CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

Bundelkhand Special Package Animal husbandry Department Madhya Pradesh 1.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
SERVICE TAX 1. As per Explanation to Section 65 (105) (zzzza) of the Finance Act, 1994, the term works contract” means a contract wherein,— (i) transfer.
Crop as Damaged by Pond previously Crop as Damaged by Pond previously.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
WATER RESOURCES DEMAND MANAGEMENT FOR IRRIGATION AT THE NATIONAL LEVEL MYANMAR.
Pranahita – Chevella Project PHASE - II
Welcome Chhattisgarh 1.
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
2006 Technical Affairs Water Projects Department.
NATIONAL ENERGY CONSERVATION AWARD PRESENTED BY : A.GANESAN EXECUTIVE ENGINEER (E) BSNL ELECTRICAL DIVISION MADURAI.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Water System Planning Study
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – Delhi
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
Hydro Electric Power Plant
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Budget allocation and release of funds to implementing agencies under ADIP Scheme S.NoFinancial Year Budget Estimate (Rs. In crores) Amount Released (Rs.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
S.NoItem I st Quarter II nd Quarter III rd Quarter IV th Quarter Total Unspent Balance as on (Expected) Actual Requirement (7-8) 1 Batch.
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
RSRDC UNIT- III JAIPUR. ORGANISATION CHART RE Sh. A.M. Khan ARE Sh. Rajesh Gupta ARE Sh. S.K. Chejara ARE Sh. V.B. Mathur ARE Sh. Rakeev Gupta JEN Smt.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
1 Regional Training Institute, Ranchi Structured Training Courseware on State Receipt Audit Audit of Water Rate Receipts.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
Development Block Paonta Sahib Implementation of IWMP- SIRMOUR-II(EPA)
ORGANISATION CHART OF RSRDC UNIT-GURGAON RE SH. SUKESH MATHUR ARE SH. UMESH KUMAR GARG ARE SH. J.M. MITTAL ARE SH. R.D. MEENA ACCOUNTANT SH. SANT LAL.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
Company is giving a fix income on every lead which is complete by you or by your Executive, I.E. Rs. 900/- E.G. if a single field executive.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
BS3: FINANCING OF IRRIGATION PROJECTS 6 th April, 2016 INDIA WATER WEEK by R. K. Agrawal Senior General Manager.
Erdeneburen HPP Project Implementation Unit
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Proposals for State: ……..
Mid Day Meal Scheme MDM-PAB Meeting – GUJARAT On
Dept. of School Education Annual Work Plan & Budget
Hyderabad city water supply system
PRESENTATION ON KALESHWARAM PROJECT
PPL1.6 Pumping Plant Project Overview
Presentation transcript:

CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda (V), Belagal (V) Proposed ayacut : 13,661 Acres Utilisation: TMC Discharge: Cumecs GURU RAGHAVENDRA LIFT IRRIGATION SCHEME

CATEGORY-II : Package No PROJECT PROFILE: Execution of 3 Nos. of LI Scheme along Tungabhadra River Near Mantralayam. (i) Duddi LIS near Duddi (V), (ii) Madhavaram LIS near Madavar Tank, (iii) Babla Duddi LIS near balagal (V) 2.Administrative sanction: G. O. Ms. No. 53, Dt: for Rs Crs. 3.No. of Packages (EPC): 1 4.Old Packages: 5 Nos. 5.Agreement value of EPC package: Rs Crs. 6.Budget Provision: Rs Crs. 7.Expenditure : Rs Crs : Rs Crs. cum. Exp.: Rs Crs. 7.Utilization: TMC 8.Ayacut: 13,700 Acres 9.Land Acquisition Required: 1761 acres Acquired: 160 acres

9Lift-I (Duddi LIS) Lift Height:72 m No. of Pumps:3 No. Total pumps capacity:800 HP 10 Lift-II (Madhavaram) : Lift Height:63.50 m ( ) No. of Pumps:6 No.(3+3) Total pumps capacity:950 HP 11 Lift- III (Basaladoddi) Lift Height:99 m No. of Pumps:6 No. Total pumps capacity:1900 HP 12Power required:2.72 MW 13 Mob. Adv. Paid Recovered : Rs Crs Rs Crs : Rs Crs. Rs Crs TOTAL: Rs Crs Rs Crs 14 Target Date:7/2007 GURU RAGHAVENDRA LIFT IRRIGATION SCHEME

Package No.97 / Cat - II i.3 no. of L.I.Schemes for supply of water to 13,700 Acres by lifting all along Tungabhadra river. GURU RAGHAVENDRA PROJECT Name of the Contractor: I.H.P. Co. Ltd., Mumbai Agreement Amount : Rs Crs. Agreement Date: Period of Completion: 24 Months  Investigation: Completed  Execution: Started in 2/2006  EXPENDITURE : Rs Crs. (inc. Mob.Adv. Rs.3Crs.) against Rs Crs.  Land Acquisition : Required : 1761 Acs; Acquired : 160 Acs, Requisitioned:1601Acs  Expenditure (1 EPC + 5 Old Works)  : Rs Crores  : Rs Crores