Perspectives for ILC Si-Tracker mechanics work at Oxford aka It’s looking grim unless … PS: This is an individuals view 19/06/2014 2nd Oxford Strategy.

Slides:



Advertisements
Similar presentations
SPIDER Silicon Pixel Detector R&D  Birmingham University (N. Watson, J. Wilson, R. Staley), Bristol University (J. Goldstein, D. Cussans, R. Head, S.
Advertisements

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
THE DEVELOPMENT OF COMMON THERMO-MECHANICAL FACILITIES.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
ILC Project status Philip Burrows John Adams Institute Oxford University 1.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
UK ILC Tracker Meeting Oxford 15 April Liverpool activities HV-CMOS Sensor development in HV-CMOS, benefitting from 2 year PRD grant (Matthew Buckland,
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Structural and Environmental monitoring with FOS E. Currás, D. Moya,I. Vila, A.L. Virto, Instituto de Física de Cantabria (IFCA-Santander) J. G. Carrión,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Jan p 11 The aims of the meeting are to prepare ourselves for interacting with STFC as the situation unfolds. Specifically: Review and summarise.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
Technology and R&D Summary and next steps Burkhard Schmidt.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
For the CMS Pixel detector
Final CALICE OsC meeting: Status and summary of project
Detector building Notes of our discussion
CERN R&D plans and Infrastructures
WP microelectronics and interconnections
John Womersley Super-B Workshop Oxford May 2011
CLIC detector at SiD meeting 28/3/2010
Working for a detector project: A message from AIDA
Sub-Detector Assembly Area Summary of discussion at ALCW2015
The SuperB Silicon Vertex Tracker
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
LHCb VErtex LOcator ENGINEERING DEPARTMENT
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
SVT – SuperB Workshop – Frascati Sept. 2010
Tests of Endcap capillary & Heat exchangers at CERN
For the CMS Pixel detector
Presentation transcript:

Perspectives for ILC Si-Tracker mechanics work at Oxford aka It’s looking grim unless … PS: This is an individuals view 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 1

The three questions (in a nutshell) 1.What to do if ILC plan is announced on Jan ? a)What if they call the ILC CLIC instead b)Consider: vertex and tracker detector designs, fabrication and MDI. c)Consider national and international context. d)be explicit 2.How do FCC ee and pp options affect tracker work? a)consider simulations of detector and physics case. 3.Which LHC-LC synergies (FCC) would you like to develop 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 2

BACKGROUND 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 3

“Georg’s funding view” Future funding for HEP will be more constraint – No more “waves of money” on which single projects can swim into construction phase – No CERN sponsored RD-X wave to fund a decade of R&D – Flat cash from STFC throughout the next CG Minute amounts for ILC detector R&D in next CG 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 4

Long term strategy at Oxford? Long term (10 years) Plan = Large Tracking Detector Mechanics Group: – Same people form core team on LHC  LHC upgrade  ILC  CLIC  FCC  mu-C you name it: core expertise is shared in person not just on paper – Facilities in department expand to become more universal (don’t just serve one experiment) longer lived (outlive one experiment) supported by core team in the long term – “Large Tracker” because that ability sets us aside from others in UK and Europe and all future collider detector will have a large and a small tracker more people want to do vertex than large tracker – Note: large trackers can include “aggressive” versions of CMOS MAPS 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 5

Current EU developments AIDA2 (Oct yrs) contains proposal for “Thermo- mechanical test facility for Si tracker structures at Oxford” Merge the following into one facility – ATLAS tracker integration facilities (cold/dry room, cold box, cooling systems, grey room, ESPI, capacitive displacement sensors) – 32 channel absolute distance FSI system (AMULET) – Thermal Imaging system – Shaker table – New deformation measurement tool (Liverpool)? Refurbish the space as much as possible Get an EU funded post doc to run the facility Invite collaborators to use some time in it for their tracker development problems (which may also be our problems!) 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 6

Current UK developments LCUK detector branch is returning from funding shock induced coma One aspect of SOI to re-vive LC detector program contains a “Silicon Activity” Focus is on “We request funding for a programme leading to the design of a silicon pixel tracking detector in the forward and central regions. …. potential to provide increased performance with lower mass and lower cost than the current baseline tracking technologies.” 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 7

Current UK developments We will assess contending pixel technologies and simulate potential pixel architectures. We will address the engineering challenges posed by power and cooling requirements, develop models with realistic material distributions, and use them as input to physics performance studies. The level of support required per year is estimated to be – £15k for coordination of the silicon programme through national and international meetings and facilities, – £15k for mechanical and design support from RAL TD, – £8k for access to CEI expertise at the Open University, and – £10k for mechanical test structures, prototypes and testing equipment. – A total of XX staff years of effort will additionally be provided from institutes through existing funding. 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 8

Current UK developments RoleInstituteFTE/year Cost £k/year or alternate funding Electronic Engineering RAL TD OU EFI0.258 Mechanical EngineeringLiverpool0.2CG Detector PhysicistOxford0.2CG Simulation PDRAGlasgow0.2University Academic LeadershipVarious~0.2CG/PPD 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 9 I.e. no money in the short term but decent strategic match

ANSWERS 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 10

Three “Answers” 1.ILC tracker mechanics involvement only possible if started “parasitically” (Richard does not like the word synergy) a)In CG bid for the “tracker mechanics group” with three branches, ATLAS, LHC-B, ILC and admit that the ILC fraction consists largely of overlap with the other two 2.Stay out of FCC-ee option as it threatens the more interesting LC options a)now mention of FCC-pp option on next RG for tracker mechanics (too much diversity kills, we are under manned) 3.Synergies in mechanics best found in very advanced methods (integrated large micro channels, advanced CFRP designs, advanced geometries, integration of services, Assemblability) 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 11

BACKUP SLIDES 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 12

LHC similarities to ILC (SiD) tracker SiD tracker wants X0 per layer at 90 degrees – < 1% for silicon tracker (5 layers), σ r*φ = 12 (SCT=17 µm) – < 0.3% for vertex (5 layers), σ r*φ = 4-7 µm similarities between SiD tracker and SCT upgrade Current default cooling is air but nobody knows how to cope with vibrations from required turbulent flow 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 13

14 3.3m 2.5m 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold

From Similarities to Strategy Which R&D direction might give – the ultimate ILC silicon tracker i.e. thin, stiff, modular – possibly be useful for SCT upgrade (if finished in time) Need to be very aggressive on – geometry: high areal moment of inertia installation modules possibly spanning multi layers (think in 3D shapes) advanced geometries (the football) – materials: UHM CF with novel cores – cooling: bi-phase kapton micro-channels – sensors: 50 micron thin CMOS maps – services: multi layer Aluminium-Kapton tapes – full integration: co-cure cooling, services and structures 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 15

Next CG period (Oct 2015-Sep 2019) LHC-B upgrade in LS2 (done in 2018) SCT-upgrade in LS3 (expected 2021 or 2023) – in production mode by (2016 or 2018) – if its 2018 they may be able to cash in some new technology ILC time lines detector production phase start ? (details next slide) “Real” R&D towards ILC detector next CG should start inside next CG and ramp up 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 16

19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 17 Hitoshi Yamamoto, PASCOS 2013, November 22, 2013, Taipei

– need to become extremely “professional” about large construction projects to reduce project risks  design for installation; no more glue guns! – need to pass infra structure and expertise across “generations” to accumulate enough to do any project – make our LHC inherited capital equipment future proof 19/06/2014 2nd Oxford Strategy Meeting, Silicon Mechanics, Armin Reichold 18