTSB triggering channel. Each CALO sub-detector has ASCI connectivity file with description of which detector Cells, FE channels, LED intensity channels correspond of one LEDTSB output channel (for ECAL/HCAL it’s created using CALO DB). All CALO connectivity files are placed in directory: /scratch/everyone/akonDATA/CALOconnectivity0209/. Analyzed LED scanned data are plotted as curves of dependency FE channel integrator charge versus input signal delay (ADC counts versus LEDTSB delay time). Each plot includes up to 16 curves and each curve corresponds of one FE channel (= one detector cell). 25 LEDTSB channels are used for triggering PS/SPD side, 228 channels for each ECAL side and 26 channels for each HCAL side. A curve colour - marker type coding is shown on the next slide. Four colours and four marker types are used for coding 16 channels shown on each plot. The curve sequence corresponds the detector cell sequence into a connectivity file. Marker type coding. How to use scanned curves Typical 16 – channel plot of the scanned data.

4 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] Each plot has 16 curves with a colour - marker type coding: 1-st curve is blue with marker type 20, corresponds of a first channel number in a plot title; 2-nd curve is blue with marker type 21, corresponds of a second channel number in a plot title; 3-d curve is blue with marker type 22, corresponds of a 3-d channel number in a plot title; 4-th curve is blue with marker type 23, corresponds of a 4-th channel number in a plot title; 5-th curve is black with marker type 20, corresponds of a 5-th channel number in a plot title; 6-th curve is black with marker type 21, corresponds of a 6-th channel number in a plot title; 7-th curve is black with marker type 22, corresponds of a 7-th channel number in a plot title; 8-th curve is black with marker type 23, corresponds of a 8-th channel number in a plot title; 9-th curve is red with marker type 20, corresponds of a 9-th channel number in a plot title; 10-th curve is red with marker type 21, corresponds of a 10-th channel number in a plot title; 11-th curve is red with marker type 22, corresponds of a 11-th channel number in a plot title; 12-th curve is red with marker type 23, corresponds of a 12-th channel number in a plot title; 13-th curve is green with marker type 20, corresponds of a 13-th channel number in a plot title; 14-th curve is green with marker type 21, corresponds of a 14-th channel number in a plot title; 15-th curve is green with marker type 22, corresponds of a 15-th channel number in a plot title; 16-th curve is green with marker type 23, corresponds of a 16-th channel number in a plot title; Detailed table of the curve number coding

5 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] Expected FE channel responses on LED flashing About 99 % of SPD_C, PS_A and ECAL_C FE channels have expected response on LED flashing !

6 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] ECAL_C problematic channels There are two channels with behavior as shown on the plots. The possible reason is a bad connection of the delay line on the CW base.

7 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] ECAL_C problematic channels  There are few channels without response. The possible reasons are a bad interconnector connection, HV settings...  Some channels have significantly different amplitude. May be due to a bad value of the HV recipe. Could be checked.  LEDTSB_1 has few channels with not completely calibrated delay matrix (not critical issue). Additional board calibration will be performed.

8 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] PS problematic channels  There is one channel with very high response. The possible reasons is a bad trimmer.  Some channels have significantly low amplitude. To be tuned.  Few channels have a high pedestal and not sensitive to LED. Probably problem with VFE.

9 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] SPD_C problematic channels  There are few channels without response.  One group of the 16 channels has a very strange behavior. The possible reasons must be investigated.

10 ECAL/PRS quality check with LED system LHCb CALO meeting Anatoli Konoplyannikov [ITEP/LAPP] Conclusions  LED time scans have been done for upgraded parts of sub-detectors.  In my opinion, the HV and LED monitoring systems are in a good shape now. Only few tens channels must be repaired.  LED scanned and analyzed data were distributed to detector experts and placed on the online disk: /scratch/everyone/akonDATA.