1 Trip to BNL Goal Installation of newest MAD-X at BNL Setting up space charge for RHIC in frozen mode They do not really want a renormalization of sigma.

Slides:



Advertisements
Similar presentations
TUPEC057 Advances With Merlin – A Beam Tracking Code J. Molson, R.J. Barlow, H.L. Owen, A. Toader MERLIN is a.
Advertisements

1 PIC versus Frozen? 5/27/2013 FSOutcome of SC-13 PIC codes are definitely needed when coherent effects are relevant. In our case in presence of strong.
Memory Management 2010.
Operational Java for Technical Committee.
Introduction Status of SC simulations at CERN
Donald Stark National Center for Atmospheric Research (NCAR) The Developmental Testbed Center (DTC) Wednesday 29 June, 2011 GSI Fundamentals (1): Setup.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
DELOVODNIK PRO A short presentation. Standard mail record keeping Most companies these days receive and send a lot of paper mail. Too many of them keep.
Surveying patrons with the Impact Survey A fast, easy way to gather feedback from the community about public technology needs Samantha Becker, MLIS, MPA.
Business Unit or Product Name © 2007 IBM Corporation Introduction of Autotest Qing Lin.
The Pipeline Processing Framework LSST Applications Meeting IPAC Feb. 19, 2008 Raymond Plante National Center for Supercomputing Applications.
PTC ½ day – Experience in PS2 and SPS H. Bartosik, Y. Papaphilippou.
BE-IT Needs  ICE lxbatch Group  List of BE-IT Needs.
CS 350, slide set 5 M. Overstreet Old Dominion University Spring 2005.
ASP.NET The Clock Project. The ASP.NET Clock Project The ASP.NET Clock Project is the topic of Chapter 23. By completing the clock project, you will learn.
A Short Course on Geant4 Simulation Toolkit How to learn more?
Introduction Advantages/ disadvantages Code examples Speed Summary Running on the AOD Analysis Platforms 1/11/2007 Andrew Mehta.
Details of space charge calculations for J-PARC rings.
Status of Space-Charge Simulations with MADX Valery KAPIN ITEP & MEPhI, Moscow GSI, 19-Feb-2009
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Sample Video Game & Sound. The Plan 1.Game Theme 2.Game Structure 3.Sprites 4.Trackers 5.Collisions 6.Score 7.Levels 8.Splash Screens 9.Design 10.Implementation.
Experiences parallelising the mixed C-Fortran Sussix BPM post-processor H. Renshall, BE Dept associate, Jan 2012 Using appendix material from CERN-ATS-Note
Experiment in PS G. Franchetti, GSI CERN, 20-21/5/ /05/14G. Franchetti1.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Debugging parallel programs. Breakpoint debugging Probably the most widely familiar method of debugging programs is breakpoint debugging. In this method,
Wordpress with Mina Automated Deployment Solution Jonathan Gravato DIG 4104c.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
LINCPlus Overview Complete binding preparation module includes features such as security, titles database, reports and job costing options. Integrated.
MultiJob pilot on Titan. ATLAS workloads on Titan Danila Oleynik (UTA), Sergey Panitkin (BNL) US ATLAS HPC. Technical meeting 18 September 2015.
‘Computer power’ budget for the CERN Space Charge Group Alexander Molodozhentsev for the CERN-ICE ‘space-charge’ group meeting March 16, 2012 LIU project.
The High Performance Simulation Project Status and short term plans 17 th April 2013 Federico Carminati.
Voyage meets MeLCat: MC’ing the Introductions. MeLCat extract sequences Voyager bibout.pl bib extract patout.pl today’s extract yesterday’s extract patdiff.pl.
Frank SchmidtSpace Charge # 31 Style of the Meeting I have agreed with Elias that we want meetings without fear to ask any crazy question! Fancy presentations.
Discussion Global Analysis of Polarized RHIC and DIS data: How do we get there? Global Analysis Workshop at BNL, Oct. 8, 2007.
Issues on the operational cluster 1 Up to 4.4x times variation of the execution time on 169 cores Using -O2 optimization flag Using IBM MPI without efficient.
Simplified Modeling of Space Charge Losses in Booster at Injection Alexander Valishev June 17, 2015.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
PTC-ORBIT code for CERN machines (PSB, PS, SPS) Alexander Molodozhentsev (KEK) Etienne Forest (KEK) Group meeting, CERN June 1, 2011 current status …
MAD-X V3 with Space Charge via Macros (2010) Benchmarking (GSI) with other Codes Implementing Space Charge directly into MADX-SC V5 (2012)  latest version.
PROOF tests at BNL Sergey Panitkin, Robert Petkus, Ofer Rind BNL May 28, 2008 Ann Arbor, MI.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
How to configure, build and install Trilinos November 2, :30-9:30 a.m. Jim Willenbring.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SC-30 FS1 Communication from SYNERGIA about GSI benchmarking 14/11/2013.
Debugging Lab Antonio Gómez-Iglesias Texas Advanced Computing Center.
Geant4 Training 2003 A Short Course on Geant4 Simulation Toolkit How to learn more? The full set of lecture notes of this Geant4.
2-December Offline Report Matthias Schröder Topics: Monte Carlo Production New Linux Version Tape Handling Desktop Computers.
BNL trip  Goal of the BNL-FERMILAB- CERN collaboration  The codes  BB tune foot-prints  DA studies.
SC-25 FS1 Code Overview PTC-Orbit Synergia Micromap MAD-X with Frozen Space Charge 8/29/2013.
Good Morning  Please be sure to take care of your belongings.
Good Morning  Please be sure to take care of your belongings.
Memory Management Virtual Memory.
Good Morning  Please be sure to take care of your belongings.
Multi-Turn Extraction studies and PTC
A Short Course on Geant4 Simulation Toolkit How to learn more?
Status and needs of dynamic aperture calculations
Space Charge Study Group
Makefile Tutorial CIS5027 Prof: Dr. Shu-Ching Chen
SC Overview 2013 White & Rouge The Codes in Comparison The Noise Issue
Compilers, Make and SubVersion
Update on PTC/ORBIT space charge studies in the PSB
Near Future Plans for the Space Charge Team after SC-13
Order Processing and Requisition Accelerator
Preliminary results of the PTC/ORBIT convergence studies in the PSB
A Short Course on Geant4 Simulation Toolkit How to learn more?
A Short Course on Geant4 Simulation Toolkit How to learn more?
Turn-By-Turn Emittance Tracking in CesrTA with Space Charge
Contribution template slides
Kaspersky Social Channel
Presentation transcript:

1 Trip to BNL Goal Installation of newest MAD-X at BNL Setting up space charge for RHIC in frozen mode They do not really want a renormalization of sigma values per turn Adding multipoles Adding “real” BB kicks MPI Space Charge Meeting 23 - FS

2 Installation of newest MAD-X at BNL Setting up of my access to BNL system took 2 days! Despite full advance preparation due to new security measures. The installation of MAD-X went fine when using IFORT I have to announce that the present GNU compiler on lxplus “gfortran” is defect! We could identify that the problem is due to optimization so a real problem! Newer versions are again okay. This is a late justification of using commercial compilers like IFORT! Global SVN access to MAD-X works nicely: svn co mymadX The newest MAD-X works fine so the effort by Laurent and myself have been successful! Space Charge Meeting 23 - FS

3 Setting-up for RHIC MAD-X Code fixes and new features: Needed another flag to suppress the recalculation of the emittances A misleading naming of variable has been fixed TRRUN unnecessarily printed tracking data before and after each turn – fixed Maximum Sliming of Lattice via MAD-X “SEQEDIT” command ➔ next page MACROS create about 45 SC kicks per Betatron period maybe a bit excessive ➔ further reduce for PS Various scripts written for data handling Space Charge Meeting 23 - FS

Flat and Minimal Lattice ! all set-up ready for clean-up use, period=MACHINE; ! step 1: super flat real sequence even when started with lines ! "SAVE" and "CALL" needed save,sequence=MACHINE,file=blah; call,file=blah; ! Now seqedit seqedit, sequence=MACHINE; ! All classes that can go select, flag=seqedit, class=marker ; select, flag=seqedit, class=monitor ; select, flag=seqedit, class=instrument ; select, flag=seqedit, class=solenoid ; select, flag=seqedit, class=kicker ; select, flag=seqedit, class=multipole,pattern="^eld$" ; remove, element=selected; endedit; ! now use the super clean lattice use, period=MACHINE; oPAC Topical - F. Schmidt

5 Results Multipoles inclusion trivial Extra BB kicks not really foreseen in the SC MACROS but operational Tuneshift from SC and BB as theoretically and experimentally expected The sussix code successfully installed including data scripts Detuning with amplitude successfully determined for RHIC FMA analysis started 50’000 turns per day for 1’000 particles (sufficient for frozen space charge!) Speed-up via MPI ➔ next slide As a consequence Valery and myself will modify the MACROs Space Charge Meeting 23 - FS

6 MPI They have very competent staff to handle MPI! Timing analyse of code functioning and an easy gain of a factor of 4-5 is possible. In the RHIC case where a renormalization of the sigma values is not needed this should be about a factor of 10. Several MPI strategies have been discussed It was agreed to modify the code as little as possible but organize it by running a separate set of data on each node and bringing the data together for the emittance renormalization. The issue of lost particles and IO have been addressed A handy script will be provided for easy usage ➔ Basically they will do the job for us!!! Space Charge Meeting 23 - FS

7 Round Table The crash issue must be resolved asap! This will need till after the summer Nevertheless tracking can proceed since data seem alright till the possible crash Please start using the MPICH2 version which needs a small set-up effort all explained in recent Do we need more resources in terms of the 48 core machines? MAD-X with frozen space charge will be fully applied to the PS in view of the experiments of June 2012 ➔ Short demonstration any time! The nonlinear coupled resonances will be studied together with Giuliano ➔ trip next 2 weeks The benchmark effort and the mitigation effort in full swing ➔ some update during Fermilab visit PTC-ORBIT Manual framework has been set-up ➔ start filling! Space Charge Meeting 23 - FS