HINS Linac Simulations : Benchmarking, Jitter and Stripping. Jean-Paul Carneiro FNAL Accelerator Physics Center Accelerator Physics and Technology Workshop.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

BC System – Review Options ● BC2 working point (energy-charge-compr.) ● 2BC (rf-rf-bc-rf-bc-rf) ● table: 2BC (rf-rf-bc-rf-bc-rf) dogleg + 2BC (rf-dog-rf-rf-bc-rf-bc-rf)
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Feb 09, 2012 L. Vorobiev, I. RakhnoPage 1 Multi-Turn Stripping Injection and Foil Heating with Application to Project X Presentation Based on: Phys. Rev.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
J. Rudolph, Helmholtz-Zentrum Berlin EuCARD 2nd ANNUAL MEETING Slice emittance measurements at the ELBE superconducting RF photoinjector.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ion Accelerator Complex for MEIC January 28, 2010.
CALCULATIONS OF THE LCLS INJECTOR USING ASTRA Jean-Paul Carneiro DESY Hamburg ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Beam dynamics meeting, 2007/05/14Lars Fröhlich, MPY Dark Current Transport at FLASH Start-to-end tracking simulation analysis of beam and dark current.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
J. Rodnizki SARAF, Soreq NRC HB2008, August, 2008 Nashville TN Lattice Beam dynamics study and loss estimation for SARAF/ EURISOL driver 40/60 MeV 4mA.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Details of space charge calculations for J-PARC rings.
Overview of the High Intensity Neutrino Source Jean-Paul Carneiro FNAL Accelerator Physics Department FNAL Accelerator Physics and Technology Seminar February.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Beam Dynamics and Linac Simulation Petr Ostroumov Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
FNAL 8 GeV SC linac / HINS Beam Dynamics Jean-Paul Carneiro FNAL Accelerator Physics Center Peter N. Ostroumov, Brahim Mustapha ANL March 13 th, 2009.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
P. A. POSOCCO CERN – BE/ABP Intra-Beam stripping at SPL: should we be worried? 5 th SPL Collaboration meeting.
Optimization Objectives Top Level Questions 10 MeV – Incorporate studies on operability, cost etc. 50 MeV – More stringent beam specs  Optimize 50 MeV.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
ML (BC) Studies update Nikolay Solyak Arun Saini.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Marcel Schuh CERN-BE-RF-LR CH-1211 Genève 23, Switzerland 3rd SPL Collaboration Meeting at CERN on November 11-13, 2009 Higher.
LINAC4 transfer line – optics M. Eshraqi, L. Hein, A. Lombardi (BE-ABP) LINAC4 transfer lines : m (from PIMS out to foil); m new line,then.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
CW Linac (ICD-2+): Lattice Design in Project-X, Nikolay Solyak (on behalf of team: F.Ostiguy, J-P.Carneiro, N.Perunov, A.Vostrikov, A.Saini, V.Yakovlev,
N.Solyak (on behalf of PrX team) Fermilab Project X Collaboration Meeting, FNAL, Oct.25-27, 2011 N.Solyak, Pulsed Linac1 PrX Collab. Meeting, FNAL, Oct.25-27,
Working Group 7 Pulsed Linac and Injection Summary D. Johnson, S. Nagaitsev, D. Raparia for Working Group 7 participants September 9, 2010.
Emittance Growth in the SPPS Chicane P. Emma, P. Krejcik, C. O’Connell, M. Woodley; SLAC, H. Schlarb, F. Stulle; DESY.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
UBW2012, A. Matveenko Michael Abo-Bakr (presented by Alexander Matveenko) Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy.
HOMs in high-energy part of the Project-X linac. V. Yakovlev, N. Solyak, J.-F. Ostiguy Friday 26 June 2009.
Some Aspects on Compton Scheme Positron Source Study Wanming Liu ANL Tsunehiko OMORI KEK.
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Physics design on the main linac
Progress in the Multi-Ion Injector Linac Design
A. Plastun¹, B. Mustapha, Z. Conway and P. Ostroumov
Progress activities in short bunch compressors
Capture and Transmission of polarized positrons from a Compton Scheme
LCLS Longitudinal Feedback and Stability Requirements
Simulation Calculations
Simulations for the LCLS Photo-Injector C
Super-B Factory in a “4400m” Tunnel
CEPC Injector Linac beam dynamics
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

HINS Linac Simulations : Benchmarking, Jitter and Stripping. Jean-Paul Carneiro FNAL Accelerator Physics Center Accelerator Physics and Technology Workshop for Project X November 12 th, 2007

BENCHMARKING : HINS ACCELERATING SECTION TRACK (ANL, P. Ostroumov) / ASTRA (DESY, K. Floettmann) Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 Z~4 m W~2.5 MeV ~16 m ~10 MeV ~60 m ~120 MeV ~140 m ~420 MeV ~230 m ~1.2 GeV ~678 m ~8.0 GeV

Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 ~0.8 % RMS TRANSVERSE EMITTANCE BENCHMARKING : Zero Current

Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 BENCHMARKING : 45 mA (3D Space Charge) ~3 % ~9 % RMS TRANSVERSE EMITTANCE

RMS ENVELOPE BENCHMARKING : 45 mA (3D Space Charge) Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 RMS BUNCH LENGTH ~6% ~1%

BENCHMARKING : 45 mA (3D Space Charge) Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 RMS ENERGY SPREADRMS LONG. EMITTANCE ~8%~10%

RF JITTER STUDIES : HINS with 8 ILC RF Units + Transport Line Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07

Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 TRACK Parameters at the Stripping Foil (From PAC07 paper, 200kp) RF JITTER STUDIES : HINS with 8 ILC RF Units + Transport Line cavities edges (35 mm)

Statistical Error Simulations performed on OPTION 2 (45 mA) with the 8 ILC-units at ANL (JAZZ) with TRACK 4 cases (24 seeds, 200kp, 45 mA, 3D SC in acc. section)  0.5% 0.5 deg (NO collimators)  1% 1 deg (NO collimators)  1% 1 deg (WITH collimators : 2H 2V 6mm, 1H 1V 5.5mm)  2% 2 deg (NO collimators)  Gaussian Truncated at +/- 3 SIGMA RF JITTER STUDIES : HINS with 8 ILC RF Units + Transport Line Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07

2.0 % 2.0 deg 1% 1 deg (collimated) RF JITTER STUDIES : Long. Ph. Space at Stripping Foil (TRACK) 0.5 % 0.5 deg 1 % 1 deg Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07

RF JITTER STUDIES : Beam Spot at Stripping Foil (TRACK) 0.5 % 0.5 deg1 % 1 deg 2.0 % 2.0 deg1% 1 deg (collimated) Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07

H- STRIPPING : Analytics Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 H- Stripping Equations and Application to the High Intensity Neutrino Source (Beams-doc-2740, FNAL, April 2007) H- Stripping Equations and Application to the High Intensity Neutrino Source

Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 H- STRIPPING : Analytics 8 GeV300K

Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 H- STRIPPING : HINS (2 MW) and SNS (1.5 MW) HINSHINS SNSSNS

Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 H- STRIPPING : TRACK Simulations of Residual Gas Losses HINSSNS 1E-7 T 300 K 1E-7 T 2 K 1E-7 T 300 K 1E-7 T 300 K 1E-7 T 2 K 1E-7 T 300 K

CONCLUSION Jean-Paul Carneiro ProjectX Workshop, FNAL, November 12 th 07 TRACK- ASTRA : excellent agreement Jitter : 1 deg 1% is acceptable 2 deg 2 % is not acceptable H- Stripping : implemented into TRACK beam losses are controllable