28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

12/02/2013 Gerrit Jan Focker, BE/BI/PM 1 WireGrid electronics in the Linac 4 tunnel.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
FOTO 24/11/2011 PS FWS RELIABILITY 1 IMPROVING THE PS FWS RELIABILITY.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
22/11/2013 Gerrit Jan Focker, BE/BI/PM 1 BI review on Radiation development and testing. Analogue Electronics for: - L4 Grids, - L4 Scanners, - PS Complex.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
TOOL MANAGEMENT INTRODUCTION
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Schedule meeting May May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Status and Improvements of TDCB project TDAQ working group meeting Andrea Burato (INFN Pisa) On behalf of TDCB working group.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
What’s NEWONE ? Areas of Business Product Lines Share the Vision.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Expected hardware status and Priority of the commissioning task
Brief Status SPS Prototype PSB Prototype Installed in LS1
Wire Scanner / A.Demougeot
ELENA installation and commissioning status
LIU Wire Scanner Milestones June 2017
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
LIU Wire Scanner Series Costs
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Presentation transcript:

28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.

28/01/2013 Gerrit Jan Focker, BE/BI/PM 2 Front-end Faraday cups u GPS.FC20 stuck? u New (spare) units are being assembled.

28/01/2013 Gerrit Jan Focker, BE/BI/PM 3 Magnet Room cups u GPS.FC495, HRS.FC300 and HRS.FC490 same basic design, with only one part different. u Normally only ONE spare, u This caused problems in u A complete spare unit cannot be made due to the (small) differences of the three cups. u Parts have been ordered and will be manufactured to allow to put together a spare unit within one hour.

28/01/2013 Gerrit Jan Focker, BE/BI/PM 4 Controls of Front-End and Magnet Room cups u PAM’s in the Magnet rooms appeared to be very sensitive to single-event upset. u PAM’s moved to the Hall, using “long” cables: degradation of performance. u We will try to split these PAM’s in two parts, keep the control part where it is now and move the Amplifier part to the old position.

28/01/2013 Gerrit Jan Focker, BE/BI/PM 5 Other 25mm cups u Used at Isolde (scanner-units) and at REX. u The cups themselves are always in stock. u Scanner / FC units: u We have a few spares that need to be repaired, u A lists is being prepared of the parts needed to make a few new units and to fill up the stock of spare parts. u No spare pistons for REX, spares will be ordered.

28/01/2013 Gerrit Jan Focker, BE/BI/PM 6 REX special devices REX special devices u REX-Trap collector-plates: u Totally non-standard, no drawings, no end- switches, no visual movement control possible. u One of the two is stuck: u Replace with the other, u Use the broken unit to make a drawing based on “standard” parts and make new units. u EBS.BO10: u NOT standard, maintenance difficult. u ? Drawing ?

28/01/2013 Gerrit Jan Focker, BE/BI/PM 7 Scanner electronics u The scanner-electronics are old, u Due to the installation of more and more scanners there are no more spares (except for the industrial motor-drivers). u The FPGA is obsolete, it’s programming software too, u The limitation of the four control channels complicates the software (and possibly limits the machine operation). u A new solution has been designed and prototype boards are ready (the FPGA needs to be programmed), but development is halted due to other priorities.

28/01/2013 Gerrit Jan Focker, BE/BI/PM 8 Grids u Mechanics: u No spares, u Different connectors everywhere… u Electronics: u Not the most reliable system, (degradation due to radiation?) u Make more spares of actual system? u Make new system based on new PS- complex SEM-grid design?

28/01/2013 Gerrit Jan Focker, BE/BI/PM 9 Conclusions u The BI-ML section is aware of the problems of insufficient spares. Staff changes and lack of manpower don’t help. u Some spares are on the way, others are being prepared. u They will study what is missing and have promised to come up with a proposal what to do about the grid-system later this year. u Tape-station? u FNBS or Alison Scanner(s)?