Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.

Slides:



Advertisements
Similar presentations
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Advertisements

Léa RIFFAUT ANSES PPP Coordination Unit
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
PM EMISSIONS FROM TYRES AND BRAKES MAIN FACTS AND OPEN ISSUES Sustainable Transport Unit Institute for Energy and Transport Joint Research Centre 04 April.
Particle Measurement Programme Informal Working Group (PMP) Progress Report and Next Steps Giorgio Martini Sustainable Transport Unit.
Institute for Energy and Transport B. Giechaskiel, G. Martini
REPORT TO GRPE 70 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, January 2015 Agenda.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
PARTICLE EMISSIONS FROM TYRE AND BRAKE WEAR ON-GOING LITERATURE REVIEW SUMMARY AND OPEN QUESTIONS Sustainable Transport Unit Institute for Energy and Transport.
Particle Measurement Programme (PMP) Progress update
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
MACTP MOBILE AIRCONDITIONING TEST PROCEDURE Status report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item.
MACTP MOBILE AIR-CONDITIONING TEST PROCEDURE Status report 63th GRPE January 2012 Informal document No. GRPE (63th GRPE, January 2012, agenda.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 68 Geneva, 09 January 2014 Informal document No. GRPE (68th GRPE,
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
Brief Report to GRPE on the progress made by EFV Informal Group in its 5 th meeting held in New Delhi on 25 th November 2009 Informal document No. GRPE
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 22nd WHDC, Geneva, 16 January 2008 GRPE/WHDC/FE08 Informal document No.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
Transposition of EURO VI requirements into UN/ECE R49 Status report GRPE 9-June 2011 Submitted by the expert of European Commission 1 Informal document.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
NON EXHAUST TRAFFIC RELATED EMISSIONS WORKING DOCUMENTS Sustainable Transport Unit Institute for Energy and Transport Joint Research Centre 35 th PMP IG.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
PMP IWG Progress Report
PMP IWG Progress Report
WLTP Phase 2 Durability Task Force Update
Electric Vehicles and the Environment (EVE IWG)
PMP IWG Progress Report
PMP IWG Progress Report
Particle Measurement Programme - Report
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
76th UNECE GRPE session PMP IWG Progress Report
76th UNECE GRPE session PMP IWG Progress Report
BRAKE PARTICLE EMISSIONS
77th UNECE GRPE session PMP IWG Progress Report
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
PMP IWG Progress Report
Marine Strategy Framework Directive (MSFD)
HD ENGINE RAW PN MEASUREMENT
Informal document GRPE th GRPE, 9-12 January 2018
BRAKE PARTICLE EMISSIONS
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Informal document GRPE Rev1
ASEP IWG Report to GRB 65th
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
ASEP, from 2005 to 2019 Background informations and future works
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
Marine Strategy Framework Directive (MSFD)
Informal document GRPE-78-23
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Informal document GRPE-79-20
Transmitted by the experts of IWG ASEP
PMP INFORMAL GROUP Exhaust particle emissions – progress report
Scene setter European Commission DG Environment
Transmitted by the experts of IWG ASEP
ACEA and JRC PMP meeting 7/11/2018
Transmitted by the experts of IWG ASEP
Presentation transcript:

Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report UNITED NATIONS Informal document GRPE nd GRPE, January 2016, agenda item 7

2 PMP meetings 4 th -5 th March 2015 (Brussels): 36 th PMP meeting 7 th – 8 th October 2015 (Brussels): 37 th PMP meeting 13 th January 2016 (Geneva) : 38 th PMP meeting 9 th -10 th March 2016 (Brussels) : 39 th PMP meeting

3 Exhaust particle emissions

4 Calibration of PN systems Current procedure has been reviewed Decision to minimize changes to the current procedure – in any case the accuracy of the measurement would be only marginally improved Few remaining open issues: o Volatile removal efficiency (new test to be evaluated) o Calibration material for PNCs (Round Robin on going) o Applicable also to 10nm and PN-PEMS ??

5 Sub23nm measurements Need to lower the 23nm? Literature review and Experimental investigation at JRC o There are particles <23nm - Sometimes they are an artifact For GDIs 30-40% not counted (50% taking into account losses), higher in some cases e.g. higher ethanol concentration For motorcycles (2-s engines)up to >200% particles are not counted For PFIs % For DPFs this percentage is 5%. High emitters are still detected by PMP23nm Thus not critical yet for current engine technologies to which the PN limit is applicable

6 Sub23nm measurements Can we measure <23nm? Experimental investigation at JRC o Artifacts were confirmed in specific conditions o Existing systems with small modification can measure below 23nm (from 10 nm) - o Below 10 nm the measurements will have high uncertainty From 10 nm some areas need investigation like: o PCRF definition  same if down to 10nm (and controlled losses <23nm) o Specification of >10nm systems  ok (catalytic stripper highly recommended especially if all cases need to be covered e.g. 2- stroke engines) o Catalytic stripper  Draft specifications ready o New need of calibration procedures  under investigation if necessary

7 Key question: Should the PMP develop a draft test procedure with a cut off size of 10 nm? A change at this point would make sense: o If PN limit will be extended to other engine technologies o PN-PEMS are being finalized, thus a change to 10nm could be considered o Calibration procedures are being updated now However: o Sub23nm particles will be measured only partly due to losses in the PN systems (estimation 50%) o A catalytic stripper is not necessary for current engine technologies but necessary if others will be covered in the future. o Long term experience is lacking

8 Interest in this approach confirmed by some engine manufacturers and some instrument manufacturers 01 Series of amendments to UNECE Reg. 132 already includes such possibility but the procedure is not defined First analysis of potential benefits/issues presented during the last meetings Correlation with other methods (CVS and partial flow system) and advantages/disadvantages to be checked – Additional data needed to answer specific questions ( primary dilution, losses, volatile removal efficiency, pressure effects, time alignment…) 8 PN Counting for HD engines from Raw Exhaust via Fixed Dilution

9 Non-exhaust particle emissions ( Particles generated from brake and tyre/road wear )

10 Following the GRPE Informal Document, the PMP IWG has identified and focused its work regarding non-exhaust particle emissions on 4 WI: Background - Objective WI-1: Investigation of “typical” driving patterns WI-2: Compilation and monitoring of on-going projects related to non-exhaust particle emissions WI-3: Networking and exchange of information with experts in the field WI-4: Development of a set of recommended measurement techniques and sampling procedures

11 WI1 - Investigation of “typical” driving patterns – Status An analysis based on activity data collected in the framework of the WLTP project has been conducted Parameters relevant for both brake and tyre/road wear have been calculated. Among others distributions of speed, acceleration, deceleration, number of braking events, etc. were calculated and presented in the last PMP meeting One of the main results is that the differences in typical driving/braking patterns relevant for non-exhaust emissions are quite limited among the different regions

12 WI1 - Investigation of “normal” driving patterns – Next Steps The final complete report and a summary with the main results will be released in the next weeks and will be available on the PMP IWG dedicated webpage Currently real world data provided by industrial partners as well as industrial cycles for brake testing are being processed with the aim of comparing them to the data derived from the WLTP database – preliminary results will be presented in the next face to face meeting Depending on the GRPE decision, this set of data could represent a good basis for the development of a test cycle to assess particle emissions from brake wear

13 WI2 & WI3 - Related research projects & Networking - Status So far, information on several research projects – mostly related to brake wear – have been presented to the F2F meetings. Also the results of the TIP project on tyre/road wear were discussed in detail A document that contains information related to the projects for keeping the group informed has been created and updated regularly Several experts from different origins (industry, research institutes, universities) have already been following the activities and contribute with their knowledge to the work done within the PMP IWG A list of experts who participate in the PMP IWG has been created and is available at the PMP website

14 WI4 - Sampling procedures and measurement techniques - Status Two possible approaches: test rig based measurements and measurement of emissions from the whole vehicle (either in the lab or on the road) Although there are experimental setups capable of measuring particle emissions from brake/tyre/road wear under real world conditions (on- road), the approach presents difficulties and high uncertainties As far as brake wear emissions are concerned and in view of a possible development of a standardized measurement procedure for particle emissions, there is consensus among the PMP members that a test rig approach focusing on the brake system (disk + pad) is much less technically challenging than measuring particle emissions from a whole vehicle

15 WI4 - Sampling procedures and measurement techniques - Status Several different test rigs configurations, based on a brake dyno, are currently used - some of them have already been presented to the PMP group and quite extensively investigated. Two main issues to be addressed: comparison of different test rig configurations and correlation with real world emissions (e.g. a test rig approach does not cover technologies like regenerative braking ad vehicle to vehicle communication that could reduce anyway particle emissions) Regarding tyre/road wear particles currently existing sampling methods fail to distinguish particles coming from the tyre and the road surface

16 Non-exhaust particle emissions – Key messages Brake wear emissions: Industry (OEMs and instrument manufacturers) is actively working on the development of brake dyno rigs to assess particle emissions from brake systems It is likely that in the near future data and experience acquired in these activities may represent a good basis for the development, in case this is considered necessary, of a standardised measurement procedure based on the brake dyno concept

17 Non-exhaust particle emissions – Key messages Tyre and road wear particle emissions: Much more challenging situation – difficult to separate tyre and road contribution. A standardized methodology (ISO TS) for measuring the contribution of TRWP on air pollution for research purposes is under development – results presented by tyre industry based on such methodology suggest a limited contribution of tyres to PM10 and PM2.5 No clear pathway for the development of a standardized methodology for the direct measurement of TRWP emissions (e.g. particle mass and/or particle number) A large scale investigation on the open issues, notably those related to the sampling and measurement techniques would be needed.

18 Next steps The Chairman of GRPE requested in June 2015 a summary report as result of the information collection phase to be discussed within GRPE and WP29 The PMP group will work on this document over the next months with the objective of submitting it to GRPE by June 2016 On the basis of the information that will be made available, a decision will have to be taken about the next steps (e.g. extend the mandate of the PMP to specific objectives like the development of harmonized test cycles and measurement procedure) PMP appreciates guidance on priorities, indication of preferred timing and next steps from GRPE and will present a request for an updated mandate at the 73rd GRPE –June 2016 and a proposed timeline for the further activities

19 Stay in touch JRC Science Hub: ec.europa.eu/jrc Twitter and LinkedIn: european-commission-joint-research-centre YouTube: JRC Audiovisuals Vimeo: