Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.

Slides:



Advertisements
Similar presentations
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Advertisements

Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
OPERATIONAL BUDGETING
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Flexible Budgets and Performance Analysis. Learning Objective 1 Prepare a flexible budget.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Flexible Budgets and Performance Analysis Chapter 10 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
© 2010 The McGraw-Hill Companies, Inc. Flexible Budgets and Performance Analysis.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Flexible Budgets and Overhead Analysis Chapter 11.
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Flexible Budgets and Overhead Analysis 11/30/04 Chapter 11.
Standard Costing and Variance Analysis
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Flexible Budget, Overhead Cost Variances and Management Control
Financial and Managerial Accounting
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Budgetary Control and Responsibility Accounting
Flexible Budgets and Standard Costs
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Budgeting: The Basis for Planning and Control – Planning Developing objectives for acquisition and use of resources. – Control Steps taken by management.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Copyright © The McGraw-Hill Companies, Inc 2011 FLEXIBLE BUDGETS AND PERFORMANCE ANALYSIS Chapter 9.
© 2009 The McGraw-Hill Companies, Inc., All Rights Reserved F LEXIBLE B UDGETS AND S TANDARD C OSTS Chapter 24.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Flexible Budgets and Overhead Analysis Chapter 7.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/IrwinCopyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and.
1 Flexible Budgets and Performance Analysis Chapter 10.
Chapter 9. Static Budgets and Performance Reports Static budgets are prepared for a single, planned level of activity. Performance evaluation is difficult.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Chapter 17 Overhead Cost Management Flexible Budgets.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Flexible.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
9-1 Larry’s Lawn Service provides lawn care in a planned community where all lawns are approximately the same size. At the end of May, Larry prepared his.
11th Edition Chapter 11.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 8A.
Flexible Budgets and Overhead Analysis
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Performance Evaluation
Flexible Budgets and Overhead Analysis
Managerial Accounting
Flexible Budgets and Performance Analysis
Operational Budgeting
Flexible Budgets and Overhead Analysis
Paper F2 Management Accounting
Flexible Budgets and Performance Analysis
Flexible Budgets and Overhead Analysis
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
Presentation transcript:

Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.

Flexible Budgets Static budgets are prepared for a single, planned level of activity. Performance evaluation for overhead is difficult when actual activity differs from the planned level of activity. Hmm! Comparing static budgets with actual costs is like comparing apples and oranges. 11-2

Static Budgets and Performance Reports U = Unfavorable variance Cheese Company was unable to achieve the budgeted level of activity. 11-3

Static Budgets and Performance Reports F = Favorable variance since actual costs are less than budgeted costs. Since cost variances are favorable, have we done a good job controlling costs? 11-4

I don’t think I can answer this question using a static budget. I do know that actual activity is below budgeted activity which is unfavorable. But shouldn’t variable costs be lower if actual activity is below budgeted activity? Static Budgets and Performance Reports 11-5

Static Budgets and Performance Reports The relevant question is... “How much of the favorable cost variance is due to lower activity, and how much is due to good cost control?” To answer the question, we must the budget to the actual level of activity. 11-6

Flexible Budgets Central Concept If you can tell me what your activity was for the period, I will tell you what your costs and revenue should have been. 11-7

Advantages of Flexible Budgets Improve performance evaluation. May be prepared for any activity level in the relevant range. Show revenues and expenses that should have occurred at the actual level of activity. Reveal variances due to good cost control or lack of cost control. 11-8

Preparing a Flexible Budget 11-9

Preparing a Flexible Budget Variable costs are expressed as a constant amount per hour. Fixed costs are expressed as a total amount that does not change within the relevant range of activity

Preparing a Flexible Budget 11-11

Preparing a Flexible Budget 11-12

Preparing a Flexible Budget Note: There is no flex in the fixed costs

Preparing a Flexible Budget Budgeted variable Total overhead cost per activity activity unit units ×+ Budgeted fixed overhead cost Total budgeted overhead cost = 11-14

Flexible Budget Performance Report Now let’s prepare a budget performance report at 8,000 actual machine hours for the Cheese Co

Flexible Budget Performance Report 11-16

Flexible Budget Performance Report Flexible budget is prepared for the same activity level (8,000 hours) as actually achieved

Flexible Budget Performance Report 11-18

Flexible Budget Performance Report Indirect labor and indirect material have unfavorable variances because actual costs are more than the flexible budget costs

Flexible Budget Performance Report Power has a favorable variance because the actual cost is less than the flexible budget cost

Overhead Application in a Standard Costing System 11-21

Overhead Application in a Standard Costing System 11-22

Choice of Activity Measure l Variable overhead and the activity measure should vary in a similar pattern. l Identify variable overhead cost drivers. l Examples: machine hours, labor hours, process time. l Dollar measures should be avoided as they are subject to price-level changes

Cost Management Using Overhead Cost Variances Let’s turn our attention to the computation of overhead cost variances. We will begin with variable overhead

Spending Variance Efficiency Variance AH × SVR AH × AR AH = Actual Hours of Activity AR = Actual Variable Overhead Rate SVR = Standard Variable Overhead Rate SH = Standard Hours Allowed SH × SVR Actual Flexible Budget Flexible Budget Variable for Variable for Variable Overhead Overhead at Overhead at Incurred Actual Hours Standard Hours Variable Overhead Variances 11-25

Spending Variance Efficiency Variance AH × SVR AH × AR SH × SVR Actual Flexible Budget Flexible Budget Variable for Variable for Variable Overhead Overhead at Overhead at Incurred Actual Hours Standard Hours Variable Overhead Variances Spending variance = AH(AR - SVR) Efficiency variance = SVR(AH - SH) 11-26

Variable Overhead Variances – Example ColaCo’s actual production for the period required 3,200 standard machine hours. Actual variable overhead incurred for the period was $6,740. Actual machine hours worked were 3,300. Compute the variable overhead spending and efficiency variances

Variable Overhead Variances – Example ColaCo prepared this budget for overhead: Budgeted variable Total overhead cost per x activity activity unit units + Budgeted fixed overhead cost Total budgeted overhead cost = = $2.00 per machine hour × Total machine hours + $9,

3,300 hours 3,200 hours × × $2.00 per hour $2.00 per hour Spending variance $140 unfavorable Efficiency variance $200 unfavorable Actual Flexible Budget Flexible Budget Variable for Variable for Variable Overhead Overhead at Overhead at Incurred Actual Hours Standard Hours $6,740$6,600$6,400 Variable Overhead Variances – Example 11-29

3,300 hours 3,200 hours × × $2.00 per hour $2.00 per hour Actual Flexible Budget Flexible Budget Variable for Variable for Variable Overhead Overhead at Overhead at Incurred Actual Hours Standard Hours $6,740$6,600$6,400 Variable Overhead Variances – Example The $140 unfavorable spending variance and the $200 unfavorable efficiency variance results in a $340 unfavorable flexible budget variance

Variable Overhead Variances – A Closer Look Spending Variance Efficiency Variance Results from paying more or less than expected for overhead items and from excessive usage of overhead items. A function of the selected cost driver. It does not reflect overhead control

Fixed Overhead Now let’s turn our attention to fixed overhead

Budget Variance Volume Variance PFOHR = Predetermined Fixed Overhead Rate SH = Standard Hours Allowed SH × PFOHR Actual Fixed Fixed Fixed Overhead Overhead Overhead Incurred Budget Applied Fixed Overhead Variances 11-33

PFOHR = Applied Fixed Overhead = PFOHR × Standard Hours Budgeted Fixed Overhead Planned Activity in Hours Fixed Overhead Recall that fixed overhead costs are applied to products and services using a predetermined fixed overhead rate (PFOHR): 11-34

Fixed Overhead Variances – Example ColaCo used the following predetermined fixed overhead rate: PFOHR = Budgeted Fixed Overhead Planned Activity in Hours PFOHR = $9,000 3,000 machine hours PFOHR = $3.00 per machine hour 11-35

Fixed Overhead Variances – Example ColaCo’s actual production required 3,200 standard machine hours. Actual fixed overhead was $8,450. Compute the fixed overhead budget and volume variances

3,200 hours × $3.00 per hour Fixed Overhead Variances – Example Actual Fixed Fixed Fixed Overhead Overhead Overhead Incurred Budget Applied $8,450$9,000$9,600 Budget variance $550 favorable Volume variance $600 (neither favorable nor unfavorable) 11-37

Fixed Overhead Variances – A Closer Look Budget Variance Volume Variance Results from paying more or less than expected for overhead items. Results from the inability to operate at the activity level planned for the period. Has no significance for cost control

End of Chapter 11 I’m here to your budget. Are you ready to ante up? 11-39