Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
August NSTX-U Team Meeting. Engineering Operations August 15, 2014 NSTX-U In-Vessel installations and calibrations have concluded, and activities have.
M. Ono NSTX-U PAC 35 June 11-13, 2014 NSTX-U Masa Ono for the NSTX-U Team Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Chubaka Producciones Presenta :.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
NSTX NSTX Team Meeting –Masa Ono Feb. 11, 2014 NSTX-U Team Meeting February 11, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
PAC-35 responses: M&P and Liquid Metals MA Jaworski 7/24/14.
NSTX-U Research Plans for FY J. Menard, M. Ono - PPPL For the NSTX-U Research Team FY2015 FES Budget Planning Meeting Germantown, MD April 10, 2013.
Macroscopic Stability Research Timeline FY Physics Optimize shaping, RWM/TM control (n≥1 using the second SPA), validate internal mode physics.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
NSTX-U 5 year plan text finalization J. Menard 5YP Update Meeting B318 March 28, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX NSTX PAC-25 – Background info (Menard)February 18, NSTX FY Research Milestones (base and incremental ) Expt. Run Weeks: 1)Transport.
NSTX NSTX Team Meeting –Masa Ono April 25, 2014 NSTX-U Team Meeting April 25, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Program Update J. Menard For the NSTX-U Research Team NSTX-U Team Meeting PPPL – B318 June 5, 2015 NSTX-U Supported by Culham Sci Ctr York U Chubu.
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
Overview of the NSTX-U 5 Year Plan Research Program for J. Menard For the NSTX-U Research Team NSTX-U PAC-33 Meeting PPPL – B318 February 19-21,
NSTX 5 year plan – J. Menard and M. Ono 1 Schedule for development FY09-13 NSTX 5 Year Plan April 2007Draft plan for key approaches in support of opportunities.
April NSTX-U Team Meeting. Engineering Operations April 25, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in mid-June to shift activities.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
NSTX-U cryo/particle control discussion #8 December 19, 2012 What have we done, or plan to do to be responsive to PAC questions, and in prep for 5 year.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
NSTX Team Meeting May 5, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Summary of RF Work To Date G. Taylor NSTX Monday Physics Meeting June 21, 2010 NSTX Supported by 1.
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
FY10 Ops Preparations: Extended vessel bake (to 3 weeks) Additional Physics Operators Spare LITER probes/fill systems fabricated & new staff Run day status/plans.
M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Martin Peng NSTX Program Advisory Committee Meeting (PAC-14) January 21 – 22, 2003 PPPL Princeton, NJ PAC-13 Action Items Supported by Columbia U Dartmouth.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
FY WEP TSG Goals & WEP-Relevant Diagnostic Upgrades NSTX Supported by WEP TSG Meeting September 14,
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
NSTX NSTX Team Meeting –Masa Ono May 1, 2015 NSTX-U Team Meeting May 1, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
1FY 2016 Q1 Review, Project, M Ono, February 8, 2016 Masa Ono and Jon Menard NSTX-U Project / Facility Status NSTX-U FY 2016 Q1 Review Meeting February.
The Calendar.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U NSTX-U PAC-31 – NSTX-U Program Overview, J. Menard (04/17/2012) NSTX-U 5 year plan goal: implement cryo-pumping and begin transition to metallic.
Supported by NSTX-U Overview of Research Plans for NSTX Upgrade* Jon Menard (PPPL) NSTX-U Program Director Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
1NSTX-U Team Meeting – August 14, 2015 Jon Menard NSTX-U Program Director NSTX-U Program Update NSTX-U Team Meeting PPPL - MGB August 14, 2015 This work.
1 The Five Year Plan review went well on all counts Review held June 30 - July 2 > 1.5 days of presentations by the Team Panel of nine (Hooper, Bravenec,
1NSTX-U FY2016 Q1 Review – Program / Menard – February 8, 2016 Jon Menard, Stan Kaye, Masa Ono (PPPL) For the NSTX-U Team NSTX-U Program FY2016 Q1 Report.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 NSTX-U Team Meeting August 14, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
For the NSTX Five-Year Research Program 2009 – 2013 M.G. Bell Facility and Diagnostic Plans.
FY16 Budget Build (Banner)
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Time: 1:30 ~ 3:30, February 5 (Friday), 2016 Place: LSB 318, PPPL General Items (20 minutes) M.O. Program Items (20 minutes) J.M. Run Coordinations (20 minutes) J.M. / S.G Experimental research operations (20 minutes) S.G. Engineering operations (20 minutes) T. S. NSTX-U Team Meeting Agenda 2

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Please respond to the quarterly safety survey when requested. NSTX-U operational preparation activity (e.g., diagnostic installation) requires constant vigilance regarding safety! Winter weather is here! - Proper protective clothing / equipment for outdoor work, keep warm - Slippery road and walk-way c o n d i t i o n s – W e a r r u b b e r s o l e s h o e s a n d b e m i n d f u l o f s u r f a c e s c o n d i t i o n s - Proper exercise – warm up Safely, Safely, Safely 3 ES&H Issues (J. Levine)

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 FY 2016 plasma operations started!!! Expecting to run 18 run weeks in FY 2016 Boronizations Plasma Operations started on Dec. 18. H-Mode! 4 PAC 37 After CD-4, we vented briefly to install various items before the bake. Bakeout was completed with good vacuum pressure in October During ISTP, MGs experienced control problem during ISTP. The problem resolved and MG#1 is supporting the operations. Plasma operation started on Dec. 18 and ran for 2.5 days before the holiday. The first boronization performed on Jan. 4, 2016 and performed three times. The fourth one tomorrow. NBI injection started and H-mode access achieved quickly. APSISTW 2015 November 2015December 2015January 2016 ISTP Post bake Plasma Operation Holiday February Maintenance Today

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Latest run plan schedule for 2016 Goal is to operate 18 run weeks  FY16 budgets are favorable enough to support 18 weeks  Want as much data as possible for IAEA synopses/meeting, APS-2016 December: 0.5 run weeks (XMP) January:~ 2 run weeks (XMP, XP), PAC-37 Two week maintenance: NBI T-line repair, Argon Purge System, LITER, Diagnostics February:~ 3 run weeks March ~ 3 run weeks –Mid-run assessment in March/April April – June9.5 run weeks, complete FY16 run July: Start outage: install high-k, high-Z tiles, … Resume operations winter 2017 for FY17: ~16 run weeks 5

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 New center-stack 2nd NBI Li granule injector High-Z PFC diagnostics Off-midplane 3D coils (NCC) up to 1 MA plasma gun Lower divertor cryo-pump Upgraded CHI for ~0.5MA LLD using bakeable cryo-baffle DBS, PCI, or other intermediate-k Divertor P rad Snowflake Run Weeks: Five Year Facility Enhancement Plan (green – ongoing) 2015: Engineering design for high-Z tiles, Divertor Cryo-Pump, NCC, ECH MGI disruption mitigation 4 coil AE antenna HHFW limiter upgrade Establish control of: Rotation High k  Laser blow-off Boronization Enhanced MHD sensors Neutron collimator Charged fusion product Upgraded halo sensors Pulse-burst MPTS nene Integrated Scenarios Core Science Boundary Science + Particle Control Upgrade Outage1.5  2 MA, 1s  5s MAPP 42 ch MPTS 48 ch BES MSE/LIF FIReTIP Major enhancements: Base funding +15% incremental Fiscal Year: 1 MW ECH/EBW High-Z tile row on lower OBD  B diag. - incremental MA CHI q min 6 LiTER Upward LiTER