Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Advertisements

Transition from Q1- 8th to Q1- 9th edition
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Review of industry code governance 26 March 2010.
Mod 0273: 1 st Development Group Workshop 4 th February 2010.
Breach of a Requirement of the Code Marisa Orbea New York 19 June 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
FP7 Regler för deltagande 18 december 2006 Monica Hjertman, Enheten för Europaprogrammen, VINNOVA
John Zammit-Haber National Grid
Time for a new standard - AS General Conditions of Contract
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
WPD Connections Overview
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
A EUROPEAN WORKS COUNCIL WHAT IS IT FOR ? the legal framework.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
Disclosure of Preliminary Screening Staff package provided to MVEIRB prior to Board meeting MVEIRB informed of Board decision Decision issued three (working)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
NEGOTIATING TRADE FACILITATION Kennedy Mbekeani UNDP, RSC.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Click on Next to continue Next Introductio n Inputs Tools and Techniques Outputs The process of managing procurement relationships, monitoring contract.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Conflicts of Interest Peter Hughes IESBA June 2012 New York, USA.
OneBayArea Grant Update ( Cycle 2 STP/CMAQ) Regional Advisory Working Group April 3, 2012 Craig Goldblatt, MTC.
Contestability for Distribution Connections 26 th January 2016.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
Ukraine (nr 46514): Expert Mission on Supervision of Investment Funds` Activities - TAIEX On-site supervision of the investment funds industry in Poland.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Work Plan and Key Deliverables 2 November WORK PLAN.
ACMA Tune-up 400 MHz (Update and Milestone 3) MHz - Introduction 11 March 2016.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
GC0104 – Demand Connection Code (DCC)
process and procedures for assessments
Overview of Legislative Framework
Dispute Resolution Between ICT Service Providers in Saudi Arabia
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
REGULATIONS IN TERMS OF THE SPECIAL ECONOMIC ZONES ACT, 2014
INTERCONNECTION GUIDELINES
Grid Code Development Forum – 6 September 2017
Overview of the Electricity Regulation Bill
Transmission Planning Code
Introduction of Code Contingency Guidelines Document
Overview of the Electricity Regulation Bill
Holistic view of Charging Modifications – In flight 11th June 2018
Update on European Network Codes
Structure–Feedback on Structure ED-2 and Task Force Proposals
Institutional changes The role of Bilateral Oversight Boards
Approach to Market Cutover - Draft for Discussion
Exit Capacity Substitution and Revision
Joint Office Presentation for Modification 0678
Introduction of Code Contingency Guidelines Document
Enduring Solution – Stage 2 (ES-S2)
Adult Education Survey Anonymisation Point 6
Natura 2000 management group Brussels, 19 May 2011
Alignment of Part 4B with ISAE 3000
Presentation transcript:

Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016

Introduction Four responses to the consultation were received –SSE, NIRIG, RES, Omexom UK Renewables Recommendations Report –Draft report has been provided to the UR for comment Consultation on potential options for processing generation connection applications progressing in parallel –Depending on the outcome, further changes to contestability arrangements may be required.

Section B - Scope of Contestability 33 kV versus 5 MW threshold –33 kV not practical as eligibility for contestability only established by studies Transitional arrangements –Needs to be a cut-off point - by agreement on a case by case basis Connection Queue position –Contestability will not affect the queue position Clarification on CTs, VTs and protection equipment Level of inspection –Agree that level of inspection could be reduced on satisfactory performance Timelines for contestable works –Contractual timelines may be required in certain circumstances Contestable commissioning –Licensees do not consider it as feasible for Phase 1 Approved equipment – list of approved equipment and suppliers will be provided

Section C – The Application Process New definitions –Contestable Offer –Non-Contestable Offer Licensees have amended their proposals: Distribution –A customer can request a Contestable Offer at any time up to ten days after the date of issue of the Non-Contestable Offer Transmission –A customer may request either a Contestable Offer or a Non- Contestable Offer at the outset –A modified offer may be requested at any time up to ten days after the issue date of the initial offer Feedback on offer definitions?

Sect D - Offer and Offer Acceptance Process Under Article 19 of the Electricity Order NIE Networks must provide a Non-Contestable Offer for connection to the Distribution System Condition 25 of the SONI licence allows SONI to provide either a Contestable Offer or Non-Contestable Offer for connection to the Transmission System Both Licensees hold the view that two offers cannot be provided in 90 days –Not just charging differences, T&Cs may be different as well However, it is now proposed that a modified offer can be provided in 25 days from date of initial offer. –At least 55 days and at most 65 days to decide which offer to accept.

Section E - The Connection Process Extent of design review and formalised approach is under consideration Licensees have commenced further work on: –Pre-construction and construction programmes –Quality plans –Functional specifications –Pre-commissioning –Commissioning

Section F – Accreditation Acknowledge differences in other jurisdictions but still believe Lloyd’s scheme to be the best fit We will specify works that need to be accredited by Lloyd’s in updated Guidelines document –Acquisition of wayleaves not likely to be an accredited activity –Other specialist activities will be addressed

Section G – Adoption of Contestable Works Adoption Agreement – no consultation At transmission – it is still to be considered how any Adoption Agreement relates to the Connection Offer/Agreement from the TSO The contractual arrangements are under consideration Warranties –NIE Networks will review the warranty periods set out in the Guidelines –Not yet finalised but likely to be determined by voltage Definition of Defect –Under legal review Financial security –NIE Networks needs to be sure that the customer or ICP is either capable of rectifying a defect or NIE Networks can rectify the defect and recover its costs. –Credit rating has always been seen as lowest cost option

Section H – Consents and Wayleaves Licensees accept that wayleaves and easements may be obtained by a party other than the ICP. However it will be a condition precedent to adoption that wayleaves are in place as required. Licensees agree that the acquisition of land, wayleaves, easements and consents are not activities requiring accreditation under the NERS scheme and appropriate amendments will be made to the Guidelines.

Section I –Shared Connections and Clusters Significant difficulties –Needs complex contractual framework to be set up Lead developer –Appointment must be unanimous Funding of clusters –NI contribution is UR matter System operator preferred funding –Raise with UR Cost sharing –Contested costs unknown Latecomer –Balance to be struck between optimal grid development (duty under the Order) with obligations to offer and not disadvantage the earlier customer project delivery

Section J – Charging Arrangements The Licensees are considering the responses. A comprehensive review of the transmission and distribution connection charging methodologies and the TIA will be carried out as part of the implementation of contestability and concerns expressed will be taken into account as part of that review.

Section K – Governance and Disputes While some respondents supported the governance and disputes proposals in the Guidelines others favoured immediate referral of any dispute to the UR Others suggested industry review of any changes to contestability documentation The Licensees believe that the governance and disputes arrangements can evolve with time as needs determine

Next steps Further engagement between SONI and NIE in relation to contested transmission works in the following areas: Review and agreement on TIA changes to facilitate contestability Review and agreement on the connection charging methodologies Revision and agreement on the contractual framework for –direct connections (T and D) –D connections where transmission works are required –Shared and cluster connections