17-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May 22 -23, 2012 17 - PFDPU D. Gordon / W. Donakowski PFDPU Team.

Slides:



Advertisements
Similar presentations
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
1 PFP MSR, 8/21/2012 Particles and Fields Package Monthly Status Review (MSR) August 21, 2012 Dave Curtis, PFP PM.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
10c-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , c - Board Analysis Update Christopher Smith Mars.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
Main Electronics Package
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
15-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , SWIA (Solar Wind Ion Analyzer) J.S. Halekas.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Gayle K. Martin November 14, 2016
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Bill Donakowski Mechanical Engineer UCB/SSL
(EFW Systems Engineer) University of California, Berkeley
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS FM4/FM5 INSTRUMENT SUITE
LAT Requirements Verification in TVAC
Low Voltage Power Supply & Power Controller Board
University of California, Berkeley
Digital Sub-System Dorothy Gordon.
Integration and Test Organization Chart
Presentation transcript:

17-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , PFDPU D. Gordon / W. Donakowski PFDPU Team Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

17-2 MAVEN IPER May 22-23, 2012 Introduction Topic/ContentPresenterAllocated Time Duration Overview/Block DiagramD. Gordon0:05 Electrical (Status/Test Results) D. Gordon0:10 Mechanical (Status/Test Results) W. Donakowski0:10 VibrationW. Donakowski0:05 Thermal VacD. Gordon0:05 Wrapup /QuestionsD. Gordon0:05

17-3 MAVEN IPER May 22-23, 2012 Overview Electrical Components covered in this presentation: DCB REG IIB Remaining PFDPU resident boards are covered by the Instrument specific presentations. Mechanical presentation covers the entire PFDPU Vibration and Thermal Vacuum Procedures performed on the entire PFDPU

17-4 MAVEN IPER May 22-23, 2012 PFDPU Hardware Team DCB (Processor) –Dorothy Gordon REG (Power Supplies, Switches and Actuator Control) – Peter Berg and Dennis Seitz IIB (Instrument Power Regulators and Signal Distribution) –Chris Tiu Mechanical –William Donakowski QA and Manufacturing –Jorg Fischer –Chris Scholz –William Whitehead (visiting, R&QA) –Mike Raffanti PFDPU Resident Instrument Boards –SEP/DAP Team (SSL) –DFB/BEB Team (LASP) –MAG Team (GSFC)

17-5 MAVEN IPER May 22-23, 2012 Electrical Block Diagram IIB not shown, sits between LVPS(REG)/DCB and the Instruments REG2REG1DCB1DCB2

17-6 MAVEN IPER May 22-23, 2012 Relevant Documentation MAVEN_PF_SYS_004 – PFDPU to Instruments ICD MAVEN_PF_SYS_003 – Power Converter Requirements MAVEN_PF_PFDPU_001 – Data Controller Board Specification MAVEN_PF_SYS_021_PowerDistribution MAVEN_PF_SYS_014_Grounding MAVEN_PF_SYS_013 – Harnessing Drawing MAVEN_PF_SYS_016 – Connector Pinouts MAV-IDP-MEC-002 MAVEN PFDPU MAV-IDP-MEC-020 DAP Assy MAV-IDP-MEC-022 IIB Assy MAV-IDP-MEC-026 REG Assy MAV-IDP-MEC--028 DCB Assy Schematics & PCB Layouts (REG, IIB, DCB, FPGA Daughter Board) MAVEN_PF_TP_046_PFP_FM_Integration&Test MAVEN_PF_TP_042_REV A PFDPU_Vibration_Test Procedure MAVEN_PF_TP_044_PFDPU_Thermal_Vac_Test MAVEN_PF_TP_031_PFDPU_CPT MAVEN_PF_TP_045_PFDPU_LPT

17-7 MAVEN IPER May 22-23, 2012 Status/Test Results - DCB DCB and FPGA Daughter Board –Both Flight Boards have been received and have passed board level test MAVEN_PF_PFDPU_DCB_600C_TESTPLAN –Initial test using prototype FPGA daughter board –Final test/characterization using flight FPGA daughter board –Cleaning/Conformal Coat and final assembly completed –Following board level recheck, ready for PFDPU Integration FPGA –Final flight port completed as of 28 FEB 2012 –Static Timing Analysis predicts 21 MHz operation over temperature/radiation environment (FPGA SCLK = 16.8MHz) –Flattenned/backannotated simulation verification –All realtime tests successful

17-8 MAVEN IPER May 22-23, 2012 DCB and FPGA Daughter Board

17-9 MAVEN IPER May 22-23, 2012 DCB Current Measurements Actual current drain is somewhat less than predicted (FPGA Designs tools have tended to give pessimistic estimates). Draw on analog supplies has been reduced by keeping the ADC in standby mode most of the time. Stability of supplies has been verified with REG board. Power turnon profiles of FPGA supplies verified with REG/DCB boards (stable within 5 ms, 1.5V supply on prior to 3.3V supply crossing to a logic “high”). Voltage Nominal Current (PREDICT) Max Current (PREDICT) Measured On Flight Boards at Ambient +5VA20mA50mA17ma / 1 mA -5VA25mA50mA25ma / 1 mA +5VD5mA10mA1mA +3.3VD220mA450mA65 – 100 mA +1.5VD150mA350 mA95 – 110 mA

17-10 MAVEN IPER May 22-23, 2012 Status/Test Results - REG REG FM1

17-11 MAVEN IPER May 22-23, 2012 REG Test/Qualification Tests in process for FM1 and FM2: System clock sync Main converter inrush current Output switches function Output voltage regulation and ripple over output load and input voltage ranges Efficiency versus input power Main transformer waveforms Current and voltage monitor calibrations Output over-current sense function On board thermometer Actuator section inrush current Actuator function Actuator dead man timer function Status: Improved resistor is required for the Current Monitor (IMON) circuit Awaiting Flight parts (Vishays) (due 5/14) Soft start modification/test underway

17-12 MAVEN IPER May 22-23, 2012 IIB Flight IIB

17-13 MAVEN IPER May 22-23, 2012 IIB Test/Qualification/Status Flight board tests completed: Parts installation inspection Connector pin-to-pin measurements Tantalum capacitor power-on polarity Power converter waveforms Output voltage regulation Output voltage ripple Input current ripple Power efficiency Measured Efficiencies LPW Half load: 73.7% Full load: 77.8% SEP Half load: 73.7% Full load: 78.6% MAG1 Half load: 62.6% Full load: 70.1% MAG2 Half load: 61.2% Full load: 70.6% Status: Cleaning completed Conformal Coat scheduled for week of 14 MAY 12

17-14 MAVEN IPER May 22-23, 2012 PFDPU CPT and LPT Comprehensive and Limited Test Plans –Exercise the DCB and REG (and the IIB as needed) Focus on subsystems not covered by the Instrument CPTs –Flexible configuration Can be run with any number of instruments integrated Option to perform MAG Heater Control and Actuator Subsystem checkouts Can be performed with GSE or Instrument Hardware –Analog Housekeeping logged to facilitate trending Most test executions run at 28V IN to allow comparisons between various results CPT –One hour test per instrument Goal: run the CPT for the entire suite within 1 day Tests both sections of the PFDPU (redundant DCB/REG) and both S/C Interfaces (redundant A/B sides) LPT –Reduced version of CPT (runs in about 10 minutes) Goal: run the LPT for the entire suite in about 1 hour –Operates on one section of PFDPU and one S/C Side (configurable per test)

17-15 MAVEN IPER May 22-23, 2012 PFDPU Integration and Test Flow

17-16 MAVEN IPER May 22-23, 2012 PFDPU PFRs The majority relate to manufacturing issues, minor layout or parts tuning Most require minor rework, for some the disposition is to “leave as-is” Solutions are implemented, we are awaiting final sign-off PFR_052 (REG) involves damage requiring parts replacement FRB held Analysis identified damaged or stressed parts All damaged and stressed parts replaced and re-tested Ready to close

17-17 MAVEN IPER May 22-23, 2012 Requirements Validation (FRD and ERD Based) FRD Based ERD Based

17-18 MAVEN IPER May 22-23, 2012 Requirements Validation (ICD Based) Snapshot of PFDPU Requirements (First 6 out of 25 PFDPU Related Requirements shown above). Excerpted from MAVEN_PF_SYS_033B_VerificationMatrix Most items verify the S/C to PFDPU Interface (both functional and low level hardware) Some items are tested/verified with the FM I & T Procedure; others will require dedicated test reports. Some functional tests are generic and can be performed on the ETU with results extrapolated to Flight.

17-19 MAVEN IPER May 22-23, 2012 MAVEN PFDPU Particle and Fields Data Processing Unit Bill Donakowski UCB/SSL Mechanical Engineer

17-20 MAVEN IPER May 22-23, 2012 PFDPU Overview  11 Individual Cards Bolted Together  Open Frames, 6061 T6 Al  Separate S/C Attach Bracket  Bolted to S/C via 6 X 8-32 bolts  Thermally coupled to S/C  Electrically grounded to S/C  Ground Straps  Straps provided by L-M  Black anodized exterior surfaces  No Thermal Blankets  Mass CBE 7 Kg

17-21 MAVEN IPER May 22-23, 2012 PFDPU STATUS and SCHEDULE Analysis (FEM Dynamics/Steinberg) Completed Box Structural Enhancements Incorporated Flight Hardware Status –UCB Flight Hardware Build nearly complete (SEP/REG/DCB/IIB) –LASP hardware (BEB/DFB) delivery imminent –GSFC hardware (MAG, ACHE) delivery imminent Card Electrical Check-out May/June 2012 Complete PFDPU Build-Up July 2012 Vibration Testing August 2012 TVAC Testing August - September 2012 (UCB/SSL)

17-22 MAVEN IPER May 22-23, 2012 Structural Dynamics Analysis Steinberg Fatigue Life Analysis/FEM Analysis Approach Utilized Concern: Failure of electrical components (primarily leads of large chips) due to fatigue Analysis Completed on Individual Frames and PFDPU Assy –UCB (Pankow) for DEB, REG, SEP, IIB –LASP/GSFC for MAG, DFB, REG –Analysis reviewed and approved by Project Project Design Guidelines Established –Individual Cards redesigned to increase stiffness –Max card stiffness below 300 Hz –PFDPU Structural Packaging stiffness increased Minimum 600 Hz (2 X 300 Hz) Per Steinberg approach

17-23 MAVEN IPER May 22-23, 2012 Box Structural Enhancements Each Side Box Frame Walls Thickness increased to.150” (was:.100”) (6061 T6) Frame Side Walls Thickness Increased; New Shear Panels Introduced 4-40 Screws and Washers New 2 X Side Shear Panels,.080” Thick (6061 T6)  PCBs bonded to Frames  Hysol EA9309 w/ Boron Nitride Filler  SEP, REG, IIB, DCB  Increases Box Stiffness  Allows better thermal path to Frames LASP/GSFC Cards Frames redesigned by host organizations to stiffen frames

17-24 MAVEN IPER May 22-23, 2012 PFDPU Vibration Testing Test Procedure MAVEN_PF_TP_042_PFDPU_Vibration_Test Scheduled for August 2012 First test of completed Unit Protoflight Hardware Hardware to be kept clean by bagging Standard Test Protocols Pass/Fail Criteria Box unpowered throughout testing Pre- and Post- electrical checkout to be performed at SSL

17-25 MAVEN IPER May 22-23, 2012 MAVEN PFDPU TVAC Testing

17-26 MAVEN IPER May 22-23, 2012 PFDPU TVAC Testing Test Procedure –MAVEN_PF_TP_044_PFDPU_Thermal_Vac_Test Scheduled for August - September 2012 PFDPU TVAC to be performed in SSL Chamber (Snout 1) Hardware to be kept clean by bagging during transfer to Thermal VAC Chamber Overview has been presented by Thermal Engineer –One non-op cycle from –30 to +60C –7 operational cycles from –30 to +50C (as measured at the baseplate) –Bakeout at 60C following the Electrical Testing

17-27 MAVEN IPER May 22-23, 2012 PFDPU TVAC Cycles Performance test executed at each hot and cold plateau CPT (performed at first and last hot/cold cycles) verifies both redundant sections of the PFDPU, along with PFDPU resident instrument functionality (such as Actuators and Heater subsystems) Flight Magnetometers in chamber with PFDPU for TVAC qualification Cycle Number : n n

17-28 MAVEN IPER May 22-23, 2012 PFDPU TVAC Functional Plan Overview

17-29 MAVEN IPER May 22-23, 2012 PFDPU TVAC Hardware/GSE Configuration

17-30 MAVEN IPER May 22-23, 2012 PFDPU – Wrapup/Questions Much progress since CDR of May 2011 Flight Hardware has been built and associated risks retired –Manufacturing: CGA624 manufacturing successful –Mechanical: Improvements to PFDPU allay vibration concerns –Thermal: Heat conduction path enhancements & lower than expected current draws Hardware/Software Integration validated with the ETU PFDPU –Operates as a parallel/alternate PFDPU Testbed –ETU Instruments have been combined into this setup –Available for “dry runs” of the CPTs, RTSs and software testing High-Fidelity Simulator (ETU DCB and REG) functioning successfully at Lockheed-Martin since March’12 delivery Integration of Flight PFDPU proceeding Next Steps: Environmental Testing –EMC => Vibration => Magnetics => TVAC

17-31 MAVEN IPER May 22-23, 2012 Backup Particle and Fields Data Processing Unit

17-32 MAVEN IPER May 22-23, 2012 Controlling Documents Mission Requirements –MAVEN_PF_QA_002, PFP Mission Assurance Implementation Plan –MAVEN-PM-RQMT-0005D_MRD.xlsx –MAVEN-PFIS-RQMT-0016D+_ xlsx –MAVEN_PF_SYS_033B_VerificationMatrix.xlsx Systems Requirements Document –MAVEN_PF_SYS_003 – Power Converter Requirements –MAVEN-SYS-RQMT-0010 – Environment Requirements Interface Control Documents –MAVEN_PF_SYS_004I_PFDPUtoInstrumentICD –MAVEN-SC-ICD Spacecraft to PF ICD –MAV-IDP-MEC-003 MAVEN PFDPU MICD

17-33 MAVEN IPER May 22-23, 2012 PFDPU Driving Requirements (1)

17-34 MAVEN IPER May 22-23, 2012 PFDPU Driving Requirements (2)