Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Evolution of NGN and NGA scenario in Nepal Nepal Telecommunications Authority.
Slide 1 Access to Bandwidth: Proposals for Action Ilsa Godlovitch Regulatory Policy Directorate
Draft Policy GPP Network IP Resource Policy Advisory Council Shepherds: Scott Leibrand and Rob Seastrom.
The process of migration to BT’s next generation network Presentation for corporate businesses issue 2 8 July 2009 Information correct at time of publication.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
Always consult the current Carrier Price List. Examples based on 10 March 2010 Price List Uncontrolled when downloaded
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
Thank you.
Next Generation Access: A Global / Policy Perspective Maury D. Shenk 27 June 2007.
High Volume, High Value, High Margin Opal Ethernet Lance Spencer.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
©Ofcom NGN-based competition: An Ofcom perspective Dr Stephen Unger Director of Telecoms Technology 24 March 2005.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
STEERING BOARD Market sector representation ~ Debating Policy ~ Escalation of Issues ~ Agreement on when formal Consultation is required Engagement between.
Geoff Hammond Head of Revenue Assurance. Agenda Interconnect – CRAB the start Current Wholesale Revenue Assurance Focus PPC current position PPC Radial.
Standard Contract Forum 31 January Customer Suite, BT Centre, London.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
MIGRATION PROPOSAL: CONSULTATION FRAMEWORK Dave D’Arcy This Presentation provides a generic view of feedback received from Communications Providers during.
NGN Interconnect Update JOINING THE THREADS 25 May 2005 FOR WG DISCUSSION ON 3 JUNE.
PPC Industry Forum 2 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
Implementing Oftel’s Broadband Strategy John Russell 12 July 2002.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
The process of migration to BT’s next generation network Presentation for corporate businesses issue 1 August 2008 Information correct at time of publication.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
Standard Contract Forum 28 April Customer Suite, BT Centre, London.
1 TOT to NGN By Dr. Kamthon Waithayakul EVP, Office of Engineering TOT Plc.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum 16 September Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Multi-Service IP Interconnect 6 th May Multi-Service IP Interconnect A Multi-Service Interconnect Link to support PPCs PSTN/ISDN DataStream Multi-Media.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Obligatory Products: Consultation Closures Anthony Sheppard Portfolio Strategy.
BT announce their 21 st CN Plans Alastair Adamson ETUG Telecommunications Coordinator – 15/07/04 Does the Electricity Industry have any reason to be concerned?
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Legal and Business Services Legal and Business Services Standard Contract Forum 29th January 2004 John Ewbank.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Slide 1 Access to Bandwidth The Way Forward Peter Walker Director, Technology OFTEL
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Consult 21 Update - Agenda Consult21 Steering Board Remit Membership Detail Recent and Future Meetings Programme Plans Nigel.
Consult21 Consult21 Working Group – Broadband and LLU 3rd Meeting 19 April :00 – 14:00 WELCOME.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Consult21 Industry Input FAS INTERCONNECT A request from Industry as input to the Consult21 BB/LLU Working Group.
Quarterly update webcall on BT’s 21CN programme 26 th October 09 Welcome to the BT's 21CN programme is subject to consultation and further development.
MSIL Discussion with Industry Steve Wright/Doug Harrison 11 th January Issue 1.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
PPC Industry Forum, 03 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information.
Tim Wright BT’s 21st century network TRIS - TISPAN WG4 workshop on NGN Interconnection and Numbering Copenhagen 18 January CN Principal Consultant.
ITU Liaison on T-MPLS Stewart Bryant
ETSI/TRIS Workshop on NGN Interconnection Effects of incumbent migration to NGN on competing networks Paul Rosbotham 18 th January 2006.
Presentation transcript:

Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005

Private Circuit and PPCs First meeting 19 Jan 2005 – 23 industry reps from 12 companies Second meeting 23 Mar 2005 – 14 industry reps from 9 companies (including 1 MOLO for RBS) Next meeting May 26 th, just prior to regular PPC Industry Forum Up to 17th Jan – BT21CN statement was PC/PPC to be emulated 17th Jan – current PPC to stay, review sub-1M platform in 2008, keep SDH for others Panic over. Perhaps.

Scope to understand and track the impact of 21CN on Private Circuits (PCs), Partial Private Circuits (PPCs) and Wholesale Extension Services (WES) to ensure that existing product features are maintained where necessary to ensure that we work together to endeavour to avoid stranded assets at handover points and interconnect sites to work together to identify synergies with PPC handovers for physical layer interconnection to NGN

Method of Closure Clearance of issues raised and actions taken at PPCs Working Group meetings and Industry forums – Steering Board confirmation required for issues clearance Clear ownership of issues and actions which progress into the 21CN and non- 21CN product portfolio development stage

Issues 1 BES, BPC – under BB&LLU or PC&PPC WG? –Technicalities suggest one way, commercials say another –Co-chairs of each to attend the other WG DPCN platform review in 2008, possibly closure in 2011 Particular market segments concerned about alternative products with key characteristics that may differ – e.g. Utilities (National Grid, RECs etc) – do we need new PPC SoR? Analogue over Digital, but what about baseband copper?

Watching Brief 1 No impact on non-DPCN PPCs – but…. –John Morden has specified separacy, diversity, high- availability etc in his system request – but awaits system design feedback –PDH kit at third-party site will become obsolete – but likely to be stop for new supply but fill up what is there –New SDH delivery methods will be added via PPC forum, both Third Party and Point Of Handovers –No 21CN node data finalised to show Metronodes and MSAN mapping, so OLOs cannot plan network expansion with certainty - “new NIPP” –New SDH core, so move from current Mesh/MSH will cause service outage on existing traffic – scale, timing unknown

Issues 2 Point of Handover – multi-service capability –Exists now on SDH pipes - TDM for vocie, ATM for Datastream, TDM for PPCs –NGN interconnect WG proposing Ethernet over SDH and Ethernet –WES Industry forum asked for aggregation of Ethernet as ATM, MPLS and/or SDH – response says any Ethernet on SDH must tie in with 21Cn architecture and new products So now have current PPC and WES product lines tied to 21CN strategy –How to decouple and allow industry to develop with sensible building blocks ?

Issues 3 Stranded Assets, Node closures –Concern if Closure of BT SDH node sites but OLOs have interconnect –Offer last week – all current CSH and ISH nodes to continue. If closure needed, full debate with industry, then the SAN process. –Offers reuse of fibre to a BT site previously used for DLE, and feasibility on reuse of kit (though costs of new supply likely to be similar if not cheaper than refurbish) Did not include Tier 1 pricing to continue for current price control period (2008) No mention on impact if serving equipment moves to new site – BT to extend at their cost, but if removes separacy etc? SoRs for bulk shift from PoH 1 to PoH 2?

Watching brief 2 BTGS and OLOs need low-speed PPCs independent of MSAN offerings –Nowadays have a PPC and ISDN backup, or PPC plus PPC – so if low speed moves to SDSL and ISDN is on MSAN – then what? –Distance limit of copper and cost-hike to fibre –1M PC/PPC – innovative NTE from BT, offers N*64K Clear channel, uncontended bandwidth, side effects of BT core IP etc –Product innovation rate might be limited by changes BT can make on 21CN platform, original Datastream non-real time etc

Recap No impact on PPCs – but side effects and like-for-like feature options? Data to plan PPCs and MSAN/NGN interconnect – impact on OLO cost base, so drives OLO response to a SAN Clear Ownership PPC, WES, BES/BPC, RBS and development of new products in PPC and WES not held up for 2 years