City of Gooding Town Hall Meeting October 29, 2013.

Slides:



Advertisements
Similar presentations
Simple Tabletop Exercise Objectives:  Evaluate ER preparedness and crisis management  Develop a procedure to simultaneously and efficiently handle widespread.
Advertisements

LEED NC Water Efficiency INTENT & CODE Slide Editor: James A. Strapko LEED Source:
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Hydraulic Optimization of the Northern Water Supply System Presentation by: Tom Charles, P.E., DEE Jim Kriss, P.E. Jennifer Wendrowski, E.I.T. September.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
City of Gooding FLOOD IRRIGATION SYSTEM Town Hall Meeting September 5, 2013.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
WATER RESOURCES STRATEGY IMPLEMENTATION Mayor Martin J. Chavez City of Albuquerque, New Mexico 2005 Urban Water Council Albuquerque, New Mexico.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
Rainwater Conservation System Town of Cary Senior Center Facility.
Is there a Drought in Ventura? City Manager’s Report July 16, 2007.
Simple Tabletop Exercise Objectives:  Evaluate chemical supply alternatives  Determine interdependencies between the utility and other infrastructures.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Demands, Supplies & Priorities. Demand Sectors Irrigation Livestock Mining Industrial Commercial Ecosystems Domestic Total Water Demand Major Cities.
Water System Planning Study
What are some global concerns about water? Where is most of the water? Most valuable resource Less than 3% is freshwater Most of that in unavailable.
Determination of Ellenburger Aquifer Sustainability
City of Gooding Town Hall Meeting October 2, 2013.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014.
ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Page 1 Metropolitan Local Government Group Recycled Water Scheme For Metropolitan.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
1 Public Hearing User Rate Adjustments April 8, 2008.
Geospatial Analysis of the Big Spring, TX Area. Types of Wastewater Reuse Non-Potable Reuse Watering lawns Industrial cooling Indirect Potable Reuse Aquifer.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
Metropolitan Council Regional Groundwater Flow Modeling Twin Cities Metropolitan Area Water Supply: March 11, 2008 Lanya Ross Senior Environmental Scientist.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Home Water Supply Basic Facts a Homeowner Needs to Know
Where is Cambrai located ? Cambrai is located in the North of France, about 180 kilometers far from Paris. How many inhabitants are there in Cambrai ?
Monthly Reporting on Drought Response
Lecture (11): Water Distribution Systems
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Outline of Presentation
Town of Dunn Sanitary District No. 3
Name: _________________ Class: ________
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
City of Pilot Point 2018 bond election
WSAC Decision Making Framework
Future Water Supply Evaluation
City of Sunrise Wastewater Reuse Program
OBJECTIVE HYDROSPHERE
Out and About at City Hall
Local Government.
Presentation transcript:

City of Gooding Town Hall Meeting October 29, 2013

2 OLD SYSTEM November 5, 2013 BOND ELECTION Bond = $5,000,000 NEW RELIABLE SYSTEM Objectives OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

3 Old System  Non-potable irrigation system  Drinking water system OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

4 Old System  Non-potable irrigation system Deteriorated beyond repair Continued use is not practical  Drinking water system Non-compliant OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

5 New Drinking Water System  Water Facility Planning Study (WFPS) Evaluate existing system Develop alternatives to improve the system Select preferred alternative  Design selected alternative  Project construction OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

6 New Drinking Water System  Existing water system Insufficient water rights OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Ground Water Rights 3,164 gpm Well Pumping Capacity 3,543 gpm Redundant Supply 2,025 gpm Max Day Demand 2,264 gpm

7 New Drinking Water System OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS By 2017 demand is greater than redundant supply while using gravity irrigation system

8 New Drinking Water System OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Preferred alternative – Alternative 3A

9 New Drinking Water System OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

10 New Drinking Water System OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS  Estimated increase in monthly user rates Alternative 3A eliminates yearly gravity irrigation charge of $39.91/lot/year

11 Water Rate Comparison OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

12 Water Rate Comparison OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

13 Water Rate Comparison OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

14 Selected Alternative Cost OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Aquifer Recharge project – Water Rights – additional Transmission Improvements

15 New Drinking Water System OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

16 NEXT STEP: OCTOBER 29, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Gooding Mayor and City Council Walt Nelson, Mayor Vern France Mitch Arkoosh Diane Houser Mel Magnelli Keller Associates, Inc. Jim Mullen, P.E. Oksana Roth, E.I. (208) Bond Election November 5, 2013