MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
W trigger upgrade simulation Kazuya Aoki Kyoto Univ. Muon Physics and Forward Upgrades Workshop Santa Fe, June 2004.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
Development of the Readout ASIC for Muon Chambers E. Atkin, I. Bulbalkov, A. Voronin, V. Ivanov, P. Ivanov, E. Malankin, D. Normanov, V. Samsonov, V. Shumikhin,
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
1 10/22/2009 PHENIX WEEKLY PLANNING 10/29/2009 Don Lynch.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Performance of PHENIX High Momentum Muon Trigger.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
MuTrg/Mutr Optimization Yoshi-mitsu Imazu. ● Mutr Lv1 timing scan Adjustment of Lv1 timing Online/Offline shape cut values ● Mutrg threshold scan → Better.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
RIKEN/RBRC Itaru Nakagawa
Seyoung Han / Ewha Woman’s Univeristy
BUCKEYE has internal shift register which controls calibration
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1

MuTRIG-FEE Install (Station-1) Completed Oct. 27 2

Station-2&3 Installation Completed by Oct.29 3

ADTX Installation Check List Miscabling –Visible inspection   –Gap-by-Gap calibration logic/mask check  –ADTX Performance   –Dead (single) channel check  –Board ID check   –Slow control (threshould 10mV, 30mV)   –PROM erase and Download  –Efficiency   –Fake hit   –Timing   MuTR FEE Performance –Noise w/o HV   –HV upto 1500V (st-1), 50V (st-2&3) w/ Ar-CO 2 gas  –Minor Tweak of Cable to improve noise  –Noise w/ HV on  –Gap-by-Gap calibration  found one miscabling in St-1, Oct.5  –Gain  stereo ~ 1, non-stereo~0.9   LV –Miscabling  –LV measurement at Chassis with all other power on  4

Impact on MuTR Pedestal 5

MuTR Resolution vs. Noise Csplit = 100pF Csplit = 30pF w/o ADboard ○ Intrinsic 100um Achieved : 200 ~300um Pedestal RMS/MIP 6

MuTR Pedestal RMS Distribution before/after ADTX Install Typical Pedestal RMS Distribution of MuTR Strip Number Pedestal RMS 7

MuTR Pedestal Station-1 Run9 Present Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1Gap-2Gap-3 stereoNon-stereostereoNon-stereostereoNon-stereo 8

MuTR Pedestal Station-2 9

Station-3 Octant-2 Noise before after 10

Aluminum Foil Shield on Station-3 Chamber 11

Station-3 Aluminum Foil Effect w/o foil w/ foil 12

MuTrig Performance With Calibration Pulse Timing Efficiency Miscabling Check Logic Test Without Calibration Pulse Fake hit rates 13

ADTX Timing (Gap-1) Strip# 14

ADTX Efficiency (Gap-1) Strip# 15 efficiency

ADTX Timing (Gap-2) 16

ADTX Efficiency (Gap-2) 17

ADTX Timing (Gap-3) 18

ADTX Efficiency (Gap-3) 19

Fake Hit Rate (Threshold=20mV) 20

21 LL1 Trigger Readiness Communication test  LL1 Board Production by end of October ADTX - MRG - LL1 - GL1 chain test this November. New high momentum trigger will be operated in Run10 for commissioning LL1 Board MuTRG-MRG Boards

DCM For Run10 Operation, 2 more FE3 were obtained from : 1.FOCAL 2.Colorado 22

Re-Capacitation Station-1 Station-2 23

Summary Installation to South Arm is completed. 24

Backup Slides 25