1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 iBTF module Prototyping Version.
Present Procedure for cutting stuck casing on Drilling PLATFORM
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.
Beam Position Monitors MICE CM Harbin January, 2009.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Status of CLAS12 PCAL project
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
Open Frame Racks & Accessories. 2 Application ‣ 2/4-Post Open Frame Racks combine the mounting security of a cabinet with the accessibility of a rack.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Structural Drafting Connection Details and Gages.
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
The Microscope. The History of the Microscope Parts.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Telescope, installation and beam area B. Di Girolamo CERN.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
A-Frame Operation The A-Frame will provide support for odd shaped loads, loads where you are unable to get directly below the load, and for stabilizing.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Forklift pick set-up interfacing with a MCHP
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
CDMS II Shielding To Installation To Construction From Design.
PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
Removable Lower Service Floor for the Scibar & EC Support Structures Edward Chi May 25, 2006 Fermilab/PPD/MD.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
Kitakami Side AHCAL Assembly or anywhere in any detector.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Straw man layout for ATLAS ID for SLHC
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Planning for Proto-DUNE PD Installation and Cabling at CERN
ATLAS pixel module assembly flow
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Plan for the installation of the TAMU screen
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
VIEW SERIES Track Assembly & Installation
Endcap shielding senarios:
Station and Module Support Frames
HYBRID COOKTOP.
OT Survey & Adjustment Outline: Survey technique at present
Microscope Basics T. Trimpe
Alignment NOtes.
SVD group organization, schedule, milestones
Polarized 3He target installation
Diode Laser Experiment
Plan for completion of Task 2
Presentation transcript:

1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD

2 PMT supt. beam assy.(14), each beam can be mounted to the supt. angle beam individually. Each beam weights ~9.7 lbs. x,y & z adjustment. Shims and mounting hole to angle beam

3 Assuming install the lower removable floor for pulling out all fibers from 64 scibar Layer modules, the distance from top of Scibar modules to the top surface of the floor Grating in y dir. is ~ 13.34”. See floor-lower-scibar ppt for the floor design details.

4 Lower removable grating floor, gain monitors (2)

5

6 Install the first 8 PMT and the related cables and electronics after removing the 1 st module of floor grating

7 Remove more floor grating modules and install more PMTs’ and other electronics

8 Once the last module of the lower floor grating was removed, the scaffolds were Installed as showing for installing the last 16 PMTs’ & the related electronics, the distance between the top surface of the scaffold to the top of the Scibar module in Y dir. is ~ 24”. The middle floor will be also handy for any PMT re-alignment.

9 The view of the PMT assembly after taking off all the scaffolds and their supports.