Estimated total mass of new Beam Pipe and IBL package Y. Gusakov 3/2/2010.

Slides:



Advertisements
Similar presentations
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
Advertisements

Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Module and stave interconnect Rev. sept. 29/08.
SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Cooling of power semiconductor devices
Susanne Kersten, Wuppertal University November 21/22, 2013.
Heat load study of cryomodule in STF
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Module and stave interconnect Rev. sept. 29/08.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
Light weight readout cable simulations for inner barrel pixel readout
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
Dry type transformers Zaragoza Aluminum vs. Copper
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
August 7, 2003K. Chow, LHC Luminosity Detector Thermal Analysis1 Analysis cases Approach: Start simple to get information— with speed with confidence that.
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
ATLAS Inner Detector thermal study. The Inner Detector.
FEM/CFD thermo-mechanical analyses on IBL Mock-up A. Sciuccati.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STT gas system a possible implementation
Feedback on transfer line sizing and flow calculations for UT
Stress and cool-down analysis of the cryomodule
Preliminary thoughts on SVT services
Update of MVD services and requests
Beam
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
CMS phase 2 pixel detector and its electronics
Cooling pipes and Space for Services
? ENDCAP: Mechanics IFIC-Valencia.
Integration issues at IHEP
SIT AND FTD DESIGN FOR ILD
EVLA MONITOR & CONTROL CDR
Assumption: in a water / HC mixture, mass fraction is the same as volume fraction. Example 1: 99 kg HC (density 700 kg/m3) and 1 kg H2O (density 1000 kg/m3).
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Grounding / EMC B2GM grounding / EMC B2GM20 M. Andrew.
Twinax A Twinax is a dual coaxial cable with a common shield (“Extension” of TWP). 3 custom prototypes were produced for R&D purposes. Currently Cu wire.
Presentation transcript:

Estimated total mass of new Beam Pipe and IBL package Y. Gusakov 3/2/2010

Material Service nature Service function type Function descriptionCharacteristics NEWODIDAreaDensityLength Weight side A Weight side C Side A EoS NUMBER at side A CABLES parallel bundleELLPixel module LV supply [2x (4xAWG21)+ 1 xAWG20 + 1xAWG30] 456 ALU copper clad 15%Cu+85%Al LV power supply4xAWG 21 (eq AWG 17 Cu) ALU copper clad LV power return4xAWG 21 (eq AWG 17 Cu) ALU copper clad LV Sensing thickAWG ALU copper clad LV Sensing thinAWG Twisted PairEHH Pixel module HV supply (VDET) (2xAWG36) 7112 Cu HV power supplyAWG Cu HV power returnAWG Twisted PairEDcs (2xAWG36) 8112 Cu Pixel module temperature monitoring DCS-IN AWG Cu Pixel module temperature monitoring DCS-Return AWG Twisted PairEDcsEnv (2xAWG36) 8112 Cu Pixel temperature monitoring ENV : AWG Cu Pixel temperature monitoring ENV Return: AWG Twisted PairESignal Signal OUT (2xAWG28) twisted Cu FE Chip signal OUTAWG Cu FE Chip Signal OUT-ReturnAWG Twisted PairESignalClock (2xAWG36) twisted Cu FE Chip CLOCKAWG Cu FE Chip CLOCK-ReturnAWG T Outlet evaporative cooling system Ti pipe 07 SS Services Cooling SS Stave cooling TEv, P Inlet Evaporative CoolingTi Pipe 17 SS Services Cooling SS Stave cooling stave staves %13.996

Number of unitsParts of Sub-assembly Number of units for parts of sub-assemblyMaterial Volume (m^3) Density (kg/(m^3)) Mass of one unit (kg) Mass of all the units used (kg) Mass of 1 sub-assembly (kg) Mass of all sub- assemblies (kg) 0 1Be Section1Beryllium Adaption for Section2 Al: 93.7%; Cu: 6.3%6.384E-06 Al: 2700; Cu: Flange2AA T Foil Heater6Kapton none1Polyimide7.994E none1 Aerogel (pyrogel) none1Al E Split Spacer ESTIMATED TOTAL MASS:4.87

1 stave assembly – 0.079kg 14 staves – 1.106kg 1 support ring– 0.015kg 10 support rings– 0.150kg 2 sealing rings– 0.040kg 2 services supports – 0.600kg 2 BP connectors– 0.200kg IBL services– kg Beam Pipe– 4.870kg Total weight– kg