CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto.

Slides:



Advertisements
Similar presentations
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Advertisements

 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
SESSION: DEICER MANAGEMENT SOLUTIONS Salt Management Research in Virginia Jimmy White, Virginia Center for Transportation Innovation & Research The Virginia.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
National Nuclear Regulatory Portal (NNRP) (Concept, Development and Experience) FNRBA Training Course on Knowledge Safety Networks, 14–18 October 2013,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Block 30 Prospecting & Production February Block 30 Overview On April 30, 2013, the Government of the Republic of the Sudan granted an exploration.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Progress Briefing - Energy Initiative
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
Information about the resort recreation area "Kenderli"
LCWS11 AWG9 PARALLEL SESSION SUMMARY
New Actions after the Hokuriku Declaration
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Environmental Impact Assessment (EIA) in New Brunswick
River Basin Management Flood protection
Presentation transcript:

CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 OVERVIEW Some Basic Premises and DefinitionsSome Basic Premises and Definitions Power Usage and DistributionPower Usage and Distribution Industrial Water and DistributionIndustrial Water and Distribution Potable Water and DistributionPotable Water and Distribution Sanitary Treatment Facilities and DistributionSanitary Treatment Facilities and Distribution Waste DisposalWaste Disposal Road InfrastructureRoad Infrastructure General Receiving Points and Access to the Project SiteGeneral Receiving Points and Access to the Project Site ConclusionsConclusions

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Some Basic Premises and Definitions There are Two Primary Documents that Contain Information Regarding the Infrastructure Support for the ILCThere are Two Primary Documents that Contain Information Regarding the Infrastructure Support for the ILC  ILC Technical Design Report o Produced by the ILC Collaboration  Siting Study for the International Linear Collider Project o Produced by KEK in Conjunction with the Nomura Research Institute Ltd., and Fukuyama Consultants Co., Ltd.

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 A Review of the Distinction Between the ILC Project and the ILC Laboratory is NeededA Review of the Distinction Between the ILC Project and the ILC Laboratory is Needed As a Starting Point:As a Starting Point:  The “ILC Project” Represents the Facilities, Equipment and Infrastructure Described in the ILC Technical Design Report and Cost Estimate  The “ILC Laboratory” Represents Everything else that is Needed to Support of the “ILC Project” for both the Near and Long Term  Currently No Comprehensive Cost Estimate (or Scope) Exists for the ILC Laboratory  In the Very Near Term, Work is Needed to Establish a Plan to Develop a (Phased ?) Scope and Cost for the ILC Laboratory Some Basic Premises and Definitions cont.

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Power Usage The TDR States the Primary Voltage is Assumed to be 275kV with 300 MW Capacity for 500 GeV Operation and an Additional 200 MW Capacity for 1 Tev OperationThe TDR States the Primary Voltage is Assumed to be 275kV with 300 MW Capacity for 500 GeV Operation and an Additional 200 MW Capacity for 1 Tev Operation The Siting Study for the ILC Project states that the Electrical Power Capacity is Taken to be ~10 MW for the ILC LaboratoryThe Siting Study for the ILC Project states that the Electrical Power Capacity is Taken to be ~10 MW for the ILC Laboratory It has been Verified with the Local Government that this Power Capacity is Available in the Kita-Kami RegionIt has been Verified with the Local Government that this Power Capacity is Available in the Kita-Kami Region A Substation Exists in the Kita-Kami Area, However the Source of the Power to the Substation Will Require Further Study and Negotiation with the Local Electric Power CompanyA Substation Exists in the Kita-Kami Area, However the Source of the Power to the Substation Will Require Further Study and Negotiation with the Local Electric Power Company Has an Interface Point been Established Between the Project and the Laboratory ?Has an Interface Point been Established Between the Project and the Laboratory ?  The Current Assumption is that the Cost for All Required Substation Upgrades, Electrical Distribution from the Substation To and Along the Project Area and Through the Laboratory will be Assumed by the ILC Project

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Industrial Water The Anticipated Groundwater Inflow Along the Length of the ILC Tunnel is Stated in the TDR at 1.0 t/min/kmThe Anticipated Groundwater Inflow Along the Length of the ILC Tunnel is Stated in the TDR at 1.0 t/min/km Seasonal Variation for Inflow Rates is ExpectedSeasonal Variation for Inflow Rates is Expected  A Detailed Examination for an Annual Inflow Model Needs to be Completed  The TDR Includes Small Storage Tanks for Pumping every 5 km  A Detailed Examination for Annual Operational Water Storage has not yet been Completed Industrial Water Use for the ILC Laboratory has not yet been ConsideredIndustrial Water Use for the ILC Laboratory has not yet been Considered  As Such, No Point of Interface has yet been Established Between the ILC Project and the ILC Laboratory

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Domestic Water Drilled Wells are Anticipated to Provide Domestic Water and Are Included in the TDR Project CostDrilled Wells are Anticipated to Provide Domestic Water and Are Included in the TDR Project Cost Drilled Wells are also Anticipated for the ILC LaboratoryDrilled Wells are also Anticipated for the ILC Laboratory  A Clear Understanding of the Capacity and Distribution Requirements for the ILC Laboratory Needs to be Determined  A Design Model for the Domestic Water System for the ILC Laboratory Needs to be Developed  The Current Assumption is that the Cost of this System will be Assumed by the ILC Project  As Such, No Point of Interface has yet been Established Between the ILC Project and the ILC Laboratory

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Sanitary Treatment Facility and Distribution Sanitary Treatment Facilities and Distribution are Included in the TDR Project CostSanitary Treatment Facilities and Distribution are Included in the TDR Project Cost Sanitary Treatment Facilities and Distribution are Also Required for the ILC LaboratorySanitary Treatment Facilities and Distribution are Also Required for the ILC Laboratory  A Clear Understanding of the Capacity and Distribution Requirements for the ILC Laboratory Needs to be Determined  A Design Model for a Sanitary Treatment System and Distribution for the ILC Laboratory Needs to be Developed  The Current Assumption is that the Cost of this System will be Assumed by the ILC Project  As Such, No Point of Interface has yet been Established Between the ILC Project and the ILC Laboratory

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Waste Disposal A Centralized Waste Collection and Disposal System is a Logical Approach to Waste ManagementA Centralized Waste Collection and Disposal System is a Logical Approach to Waste Management This System Should Service Both the ILC Project and the ILC LaboratoryThis System Should Service Both the ILC Project and the ILC Laboratory  A Clear Understanding of the Capacity and Distribution Requirements for this System Needs to be Determined  A Design Model for this System needs to be Developed  The Current Assumption is that the Cost of this System will be Assumed by the ILC Project  As Such, No Point of Interface has yet been Established Between the ILC Project and the ILC Laboratory

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Local Road Infrastructure Local Road Infrastructure is Included in the TDR, but Specific Site Requirements have not yet been DeterminedLocal Road Infrastructure is Included in the TDR, but Specific Site Requirements have not yet been Determined Existing Main Roads in the Kita-Kami Region Selected for the ILC Project and ILC Laboratory Area have Demonstrated the Capability to Transport Loads of ~100 TonsExisting Main Roads in the Kita-Kami Region Selected for the ILC Project and ILC Laboratory Area have Demonstrated the Capability to Transport Loads of ~100 Tons  A Clear Understanding of the Requirements for New Roads and Improvements of Existing Roads Needs to be Determined  A Site Specific Design for all Local Roadway Improvements Needed for Both the ILC Project and the ILC Laboratory Needs to be Developed  The Current Assumption is that the Cost of these New Roads and Existing Road Improvements will be Assumed by the ILC Project  As Such, No Point of Interface has yet been Established Between the ILC Project and the ILC Laboratory

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Equipment and Material Transporation A Review of the Capabilities of the Sea Port at Sendai and the Rail Access to the Kita-Kami Needs to Be Completed with Respect to the Anticipated Materials and Equipment Likely to be Received and Transported to the ILC Project SiteA Review of the Capabilities of the Sea Port at Sendai and the Rail Access to the Kita-Kami Needs to Be Completed with Respect to the Anticipated Materials and Equipment Likely to be Received and Transported to the ILC Project Site Needed Improvements to the Port Facilities and the Local Rail System Need to be Identified:Needed Improvements to the Port Facilities and the Local Rail System Need to be Identified:  A Clear Understanding of the Scope and Requirements for Required Improvements Needs to be Determined  A Specific Design for all Required Improvements Needs to be Developed  The Current Assumption is that the Cost for any Required Improvements will be Assumed by the ILC Project  As Such, No Point of Interface has yet been Established Between the ILC Project and the ILC Laboratory

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Conclusions The Preferred Japanese Site at Kita-Kami was Selected in 2013The Preferred Japanese Site at Kita-Kami was Selected in 2013 As Such, the Time Allowed for Site Specific Design for Both the ILC Project and Certainly the ILC Laboratory has been Limited and not Comparable with the Time Spent for the Development of the TDRAs Such, the Time Allowed for Site Specific Design for Both the ILC Project and Certainly the ILC Laboratory has been Limited and not Comparable with the Time Spent for the Development of the TDR A Review is Needed of the Existing Asian Region TDR Text and Cost Estimate to Identify the Extent of the Infrastructure that is Included in the Current Cost EstimateA Review is Needed of the Existing Asian Region TDR Text and Cost Estimate to Identify the Extent of the Infrastructure that is Included in the Current Cost Estimate The Development of a Near Term and Long Term Plan for the ILC Laboratory with a Comprehensive Cost Estimate, Considering the Scope Contained in the ILC TDR, is NeededThe Development of a Near Term and Long Term Plan for the ILC Laboratory with a Comprehensive Cost Estimate, Considering the Scope Contained in the ILC TDR, is Needed This will Provide the Opportunity to Establish Meaningful Interface Points Between the ILC Project and the ILC Laboratory and a True Profile of the Total Scope and Cost of the Complete ILC EffortThis will Provide the Opportunity to Establish Meaningful Interface Points Between the ILC Project and the ILC Laboratory and a True Profile of the Total Scope and Cost of the Complete ILC Effort