18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
23/08/20081 RBI.816 Operation First aid on RBI.816 converter control J. Wenninger.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
The Stripping Foil Test Stand in the Linac4 Transfer Line
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
Power Supply & Electrical Engineering for sustainable science
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
SPSU – May 19, 2009 – Resources needed for SPS coating project– J. Bauche 1 Coating of the SPS Main Dipoles Vacuum Chambers: Resources Needed for Project.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
CERN Marc Magrans de Abril MPP – RBI DCCT Incident Beam Lost in TI2 Event Analysis and Proposed Mitigations SPS and LHC MPP
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
CONS and HL-LHC day Analysis of needs from TE-EPC
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
CT Hardware Overview and Issues
Testing of SC Magnets Status - November 2010
East Hall under construction
LIU – EVM status and next steps
AD consolidation activities in LS2
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
Renovation of the 45-year old PS magnets
LIU Wire Scanner Series Costs
Coldex disinstallation
SPS Injection BIS - Draft requirements
Presentation transcript:

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics SPS supercycles –Design optimization Generalities Power converters characteristics BB4 building Power converter renovation Provisional budget Vacuum chamber protection CNGS and TI8 main bend powering with electronic switch CNGS and TI8 main bend powering with mechanical switch CNGS transfer line cycle –Status in February 2002 –Summary

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 2 Introduction

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 3 Specification (magnet characteristics)

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 4 Specification (SPS supercycles) The second cycle is very restricting because we have to change the TI8 cycle to a CNGS cycle very quickly and it is foreseen to use the same power converter to feed both main bend chains (TI8 and CNGS) one after the other.

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 5 Design optimization (generalities) The CNGS transfer line and the LHC transfer lines will be part of the SPS system. All the power converters will be controlled by the MUGEF. The MUGEF is the present SPS remote control system. All the big converters will be pulsed for economical reasons (electrical power and thermal design). A maximum of power converters will be recuperated from LEP and SPS. The MBI magnets (TI8) and MBG magnets (CNGS) were specially designed to re- use the LEP main bend power converters. To reduce the CNGS project cost, it was decided to use the same power converter to feed MBI or MBG via a power switch (this solution saves about 1.5 million CHF). All the power converters for TT41 will be installed in BB4 (existing building close to the shaft).

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 6 Power converter characteristics

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 7 BB4 building The power converters will be installed in an existing building. It will need to be cleaned and the false floor will be adjusted to receive the power converters (this cost is in ST budget).

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 8 Power converter renovation The old power converters coming from SPS and LEP need refurbishing to improve their reliability New electronics crate for regulation and remote control New DCCTs (Direct Current Current Transformers) New motor-driven circuit-breaker Cabling modifications for new electronics adaptation and electro-magnetic compatibility improvement For the power parts of the power converters, the price of the refurbishment is about 30% of new converters.

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 9 Provisional budget 17 old converters + 2 spares + 18 MDGV/H ( spares) + 1 New New electronics + DCCTs20x12=240 LEP converter modifications with new MCB12x8=96 SPS converter renovation7 units242 Power electronic switch for MBG175x1=175 New COD for MDGV/H18x2.5=45 New power converter 400A/125V40x1=40 Spares30 Total868 Manpower (installation + commissioning)40 Total908 Remote control system (MUGEF, installation + commissioning)100 Total1008 kCHF

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 10 Vacuum chamber protection In case of power converter fault or power converter drift, there is a significant risk of irradiation and even perforation of the vacuum chamber. We have to protect the vacuum chamber. To do that, the idea is to measure all the power converter currents in real time, to check if all are inside the tolerances on the flat top and to send a global extraction permit signal or an extraction abort signal to the kickers some milliseconds before extraction. This new development must be done for the LHC transfer lines where the problem is more critical. CNGS will profit of this. This work is in a process of realization by the remote control team in our group with the MUGEF system. The first results in the laboratory are promising.

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 11 CNGS and TI8 main bend powering with electronic switch To comply with the SPS supercycle specification, we must use an electronic switch. Since it is not a safe element, if we want to give access in TI8 while CNGS is running, we will need mechanical switches to disconnect the MBI.

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 12 CNGS and TI8 main bend powering with mechanical switch only With more time between LHC cycle and CNGS cycle (~20s) and a number of operations limited (a few per day), it would be possible to use an easier and cheaper design. With only one mechanical switch, we can gain ~ 100 kCHF.

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 13 CNGS transfer line cycle In a transfer line, the only significant performance portion is the flat top for the passage of the beam. But, to reduce electrical consumption and cooling power, we have to decrease the r.m.s. current value as much as possible. The CNGS cycle is short. It is difficult to reduce the r.m.s. value because it involves high dI/dt. In addition, we need a flat top length of about 300 ms to reach the right values without overshoot. The initial estimate was 60% of the flat top value but with optimized current references, we can assure 55%.

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 14 Status in February 2002 The power converters coming from SPS are already refurbished, delivered to CERN, cost committed or already paid. The new power converters for the small correctors (MDGH/V) are delivered to CERN, cost committed or already paid. The new power converter for the big corrector (MDS) is not yet ordered. For the power converters coming from LEP and for MBI/MBG sharing system, nothing has been done yet. For the remote control system, 80% of the cost is committed. Budget situation:

18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 15 Summary Globally, for CNGS, the power converters and their control system can be looked upon as a copy of the LHC transfer line power converters. But: we have to study, design and manufacture the switch for MBI and MBG supply: - More difficult and expensive with electronic switch but runs with supercycle. - Easier and cheaper with mechanical switch only (gain ~ 100 kCHF) but waste of time during change of cycle (~ 20s) and number of operations limited (a few per day). If this solution is chosen, it will be possible to add the electronic switch in the future without problem (just money wise). Presently some expenses have been delayed. If the situation is clarified in 2002, there will be no consequences on the planning (start up 2005), nor on the cost. If it is not the case, there will be consequences on both aspects.