Production Planning and Scheduling. Production Planning Also Known as Aggregate Planning Problem in Game: Set Production Every Period, Allocate Resources,

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Topics to be Covered 1. Capacity Planning
Operations Management Dr. Ron Tibben-Lembke
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Operations Management Aggregate Planning Chapter 13
Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BUAD306 Aggregate Planning. Determines the resource capacity needed to meet demand over an intermediate time horizon Typically months in duration.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Operations Management
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Review for Exam II—Mar 20, 2002 Dr. Burns. Exam Format  multiple choice  3 problems  Closed-book  Closed-notes  Closed-neighbor  BRING---pencil,
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Ardavan Asef-Vaziri Systems and Operations Management
Lesson 16 Aggregate Planning
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Chapter 12a Resource Requirements Planning: MRP and CRP.
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
AGGREGATE PRODUCTION PLANNING. Business Planning Exercise  Business plan is strategic in nature and addresses the following questions: Should we meet.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Aggregation To combine the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint heuristic.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Material Requirements Planning (MRP)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
13 Aggregate Planning.
Beni Asllani University of Tennessee at Chattanooga
Sales and Operations Planning
Dr Sh Salleh bin Sh Ahmad
Production and Operations Management
Aggregate Production Planning (APP)
Presentation transcript:

Production Planning and Scheduling

Production Planning Also Known as Aggregate Planning Problem in Game: Set Production Every Period, Allocate Resources, Meet Demand Set P t = Production for t W t = Workforce for t

Production Planning Inputs: Resources (Rough-Cut Capacity Planning), Forecast, Inventory, Policies, Costs Demand Options: Pricing, Shifting Demand, Promotion, Markets for New Demand, Partnering with Suppliers, Allowing Back Orders (Shortages) Supply (Capacity) Options: Hiring/Layoff, Overtime, Temporary Workers, Inventories, Subcontracting, Expediting

Relevant Costs 1.Change in Production (E.g. Hire/Layoff) Costs 2.Inventory Holding Costs 3.Shortage Costs 4.Payroll Costs 5.Subcontracting Costs 6.Expediting Costs

Scheduling Strategies Level Workforce Steady Output Match Demand, Chase Mixed, Game Given: Beginning Inv. – Demand + P t = End Inv.

Scheduling Techniques: (1) Heuristics Informal Rules that Appear to Work Rules are Developed (Often by Trial and Error) and Tested in Real World or Computer Simulation Advantage: Rules Can Be Realistic. Disadvantage: Not Optimum.

Scheduling Techniques: (2) Linear Decision Rule EOQ-Like Approach TRC = Payroll + Holding + Shortage + Change in P t = f(P t, W t ) Calculus Used to Find Best P t and W t E.g. P t =.2F t +.1F t F t+2 -.1I t +.1W t-1 Advantage: Optimum Given that Equations “Fit”. Disadvantage: Cost

Scheduling Techniques: (3) Search Rules Used with Simulation Educated, Computer-Driven, Trial & Error Advantage: Realistic Costs, Not Optimum but Close. Disadvantage: Uses Lots of Computer Time

Master Production Schedule (MPS) Similar to Production Plan Time Periods or “Buckets” are Smaller Multiple Products are Shown: Disaggregating Done by Heuristics or Linear Programming Example on Page 658

Summary of the Scheduling Process FORECAST  ROUGH-CUT CAPACITY PLANNING  PRODUCTION PLAN  MASTER PRODUCTION SCHEDULE (MPS)  MATERIAL REQUIREMENTS PLANNING (MRP)  CAPACITY REQUIREMENTS PLANNING  SHOP FLOOR CONTROLS VENDOR CONTROLS

MRP Material Requirements Planning Manufacturing Resource Planning (MRP II) Translates MPS into Schedule of Component Requirements, Both Order Quantities and Times

MRP Inputs Master Production Schedule (MPS) Bill of Materials (Parts List, p. 660) Inventory Status – On Hand Lead Times

Bill of Materials: Problem 3.1

Problem 3.1 a Ear Plugs (2 x 1000) = 2000 Aspirin (1 x 1000) = 1000 Gas Masks (5 x 1000) = 5000 Boxes (1 x 1000) = 1000 Labels (1 x 1000) = 1000 Cardboard (1 x 5000) = 5000 Wax (2 x 2000) + (.5 x 5000) = 6500 Labor Hours (.08 x 2000) + (.1 x 5000) = 660

Problem 3.1 b,c b.Adjustment for Scrap: Scheduled Units = MRP / (1 – Scrap %) Scheduled Units = 5000 /.97 = 5155 c.Standard Time= MRP / (1 - % Delay) ST = 0.66 / 0.8= Hours Actual Time= ST / Labor Efficiency AT = /.9= Hours