ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill VPTs Electronics and Integration SC assembly Dee4 H4 and H2 Planning Conclusions
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 2 VPTs VPT contract completed ETH-Z, RAL, Brunel, Bristol, IHEP, INR, PNPI, UVa, Split, RIE VPTs delivered CMS Gold award to RIE yesterday tested at RAL at 1.8T 1820 tested at Brunel at 4.0T ~10700 VPTs now at CERN ~5000 reception tested under HV
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 3 EE Electronics Supercrystal to Motherboards HT filter card mass production launched with Elfab in Dec cards received yesterday. 500 cards/m cards by end Sep. SC umbilical cable mass production launched at CERN last week (Cegelec) 24 prototype EE motherboards produced. 2 fully tested, rest being appraised EE Motherboard mass production started at Ascom Internal SC mounting All umbilical, fibre optic and HT card supports either produced or nearing end of production All porte-ferrules for the laser fibres produced
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 4 EE VFE cards to fibre optic readout VFE card production completed last year LVR cards completed and delivered All VFE and LVR housings delivered to CERN Order placed for Gap Pad Start VFE card calibration in Lyon as soon as possible All 800 EE FE cards produced and tested at LLR – being sent to 867 All GOH and ribbon fan-outs tested and ready at CERN EE TRLBs – final components need to be mounted EE Electronics
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 5 HV card test stands SC HV card tests Bristol and ETH-Zurich 2 HV test stands All cards to be tested with high voltage 21 cards at a time Measure anode, dynode leakage currents 2 LV test stands All R and C components measured C at a least 3 frequencies Test stands operated through Labview HV card Students Yannick Riesen and Juerg Eugster (ETH-Z) with the HT card test stand
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 6 Mechatronics & Monitoring Mechatronics All EE cooling bars prepared. All local manifolds for the cooling blocks due in March 6 (of 10) cooling blocks ready for Dee4 Support plates delivered for Dee4 First dry assembly tests for Dee4 carried out Polyethylene moderator Moderator for all 4 Dees to be delivered in March Monitoring 3 level 1 fanouts prepared for Dee4 Adapted to take VPT stability pulser fibres Mounting on Dee4 possibly next week ‘Double MEM’ for Dee4 at H4? John Hill (RAL) examining the first dry assembly test for Dee4 integration
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 7 EE Mechanics OPAL frames and Dee rotation equipment SC have given permission for the use of all OPAL frames and lifting beams, after load tests Permission based on results from impressive FEA study carried out by Alexander Riabov (IHEP, Protvino) Rotation test and load tests on Dee1 OPAL frame in March Delivery of lifting device in March
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 8 EE Mechanics Loading device for Environmental Screen Completed by New Ingenia SA Delivery to CERN this week Device attached to OPAL frame ~1m stroke wrt backplate Allows screen to be safely loaded over the SCs for Dee horizontal or vertical
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 9 SC assembly SC status Dee4 425 EE crystals glued to VPTs 17 SCs assembled out of HV tested Dee1 30 EE crystals glued to VPTs 3 partial (2x5) SCs assembled Crystals awaiting use Deliveries in Dec 2006/Jan BTCP 125 SIC
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 10 Dee4 SC assembly Assembly progress at
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 11 SC test stands SC tests and umbilical trigger mapping Have successfully run the UVa pulser system and ECAL DAQ with a preshower CREPE board Complete system controlled from a single PC Would like 1-2 further CREPE boards for additional test stands Matt Ryan (Imperial) reading out a Supercrystal for Dee4 with the preshower CREPE board Crepe board
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 12 Dee4 SCs assembled for testbeam Each SC assembled with VPTs from within a specific yield range SCs assembled for Dee4
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 13 H4 and H2 H4 Dee4 to H4 in May Detailed design of mount on H4 turntable nearly complete 20 SCs = 500 crystals UVa offer for testbeam coordinator: Alexander Ledovskoy DAQ/DQM Matt Ryan, Alexander Ledovskoy, Yvgeni Vlassov CCS code and control room monitoring need to cope with - EE trigger mapping into the motherboards - Readout 5 EE Trigger GOH/FE later in the year - Token ring layout specific to Dee4 H2 permanent facility 4 SCs in front of HE Use old E0prime mechanics 2 existing SCs at RAL and UVa Assemble 2 further SCs Project led by HCAL community They will design/make all infrastructure interfaces at H2
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 14 Dee4 and E0prime planning All Dee4 and E0prime preparation in Crystal Palace
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 15 Dee1 by Autumn 2007 Changeover to EE crystal gluing in Bldg 27 Modify multiboxes from EB type to EE type End of EB activities in 867 Start of EE integration in 867 Bldg 27 available for EE assembly Parallel work mandatory: SC loading HV and LV cabling Umbilical trigger mapping Cooling bar mounting VFE/LVR/TRLB mounting
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 16 EE - Conclusions ECAL Endcap mass production underway Good progress on Dee4 Testbeam programme in 2007 will extend the calibration and detailed response studies on the CMS ECAL out to = 2.5 Dee1 for CMS by Autumn 2007 – parallel activities essential