ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
Questionnaire Response
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
EE: Servicetype#cablesL avg L tot Costs est [ksfr] LV50mm 2, (1) (US?) EE fibres yellow ribbons US HV (SCEM ) 25 (13+12)
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Rutherford Appleton Laboratory CMS ECAL Split 08/09/04 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
Status of the Beetle Readout for the MaPMTs  history of events  documentation of setup  prospects of near future RICH meeting, CERN, Stephan.
B W Kennedy, CCLRC Rutherford Appleton Laboratory Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcaps K.W.Bell, R.M.Brown, D.J.A.Cockerill,
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
ECAL Off detector Electronics Workshop Lisbon April T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May)
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
SLHC Working Group - Nadia Pastrone1 CMS ECAL Detector at SLHC SLHC high radiation environment  consequences on ECAL Bunch crossing period:
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
University of Wisconsin
T1 Electronic status Conclusions Electronics Cards:
CMS-ECAL Front-End monitoring Matteo Marone
Quick link: cern.ch/cmstb04
ECAL electronics schedule
4x5 SC array for the test beam in Apr 2007
UK CMS Oversight Committee Mtg
Type 2 Supercrystal Type 1 Supercrystal
PROGRESS on EE VPTs, Dees D Cockerill
Presentation transcript:

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration  SC assembly  Dee4  H4 and H2  Planning  Conclusions

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 2 VPTs VPT contract completed ETH-Z, RAL, Brunel, Bristol, IHEP, INR, PNPI, UVa, Split, RIE VPTs delivered CMS Gold award to RIE yesterday tested at RAL at 1.8T 1820 tested at Brunel at 4.0T ~10700 VPTs now at CERN ~5000 reception tested under HV

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 3 EE Electronics Supercrystal to Motherboards HT filter card mass production launched with Elfab in Dec cards received yesterday. 500 cards/m cards by end Sep. SC umbilical cable mass production launched at CERN last week (Cegelec) 24 prototype EE motherboards produced. 2 fully tested, rest being appraised EE Motherboard mass production started at Ascom Internal SC mounting All umbilical, fibre optic and HT card supports either produced or nearing end of production All porte-ferrules for the laser fibres produced

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 4 EE VFE cards to fibre optic readout VFE card production completed last year LVR cards completed and delivered All VFE and LVR housings delivered to CERN Order placed for Gap Pad Start VFE card calibration in Lyon as soon as possible All 800 EE FE cards produced and tested at LLR – being sent to 867 All GOH and ribbon fan-outs tested and ready at CERN EE TRLBs – final components need to be mounted EE Electronics

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 5 HV card test stands SC HV card tests Bristol and ETH-Zurich 2 HV test stands All cards to be tested with high voltage 21 cards at a time Measure anode, dynode leakage currents 2 LV test stands All R and C components measured C at a least 3 frequencies Test stands operated through Labview HV card Students Yannick Riesen and Juerg Eugster (ETH-Z) with the HT card test stand

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 6 Mechatronics & Monitoring Mechatronics All EE cooling bars prepared. All local manifolds for the cooling blocks due in March 6 (of 10) cooling blocks ready for Dee4 Support plates delivered for Dee4 First dry assembly tests for Dee4 carried out Polyethylene moderator Moderator for all 4 Dees to be delivered in March Monitoring 3 level 1 fanouts prepared for Dee4 Adapted to take VPT stability pulser fibres Mounting on Dee4 possibly next week ‘Double MEM’ for Dee4 at H4? John Hill (RAL) examining the first dry assembly test for Dee4 integration

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 7 EE Mechanics OPAL frames and Dee rotation equipment SC have given permission for the use of all OPAL frames and lifting beams, after load tests Permission based on results from impressive FEA study carried out by Alexander Riabov (IHEP, Protvino) Rotation test and load tests on Dee1 OPAL frame in March Delivery of lifting device in March

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 8 EE Mechanics Loading device for Environmental Screen Completed by New Ingenia SA Delivery to CERN this week Device attached to OPAL frame ~1m stroke wrt backplate Allows screen to be safely loaded over the SCs for Dee horizontal or vertical

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 9 SC assembly SC status Dee4 425 EE crystals glued to VPTs 17 SCs assembled out of HV tested Dee1 30 EE crystals glued to VPTs 3 partial (2x5) SCs assembled Crystals awaiting use Deliveries in Dec 2006/Jan BTCP 125 SIC

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 10 Dee4 SC assembly Assembly progress at

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 11 SC test stands SC tests and umbilical trigger mapping Have successfully run the UVa pulser system and ECAL DAQ with a preshower CREPE board Complete system controlled from a single PC Would like 1-2 further CREPE boards for additional test stands Matt Ryan (Imperial) reading out a Supercrystal for Dee4 with the preshower CREPE board Crepe board

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 12 Dee4 SCs assembled for testbeam Each SC assembled with VPTs from within a specific yield range SCs assembled for Dee4

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 13 H4 and H2 H4 Dee4 to H4 in May Detailed design of mount on H4 turntable nearly complete  20 SCs = 500 crystals  UVa offer for testbeam coordinator: Alexander Ledovskoy  DAQ/DQM Matt Ryan, Alexander Ledovskoy, Yvgeni Vlassov  CCS code and control room monitoring need to cope with - EE trigger mapping into the motherboards - Readout 5 EE Trigger GOH/FE later in the year - Token ring layout specific to Dee4 H2 permanent facility 4 SCs in front of HE Use old E0prime mechanics 2 existing SCs at RAL and UVa Assemble 2 further SCs Project led by HCAL community They will design/make all infrastructure interfaces at H2

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 14 Dee4 and E0prime planning All Dee4 and E0prime preparation in Crystal Palace

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 15 Dee1 by Autumn 2007 Changeover to EE crystal gluing in Bldg 27 Modify multiboxes from EB type to EE type End of EB activities in 867 Start of EE integration in 867 Bldg 27 available for EE assembly Parallel work mandatory: SC loading HV and LV cabling Umbilical trigger mapping Cooling bar mounting VFE/LVR/TRLB mounting

ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 16 EE - Conclusions ECAL Endcap mass production underway Good progress on Dee4 Testbeam programme in 2007 will extend the calibration and detailed response studies on the CMS ECAL out to  = 2.5 Dee1 for CMS by Autumn 2007 – parallel activities essential