SHMS SUBASSEMBLY BREAKDOWN AMSEC LLC 10/27/2010. Key Plan 20 30 40 60 50 10 717273 81828384 8586 CG (TYP) 90 (dotted line)

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Structural Steel Construction
Let’s make engineering more easy
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
STEEL CUTTING CHARGES ACTION: Calculate and place steel cutting charges. CONDITONS: Given a 2 hour block of instruction, students handout, FM ,
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
Heavy Concrete Construction Formwork
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Isometric and Oblique Pictorials
Structural Collapse Technician Training
CTC 422 Design of Steel Structures
Structural drawing Instructor: M.Yaqub
Chapter 19 Floors.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Chapter 10 Web splice.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
Greenfaulds High School Higher: Graphic Communication Sectioned Assembly.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
1. PURPOSE This procedure gives the essential requirements for proper equipment preparation and packaging. materials and supplies to insure delivery in.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Structural Drafting Connection Details and Gages.
Fundamentals of Structural Detailing
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
HOW TO BUILD YOUR OWN BED 2008 Heavy Duty Truck Rally HDT Rally. October Hutchinson, KS.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
The analysis runs in the following slides are based on a W8 x 58.0 wide beam with dimensions shown bellow.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Team 1 Autumn Murphy, Zach Anderson, Shane Miller 1.Define a 3 cable system to lift truck. 2. Must lift from two corners and the opposite midpoint. 1.
Structural Drafting Assembly Clearance Dimensions.
Line of sight is an imaginary ray of light between an observer’s eye and an object. Line of sight Parallel projection Line of sight Perspective projection.
Forklift pick set-up interfacing with a MCHP
The Hyatt Regency Walkway Collapse Presented By: Jonathan Foster 4/9/02.
Unit 3 Storage This unit is designed to give you an introduction to the concept of storage as it relates to the logistical handling of materials. Well-planned.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
Roller/rail - System for PANDA
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Updated Design of Detector Hall
SBN Far Detector Installation & Integration
SECTIONAL VIEWS.
Shear in Straight Members Shear Formula Shear Stresses in Beams
Introduction Used for covering spaces in the form of roof or floor
SiD Muon Yoke Structure - Deformation Studies -
Update of experimental hall in Japanese mountain site
Detector hall in mountain regions
Forms for Concrete Footings
Dump Transport from Dump Hall to XSE (updated Version)
Design of Distribution Feedbox at LHC P7
- BEAM Sinusoidal Web Beam
Hall C Down Stream Beam Pipe And Dump Interface Design
These are only the basic instructions to build the stand.
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
COLUMNS SLIDE SHOW.
Additional Upstream Coil Shielding
Floor Truss Ribbon Board Load Path
Minimizer Confidential
Chapter Objectives Determine shear stress in a prismatic beam
Neutron guide Shielding Concept
Assembly drawings Flóra Hajdu B406
Presentation transcript:

SHMS SUBASSEMBLY BREAKDOWN AMSEC LLC 10/27/2010

Key Plan CG (TYP) 90 (dotted line)

Summary of Subassemblies Transport Into Hall C Subass'y IDDescriptionEst. Weight (ton) 1 Trailer 2 Dolly 10 Bearing Housing8.0X 20 Half of Box Beam -- Bearing End26.5X 30 Half of Box Beam -- Bogey End27.3X 40 Shield Hut Deck -- Opposite Dipole13X 50 Shield Hut Deck -- Center Section4.2X 60 Shield Hut Deck -- Dipole Side17.2X 70 (71-73) Cantilever Platforms (3)2.5X 80 (81-86) Shield Hut Deck Supports (6)3.4X 90 Misc. (Shield Wall above Box Beam)1.0X ALL SHMS Support Structure Trailer can be either a 40” high single dropdeck or 60” high standard flatbed. Bed must have flat area at least 34’ long. 2 Dolly is assumed to be TDM-200 Special from Lockwood Bros. and is shown on the next slide.

Transport Dolly The dolly is based on information provided by Lockwood Bros. This dolly is the TDM- 200 Special with a 100 ton capacity. For exact dimensioning, Lockwood Bros. will need to be contacted. Special shoe (hatched area) to be fabricated for the dolly. This is not provided with the dolly and must be included with unit fabrication.

SUBASSEMBLY 10

Subassembly 10 Description Weight: 8.0 tons 7’ 3” wide 7’ long 51” tall

Subassembly 10 Reverse Isometric

Subassembly 10 7’-0” 7’-3” 4’-3” All dimensions are approximations and are subject to small change due to thickness shift and detail design preferences. 3’-6” 3’-11” 2’-3”

Subassembly 10 in Tunnel 6” pallet 10 Hall C Tunnel Drop-deck trailer

SUBASSEMBLY 20

Subassembly 20 Description 29’ 2” overall length 12’ 2” wide 8’ 4” tall Weight: 26.5 tons

Subassembly 20 Reverse Isometric

Subassembly 20 C.G. Location All dimensions are approximations and are subject to small change due to thickness shift and detail design preferences. 29’-2” 12’-2” 8’-4” 14’-2”6’-6” 5’-2”

3” overhangs IWO platforms 10” clearance tons Dollies in Shoes Bolting PL chock 170” 180” Hall C Entrance (on its side) Subassembly 20 in Tunnel

SUBASSEMBLY 30

Subassembly 30 Description 31’ 8” overall length 12’ 2” wide 8’ 9” tall Weight: 27.3 tons

Subassembly 30 Reverse Isometric

Subassembly 30 C.G. Location All dimensions are approximations and are subject to small change due to thickness shift and detail design preferences. 31’-8” 12’-2” 8’-9” 4’-9” 6’-3” 14’-8”

3” overhang IWO platform 13” clearance tons Dollies in Shoes 176” 204” Hall C Entrance (on its side) Subassembly 30 in Tunnel

SUBASSEMBLY 40

Subassembly 40 Description 28’ 8” overall length 60” tall Weight: 13 tons 13’ wide

Subassembly 40 Reverse Isometric

Subassembly 40 C.G. Location All dimensions are approximations and are subject to small change due to thickness shift and detail design preferences. 28’-8” 13’-0” 5’-0” 15’-0” 1’-11” 7’-4”

reduce 24” overhang to increase clearance 5” clearance tons Dollies in Shoes 180” Hall C Entrance (on its side) 164” Subassembly 40 in Tunnel

SUBASSEMBLY 50

Subassembly 50 Description 60” tall 20’ 1” overall length Weight: 4.2 tons 9’ 3” wide

Subassembly 50 Reverse Isometric

Subassembly 50 C.G. Location All dimensions are approximations and are subject to small change due to thickness shift and detail design preferences. 20’-1” 9’-3” 5’-0” 11’-4” 1’-11” 3’-6”

SUBASSEMBLY 60

Subassembly 60 Description 68” tall 11’ wide 33’ 2” overall length 17.2 tons

Subassembly 60 Reverse Isometric

Subassembly 60 C.G. Location All dimensions are approximations and are subject to small change due to thickness shift and detail design preferences. 33’-2” 11’-0” 3’-2” 4’-6” 18’-6” 5’-8”

Subassembly 60 in Tunnel 13 tons 9” wood cribbing 60 Hall C Tunnel Drop-deck trailer 5.5” clearance

SUBASSEMBLY 70

Subassembly 70 Description Platform webs all 20” deep 10’ long 4’ long 7’ 6” long 6’ wide (0.9 tons) (1.2 tons) (0.4 tons)

Subassembly 70 Reverse Isometric

SUBASSEMBLY 80

Subassembly 80 Description (0.6 ton) (0.3 ton ea.) (0.8 ton) (0.5 ton) (1.0 ton) 13’ wide (max) 6’ tall (TYP)

Subassembly 84 (others similar)

SUBASSEMBLY 90

Subassembly 90 Description Weight: 1.0 ton (assemble flat plates in Hall C) 12’ 6” 9’ 2” 8’

Subassembly 90 shown in place Install after subassemblies 40 and 60, align with their flanges Subassembly 30 would be too wide for Hall C tunnel if subassembly 90 were attached.