DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.

Slides:



Advertisements
Similar presentations
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
A data-driven performance evaluation method for CMS RPC trigger system & Study of Muon trigger efficiencies with official Tag & Probe package for ICHEP.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Proposal by the Numbers 3 Trigger layers (plus 2 “short” layers) provide full coverage to eta=??? in 15 degree sectors Hits collected in real time, sent.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Design Considerations for an Upgraded Track-Finding Processor in the Level-1 Endcap Muon Trigger of CMS for SLHC operations Sep TWEPP09 D. Acosta,
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
C. Fernández Bedoya on behalf of DT Upgrade group.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
C. F. Bedoya. C. F. Bedoya April 9th, LS1 projects: * Theta TRB: (talk from Fabio). * SC relocation (next slides) Phase 1 Trigger : * L1 TDR finalized.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Preliminary results on DT T0s in beam collisions J. Santaolalla, J. Alcaraz (+ help/suggestions from C. Battilana, C. Fouz)
C. F. Bedoya May 5 th, C. F. BedoyaDT Upgrade – May 5 th, 2015 Phase 2 Technical Proposal is to be finalized for CWR in this CMS Week Next step.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
The CMS LEVEL 1 TRIGGER SYSTEM FUNCTIONALITY and PERFORMANCE
CMS Cathode Strip Chambers Performance with LHC Data Vladimir Palichik JINR, Dubna NEC’2013 Varna, September 10,
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
CMS Drift Tube Chambers: Activities during LS1 & future upgrades Jesús Puerta Pelayo CIEMAT IV CPAN DAYS Sevilla, 20 – 22 Oct 2014 Summary The muon DT.
C. Fernández Bedoya on behalf of DT Upgrade group.
New ROS design + gradual installation New TSC design + gradual installation Bottleneck at increased luminosities Improves maintainability and performance…
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
CMS Trigger Improvements towards Run II
Sector Collector Electronics
ESR for the muon DT Minicrate System
ATLAS Upgrade Program Sarah Demers, US ATLAS Fellow with BNL
Sector Collector Electronics
Upgrade of the Trigger System of CMS Manfred Jeitler for the
SLHC Muon Upgrades and Impact on Trigger
The Ohio State University
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
ATLAS-MUON Trigger hardware developments
CMS muon detectors and muon system performance
Optical data transmission for
CMS November Upgrade Week
for the transition region on behalf of the RPC upgrade group
DT Consolidation Summary
DT & RPC Grounding STATUS
ESR for the muon DT Minicrate System
eXtremely Fast Tracker; An Overview
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
ATLAS-CMS SLHC Workshop This talk is available on:
Regional Cal. Trigger Milestone: Production & Testing Complete
Project Presentations August 5th, 2004
Status of DT Local Trigger Commissioning
Presentation transcript:

DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1

The DT plan for the future started in 2009 It covers from 2013 up to LS3 Physics target: warrant the same excellent performance while LHC “grows” up LS is the first step of a long-term strategy Improve robustness and longevity Improve flexibility to adapt to new conditions and to exploit new possibilites »In particular for the TRIGGER 6/26/12 Muon IB2 Learn from Today’s system: what & why improve

Nowadays: System overview 6/26/12 Muon IB3 Sector collector TRBs

6/26/12 Muon IB4 Studies with single-hits show that the tubes can stand the LHC environment

Aging of Minicrate electronics 6/26/12 Muon IB5 On-chamber Minicrates contain TDCs and trigger ASICs. BTIs date back to mid 1990s. Boards have been tested for at-least 10 years of LHC at 10^34 Hz/cm2. BTIM of Trigger Boards contain 4 BTI dies: bonds are sensitive to thermal stress during switch on/off. Current stock of spares is a potential issue. Conclusion: Minicrates can survive until LS3 provided we reinforce our stock of BTIMs

DTTF *BTIM functionality ported to rad-hard FPGA and new THETA TRB being produced. These will replace the old THETA TRBs in MB1 and MB2 of the external wheels (+2,-2) * Cannibalize retrieved BTIM for reparation of PHI TRBs C. F. Bedoya May 22nd, Trigger in the theta view BTIM technology obsolete=> migrate to FPGA 6/26/12 Muon IB6

Minicrates in LS3 The electronics will be 30 years old It has been designed for using HDL and the functionality can be transported to New more performing technologies –See theta TRB replacement as an example However, the connections of Minicrates and the other system boxes constitute a bottleneck of the system: change to optical fibers as much as possible 6/26/12 Muon IB7

Sector Collector limitations In particular, the flow of Minicrate data goes through the Sector Collectors (one per wheel) in the detector towers and this is a limit to the connectivity of the minicrates and constitute potential single failure points, given the limited access to UXC Move the SC to USC: connect all Minicrates to USC with optical fibers 6/26/12 Muon IB8

System overview after LS1 6/26/12 Muon IB9 New TSC ? UXC USC Sector collector DTTF

New opportunities with all chamber trigger data in USC The optical fibers from the Minicrates can be split and offer input for running a new system in parallel to the current. At trigger level can test new algorithms exploiting single chamber (or even single Super-Layer) triggers in the difficult regions Can study new algorithms to improve redundancy with RPC (also available on fibers in USC). DT/RPC coincidence at station level can improve the BX ID in situations of high PU 6/26/12 Muon IB10

Trigger Track finding limitations The track finding algorithm requires trigger segments from at least 2 chambers along a muon track This is a problem at eta +0.25,-0.25, i.e. in the cracks between wheel 0 and wheel +1,-1 6/26/12 Muon IB11

Inefficiency btwn YB0 andYB+1,-1 6/26/12 Muon IB12

6/26/12 Muon IB13 another crack: The overlap region Perchaps coincidence of signals from single DT, CSC, RPC chambers can be exploited for improving the efficiency in difficult regions Trigger logics memo: CSCTF >= 3 CSC DTTF >= 2 DTs RPC 3of4 or 4of6 RPC Overlap DT&CSC, RPC not used

Muon Pt assignment in trigger 6/26/12 Muon IB14 LV1 HLT: Full TDC data; Standalone muon system;limited by multiple scattering HLT: tracker + mu ID will allow trigger thresholds =< 20 GeV

6/26/12 Muon IB15 DTTF Xsec (μb) DTTF η<0.8 DTTF η< (Courtesy of C. Battilana (CIEMAT) )

LV1 Track finder with Muon + tracker extract selected tracker information and combine it with the muon system in order to produce a muon trigger at Level-1 6/26/12 Muon IB16 after SC relocation, some PIXEL information (outer layer preferentially) could already be used, if available, in 2017 Keep independence of the new tracker design. Define Region-of-Interest

R.o.I. for muon track Different possibilities: –The RoI can be defined by the muon system at a pre- Lv1 stage so that the load of data transfer from the tracker is reduced. This probably needs a new fast detector underneath MB1 stations with very rough (10-25 cm) position determination (MTT (CMS IN- 2007/058), Y.Erdogan’s talk at this morning’s DT upgrade session,) –The RoI can be defined at the Regional Level, using the DT trigger primitives to search the full tracker data (P.L.Zotto, DT part in upgrade Technical Proposal) –The RoI can be defined by the tracker searching in the muon primitives a matching segment to a tracker stub (with tracker pt above threshold) 6/26/12 Muon IB17

DT ugrade strategy in short 6/26/12 Muon IB18 PHASE 1 LS1 ( ) Replacement of theta TRB (Trigger boards) : new TRBs use FPGAs; recuperate BTIMs as spares for R-phi TRBs * Relocation of Sector Collector from the cavern (UXC) to the counting room (USC): optical fibers to bring TDC data and trigger primitives from all chambers in USC PHASE 1 following steps (not strictly related to LHC shutdowns) ( ): Exploit optical fibers bringing all chamber (trigger) data in USC for running also a concurrent system for track finding (may also use RPC, pixel?, …) * Replacement of DTTF (DT Track Finder) * Redesign of the TSC boards (Sector Collector trigger) * Redesign of the ROS boards (Sector Collector read-out) PHASE 2 (LS3) (2018 and beyond) * Insert connection with the tracker in the Level-1 trigger system (RoI) * Replacement of Minicrate electronics??

Conclusions 6/26/12 Muon IB19 …possibly….