RTTC rack status Apr. 14 th 2005 Loïc Brarda, CERN.

Slides:



Advertisements
Similar presentations
A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
Advertisements

POSÉO by POSLIGNE ® retail PC POSÉO by POSLIGNE ® retail PC Dual Core 1.8 Ghz Processor INTEL 945G + ICH7R chipset 1 Go DDR2 RAM up to.
Install L2 Switch Head End CATV
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
Computer Hardware and Procurement at CERN Helge Meinhard (at) cern ch HEPiX fall SLAC.
Group 11 Pekka Nikula Ossi Hämäläinen Introduction to Parallel Computing Kentucky Linux Athlon Testbed 2
Walls crates cables gas chambers electronics CERN adb.
Cluster Computers. Introduction Cluster computing –Standard PCs or workstations connected by a fast network –Good price/performance ratio –Exploit existing.
Cluster computing facility for CMS simulation work at NPD-BARC Raman Sehgal.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Computing/Tier 3 Status at Panjab S. Gautam, V. Bhatnagar India-CMS Meeting, Sept 27-28, 2007 Delhi University, Delhi Centre of Advanced Study in Physics,
Corporate Partner Overview and Update September 27, 2007 Gary Crane SURA Director IT Initiatives.
Embedded Sales Meeting COM Express Carrier. COM Express Carrier Card What is it? –Two PMC slot or two XMC slot on the top side of the board and one COM.
Computer Co-ordinators Day – Sydney Region ASI Solutions T4L Offerings.
Online Systems Status Review of requirements System configuration Current acquisitions Next steps... Upgrade Meeting 4-Sep-1997 Stu Fuess.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Objective  CEO of a small company  Create a small office network  $10,000 and $20,000 Budget  Three servers (workstations)  Firewall device  Switch.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Garrison Vaughan, Kyle Nester, Anthony Taliercio.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
TRIUMF Site Report for HEPiX/HEPNT, Vancouver, Oct20-24/2003 – Corrie Kost TRIUMF SITE REPORT Corrie Kost Head Scientific Computing.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
Sandor Acs 05/07/
Network Setup Assignment Chris Moore, Kwan Tonpoobaln, Jon Light.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
HPCVL High Performance Computing Virtual Laboratory Founded 1998 as a joint HPC lab between –Carleton U. (Comp. Sci.) –Queen’s U. (Engineering) –U. of.
D0SAR - September 2005 Andre Sznajder 1 Rio GRID Initiatives : T2-HEPGRID Andre Sznajder UERJ(Brazil)
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
PDSF at NERSC Site Report HEPiX April 2010 Jay Srinivasan (w/contributions from I. Sakrejda, C. Whitney, and B. Draney) (Presented by Sandy.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
Billy Coss Alex Newton SMALL BUSINESS NETWORKING EQUIPMENT.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
The LHC PC Rack Project Fred Wickens On behalf of the LHC PC-Rack Study Group 10th LECC Workshop Boston Sep 2004.
Our Small Company Jamel Callands, Austin Chaet and Carson Gallimore.
KOLKATA Grid Site Name :- IN-DAE-VECC-02Monalisa Name:- Kolkata-Cream VO :- ALICECity:- KOLKATACountry :- INDIA Shown many data transfers.
Confidential 1 Server UPS (shore) Port SIIMulator (shore or Rutgers) (4) Hot swap RAID disks DACNet Server (shore) 20” Flat Screen (shore)
PC clusters in KEK A.Manabe KEK(Japan). 22 May '01LSCC WS '012 PC clusters in KEK s Belle (in KEKB) PC clusters s Neutron Shielding Simulation cluster.
News from Alberto et al. Fibers document separated from the rest of the computing resources
Weekly Report By: Devin Trejo Week of June 21, 2015-> June 28, 2015.
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
DIT Campus Network Final Presentation Team Members Honoratha Shayo Vincent Jacob Ivan Masue Fredrik Andersson Ombeni Mnzava Sylvester Kimbi.
LSST Cluster Chris Cribbs (NCSA). LSST Cluster Power edge 1855 / 1955 Power Edge 1855 (*LSST1 – LSST 4) –Duel Core Xeon 3.6GHz (*LSST1 2XDuel Core Xeon)
Common meeting of CERN DAQ teams CERN May 3 rd 2006 Niko Neufeld PH/LBC for the LHCb Online team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Status of the NA62 network R. Fantechi 23/5/2012.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Dell PowerEdge Blade Server PDVSA Jun-05
1062m0656 between 10692m2192 DS/ICI/CIF EqualLogic PS6510E
Bernd Panzer-Steindel CERN/IT/ADC1 Medium Term Issues for the Data Challenges.
F-Secure Messaging Security Gateway
CALICE TDAQ Application Network Protocols 10 Gigabit Lab
ICEPP, University of Tokyo
Status of LHCb PC Farm prototype
Ingredients 24 x 1Gbit port switch with 2 x 10 Gbit uplinks  KCHF
Napatech Acceleration Platform
ALICE T2 / FAIR Scope of the Meeting:
Experience of Lustre at a Tier-2 site
Power couple. Dell EMC servers powered by Intel® Xeon® processors and running Windows Server* 2016, ready to securely handle dynamic business workloads.
Promo prices are valid until 28/2/19
Promo prices are valid until 30/4/19
Operating Temperature
HP SERVERS & OPTIONS PRODUCTS THAT DELIVER
QMUL Site Report by Dave Kant HEPSYSMAN Meeting /09/2019
Dell ™ PowerEdge R320 E GB 1TB:- 57,900 Baht
Carlos Solans TileCal Valencia meeting 27/07/2007
HP SERVERS & OPTIONS PRODUCTS THAT DELIVER
Presentation transcript:

RTTC rack status Apr. 14 th 2005 Loïc Brarda, CERN

Loïc Brarda CERN, PH Farm Nodes DELL Poweredge SC1425 Dual Xeon Nocona 2.8 GHz Memory : 2 Gb 40 Gb SATA disk IPMI 1.5 Already received

Loïc Brarda CERN, PH Switches Control switch : 3COM 4250T –48 Ports 100 Mb –2 Ports Gigabit (Uplink) Data switch : 3COM 3870 –48 Gigabit ports –4 SFP slots Should be there end of next week

Loïc Brarda CERN, PH Nodes mounting Problem : –No standard sliding rails –Most 1U nodes are exactly 1U –No place to put angle bars Use 1U + 2mm for each node –There is now place to put angle bars –Tapped flat part (méplat taraudé) to support them  Solution probably found

Loïc Brarda CERN, PH Nodes mounting Flat part (méplat taraudé) made at cern Angle bars ordered from INEO –Should be delivered end of April

Loïc Brarda CERN, PH Farm Rack

Loïc Brarda CERN, PH Electricity Distribution box ordered –Should be delivered end of April Power distribution units (reglettes) –6 x 9 outlets IEC 320 / 16 A –Without circuit breakers –Already at CERN

Loïc Brarda CERN, PH Network Patch cables –Ordered –Should be delivered end of next week Mounted on cablofil as in the first rack prototype.

Loïc Brarda CERN, PH Cooling equipment Ordered Delivery delayed by one month due to bad fans Should be delivered by the end of April

Loïc Brarda CERN, PH Planning Lot of materials should arrive by the end of April The rack should be complete by mid may Except for the network switches, we can have temporary solutions if some parts are delayed.