PJM©2014www.pjm.com State of Demand Response Stu Bresler Vice President- Market Operations PJM Interconnection 10 th OPSI Annual Meeting October 13, 2014.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Demand Response Commissioner Suedeen Kelly June 3, 2008.
FLORIDA PUBLIC SERVICE COMMISSON WORKSHOP ON RENEWABLE PORTFOLIO STANDARDS JULY 26, 2007 BY E. LEON JACOBS, JR. WILLIAMS & JACOBS.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
PJM©2014www.pjm.com Winter 2014 Overview & Recent and Upcoming Market Rule Changes Adam Keech Director, Market Operations.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Resource Adequacy in PJM
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
PJM© PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 750+ millions of people served 60 peak load in megawatts.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets? An Overview of Various RTO Capacity Constructs and their Impact on Load.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
ASSOCIATION OF ENERGY ENGINEERS – SW OHIO PJM AND OHIO REGULATORY CHANGES HOWARD PETRICOFF VORYS, SATER, SEYMOUR & PEASE LLP 1.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
Nodal Pricing in an LMP Energy Market
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
BGS-CIEP Rate - Energy Components (Continued)
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
1 Demand Response in Midwest ISO Markets 09 February 2007.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
PJM©2013www.pjm.com Deployment of smart-grid technologies – Technology and market challenges Stu Bresler VP, Market Operations PJM Interconnection University.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Attachment to Testimony of Joseph Bowring Ohio Energy Mandates Study Committee April 16, 2015.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Demand Response: Next Steps OPSI Annual Meeting October 1, 2012 Howard J. Haas.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
What Was Learned From the 2015 Transition and Base Residual Auction Results? October 13, 2015 OPSI Annual Meeting CP Auction results – A DR perspective.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
OPSI Annual Meeting October 8 th Should all capacity resources be paid the same? -Demand Response operational deployment.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Asia-Pacific Energy Regulatory Forum
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Capacity Performance RPM Auction Results Overview
Allegheny Power Residential Demand Response Program
The Future of Demand Response in New England
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Resilience and Reliability in PJM’s Competitive Markets
Benefits of New England’s Proposed Capacity Market
Demand resource emergency energy measurement and verification
Community Action National Network National 340B Commission Testimony of Sue Veer MBA President and CEO for Carolina Health Centers, Inc. Tuesday, July.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

PJM©2014www.pjm.com State of Demand Response Stu Bresler Vice President- Market Operations PJM Interconnection 10 th OPSI Annual Meeting October 13, 2014

PJM©

PJM© A Potential Bridge to the Future Proposed path toward market clarity and confidence Fog of market uncertainty

PJM© TodayPJM Proposal Capacity market Supply resource (Similar to generation) Demand bid Capacity obligations Reduce load per rulesSame Who manages? Curtailment service provider/load serving entity Load-serving entity/retail service provider End-use customers All may participate subject to regulatory rules Same Energy market Economic or emergency resource; paid full LMP No direct compensation; benefits through cost-savings Ancillary service market Curtailment service provider or load-serving entity manages Same Demand Response: PJM’s Proposal vs Today

PJM© Integration of Demand Response Bids with RPM Demand Curve Shown based on existing PJM VRR Curve. PJM has proposed an alternative demand curve as part of its triennial review process.

PJM© Transition Mechanism Summary PJM would: Determine demand resource commitments which are load-serving-entity-based and can be directly converted to demand response curtailment commitments Work with curtailment service providers, states and load-serving entities to explore how demand resource commitments may transition to load-serving entity-based curtailment commitments Establish procedures to release demand resources that cannot be converted from capacity commitment –no capacity credit for released commitment –no curtailment obligation in delivery year Account for released demand resources in remaining incremental auctions for three transition delivery years –if necessary, purchase additional capacity to replace released demand resources –load-serving-entity-based demand response eligible to bid into incremental auctions Preserve terms of curtailment commitment in energy market for each type of demand resource (limited, extended summer and annual) during the transition.