AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs.

Slides:



Advertisements
Similar presentations
Standard Costs and Variances
Advertisements

Standard Costing and Variance Analysis
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
OPERATIONAL BUDGETING
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Managerial Accounting
Using Variances under Standard Cost System
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
23 Performance Evaluation Using Variances from Standard Costs
Standard Costs and Balanced Scorecard
PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor of Accounting Bryant University © Copyright 2007 Thomson South-Western, a.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Financial and Managerial Accounting
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Flexible Budgets and Standard Costs
Chapter 21 Flexible Budgets and Standard Costing.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Factory Overhead Planned, Applied & Actual
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
Budgetary Planning and Control
1 Click to edit Master title style Performance Evaluation Using Variances From Standard Costs 7.
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
1 Chapter Eleven Standard Costs and Variance Analysis.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 2 – Understanding How Standards are Used in Budgeting.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 22 Performance Evaluation Using Variances from Standard Costs Accounting, 21 st Edition Warren Reeve Fess PowerPoint Presentation by Douglas Cloud.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
Chapter 10 Standard Costs and the Balanced Scorecard.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 3 – Computing Direct Materials and Direct Labor Variances.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Budgeting Student Version Describe budgeting, its objectives, and its impact on human behavior
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Performance Evaluation and Using Variances Chapter M6.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 9 Introduction to a Standard Cost System.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
Cornerstones of Managerial Accounting, 5e
Chapter 20: Standard Costing: A Managerial Control Tool
Performance Evaluation
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
Foundations and Evolutions
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Performance Evaluation Using Variances from Standard Costs
Standard Cost Accounting Materials, Labor, and Factory Overhead
Principles of Accounting 2002e
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 20: Standard Costing: A Managerial Control Tool
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs

Standards Standards are performance goals. Manufacturers normally use standard costs for each of the three product costs: Direct materials Direct labor Factory overhead 1 2

Accounting systems that use standards for direct materials, direct labor, and factory overhead are called standard cost systems. 1 3

When actual costs are compared with standard costs, only the exceptions or variances are reported for cost control (called reporting by the principle of exceptions). Such reports allow management to focus on correcting the cost variances. 1 4

The standard-setting process normally requires the joint efforts of accountants, engineers, and other management personnel. Setting Standards 1 5

Unrealistic standards that can be achieved only under perfect operating conditions (such as no idle time, no machine breakdowns, no materials spoilage) are called ideal standards or theoretical standards. Types of Standards 1 6

Currently attainable standards, sometimes called normal standards, can be attained with reasonable effort. Standards set at this level allow for disruptions, such as material spoilage and machine breakdowns. 1 7

Standard costs should be periodically reviewed to ensure that they reflect current operating conditions. Standards should be revised when they no longer reflect operating conditions. Reviewing and Revising Standards 1 8

The standard cost per unit for direct materials, direct labor, and factory overhead is computed as follows: Standard Cost per Unit = Standard Price × Standard Quantity 2 9

Standard Cost for XL Jeans 2 Exhibit 1 10

Budget Performance Report The report that summarizes actual costs, standard cost, and the differences for the units produced is called a budget performance report. 2 11

A favorable cost variance occurs when the actual cost is less than the standard cost (at actual volumes). An unfavorable cost variance occurs when the actual cost exceeds the standard cost (at actual volumes). 2 12

Budget Performance Report 2 Exhibit 2 13

Manufacturing Cost Variance The total manufacturing cost variance is the difference between total standard costs and total actual cost for the units produced. 2 14

Manufacturing Cost Variances 2 Exhibit 3 15

The total direct materials variance is separated into price and quantity variances. Direct Materials Variance 2 16

The total direct labor variance is separated into rate and time variances. Direct Labor Variance 2 17

Direct Materials Variances Actual Direct Materials Cost = Actual Price × Actual Quantity Actual Direct Materials Cost = $5.50 × (7,300 sq. yards.) Actual Direct Materials Cost = $40,150 Standard Direct Materials Cost = Standard × Standard Quantity Standard Direct Materials Cost = $5.00 × (7,300 sq. yards.) Standard Direct Materials Cost = $37,150 Actual costs ($40,150) – Standard costs ($37,500) = $2,650 Total Unfavorable Materials Variance 3 18

Direct Materials Price Variance Direct Materials Price Variance = (Actual Price – Standard Price) × Actual Quantity Direct Materials Price Variance = ($5.50 – $5.00) × 7,300 sq. yds. Direct Materials Price Variance = $3,650 Unfavorable Variance Western Rider paid $0.50 more per square yard of material than the standard. 3 19

Direct Materials Quantity Variance Direct Materials Quantity Variance = (Actual Quantity – Standard Quantity) × Standard Price Direct Materials Quantity Variance =(7,300 sq. yds. – 7,500 sq. yds. × $5.00 Direct Materials Price Variance = ($1,000) Favorable Variance Western Rider used 200 less square yards of material than the standard. 3 20

Direct Materials Variance Relationships $3,650 U Materials price variance Actual quantity × Standard price 7,300 × $5.00 = $36,500 Actual quantity × Actual price 7,300 × $5.50 = $40,150 Standard quantity × Standard price 7,500 × $5.00 = $37,500 ($1,000) F Material quantity variance Actual cost: Standard cost: $40,150 – $37,500 = $2,650 U Total direct materials cost variance 3 Exhibit 4 21

Direct Labor Variances Actual Direct Labor Cost = Actual Rate per Hour × Actual Time Actual Direct Labor Cost = $10.00 per hr. × 3,850 hrs. Actual Direct Labor Cost = $38,500 Standard Direct Labor Cost = Standard Rate per Hour × Standard Time Standard Direct Labor Cost = $9.00 per hr. × 4,000 hrs. Standard Direct Labor Cost = $36,000 Actual costs ($38,500) – Standard costs ($36,000) = $2,500 Total Unfavorable Labor Variance 3 22

Direct Labor Rate Variance Direct Labor Rate Variance = (Actual Rate per Hour – Standard Rate per Hour) × Actual Hours Direct Labor Rate Variance = ($10.00 – $9.00) × 3,850 hours Direct Labor Rate Variance = $3,850 Unfavorable Variance If the actual direct labor rate for the units produced is less than the standard direct labor rate, the variance is favorable. 3 23

Direct Labor Time Variance Direct Labor Time Variance = (Actual Direct Labor Hours – Standard Direct Labor Hours) × Standard Rate per Hour Direct Labor Time Variance =(3,850 hours – 4,000 direct labor hours) × $9.00 Direct Labor Time Variance = ($1,350) Favorable Variance If the actual direct hours for the units produced exceeds the standard direct labor hours, the variance is unfavorable. 3 24

Direct Labor Variance Relationships Actual hours × Standard rate 3,850 × $9 = $34,650 Actual hours × Actual rate 3,850 × $10 = $38,500 $3,850 U Direct labor rate variance Standard hours × Standard rate 4,000 × $9 = $36,000 ($1,350) F Direct labor time variance Actual cost: Standard cost: $38,500 – $36,000 = $2,500 U Total direct labor cost variance 3 Exhibit 5 25

Factory overhead costs are more difficult to analyze than are direct labor and materials costs. This is because factory overhead costs have fixed and variable cost elements. 4 26

Factory Overhead Cost Budget Indicating Standard Factory Overhead Rate 4 Exhibit 6 27

Factory Overhead Rate = The Factory Overhead Flexible Budget Budgeted Factory Overhead at Normal Capacity Normal Productive Capacity Factory Overhead Rate = $30,000 5,000 direct labor hours Factory Overhead Rate = $6.00 per direct labor hour 4 28

Fixed Factory Overhead Rate = Fixed Factory Overhead Rate Budgeted Fixed Overhead at Normal Capacity Normal Productive Capacity Fixed Factory Overhead Rate = $2.40 per direct labor hour $12,000 5,000 direct labor hours Fixed Factory Overhead Rate = 4 29

Variable Factory Overhead Rate = Variable Factory Overhead Rate Budgeted Fixed Overhead at Normal Capacity Normal Productive Capacity Variable Factory Overhead Rate = $3.60 per direct labor hour $18,000 5,000 direct labor hours Variable Factory Overhead Rate = 4 30

Variable Factory Overhead Variances Actual Variable Factory Overhead = Budgeted Variable Factory Overhead – Variable Factory Overhead Controllable Variance Standard Hours for Actual Units Produced Variable Factory Overhead Rate × 4 31

Variable Factory Overhead Variances Actual Variable Factory Overhead = Budgeted Variable Factory Overhead – Variable Factory Overhead Controllable Variance 4,000 direct labor hours × $3.60 $14,

Variable Factory Overhead Controllable Variance = $10,400 – $14,400 Variable Factory Overhead Controllable Variance = $(4,000) Favorable Variance Actual Variable Factory Overhead = – Variable Factory Overhead Controllable Variance $14,

Fixed Factory Overhead Variances Standard Hours for 100% of Normal Capacity = Standard Hours for Actual Units Produced Fixed Factory Overhead Volume Variance – Fixed Factory Overhead Rate × = Fixed Factory Overhead Volume Variance 5,000 direct labor hours 4,000 direct labor hours $2.40 × – = Fixed Factory Overhead Volume Variance $2,400 Unfavorable Variance 4 34

Reasons for an Unfavorable Volume Variance 1.Failure to maintain an even flow of work 2.Machine breakdowns 3.Work stoppage caused by lack of materials or skilled labor 4.Lack of enough sales orders to keep the factory operating at normal capacity 4 35

Factory Overhead Cost Variance Report 4 Exhibit 8 36

Actual Factory Overhead = Applied Factory Overhead – Total Factory Overhead Cost Variance Standard Hours for Actual Units Produced Total Factory Overhead Rate × 4 37

Actual Factory Overhead = Applied Factory Overhead – Total Factory Overhead Cost Variance 5,000 jeans x 0.80 direct labor hr. per pair of jeans $6.00 × 4 38

5,000 jeans x 0.80 direct labor hr. per pair of jeans $6.00 × Actual Factory Overhead = – Total Factory Overhead Cost Variance Applied Factory Overhead $24,

$22,400 = – Total Factory Overhead Cost Variance $24,000 Total Factory Overhead Cost Variance = $(1,600) Favorable Variance Actual Factory Overhead = - Total Factory Overhead Cost Variance Applied Factory Overhead $24,

Factory Overhead Variances and the Factory Overhead Account Factory Overhead Actual factory overhead22,400 Applied factory overhead24,000 $10,400 + $12,000 4,000 hours × $6.00 per hour 4 41

Balance, June 301,600 Overapplied factory overhead Factory Overhead Actual factory overhead22,400 Applied factory overhead24,

Actual Factory Overhead $22,400 Controllable Variance Applied Factory Overhead $24,000 Volume Variance Budgeted Factory Overhead for Amount Produced Variable factory OH$14,400 Fixed factory OH 12,000 Total$26,400 Factory Overhead Actual factory overhead 22,400 Applied factory overhead 24,000 $(4,000) F$2,400 U Total Factory Overhead Cost Variance $(1,600) F 4 43

Standard costs may be used as a management tool separately from the accounts in the general ledger. However, many companies include both standard costs and variances, in addition to actual costs, in their accounts. 5 44

Western Rider Inc. purchased, on account, the 7,300 square yards of blue denim at $5.50 per square yard. The standard price was $5.00 per square yard. Recording and Reporting Variances from Standards 5 45

Western Rider Inc.’s Purchase of Materials Entry $5.50 × 7,300 = $40,150 $5.00 × 7,300 = $36,500 $3,650 U Direct materials price variance 5 46

Western Rider Inc. used 7,300 square yards of blue denim to produce 5,000 pairs of XL jeans, compared to the standard of 7,500 square yards. 5 47

Western Rider Inc.’s Use of Materials Entry $5.00 × 7,500 = $37,500 $5.00 × 7,300 = $36,500 $(1,000) F Direct materials quantity variance 5 48

Variances from Standards in Income Statement 5 Exhibit 9 49

Internal Use Only The income statement shown in Exhibit 9 is for internal use by management. Variances are not reported to external users. 5 50

A nonfinancial performance measure is a performance measure expressed in units other than dollars. Nonfinancial Performance Measures 6 51

Inventory turnover Percent on-time delivery Elapsed time between a customer order and product delivery Customer preference rankings compared to competitors Response time to a service call Time to develop new products Employee satisfaction Number of customer complaints 6 Nonfinancial Performance Measures 52

Nonfinancial measures can be linked to either the inputs or outputs of an activity or process. A process is a sequence of activities linked together for performing a particular task. 6 53

Outputs Line wait Percent order accuracy Friendly service score Activity Counter service Inputs Employee training Employee experience Number of new menu items Number of employees Fryer reliability Fountain drinks available Counter Service Activity of a Fast-Food Restaurant 6 54