1 Nov. 9, 2015 CSTS Forward Frame Service Work Plan T. Pham Nov. 9, 2015.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Creating a Schedule Using Network Diagrams; Defining Task Durations
Global Congress Global Leadership Vision for Project Management.
Requirements Specification and Management
1 Review Notes concerning Review Notes concerning Forward Frame Service & Process Data Operation/Procedure
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Lecture # 2 : Process Models
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
Cross Support Transfer Services – Forward Frames Service 10 – 15 November 2014 London, United Kingdom John Pietras Global Science and Technology, Inc,
CAP 252 Lecture Topic: Requirement Analysis Class Exercise: Use Cases.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Requirements Analysis Concepts & Principles
Organizational Influences and Life Cycle
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
1 Public Entities Risk Management Forum Office of the Accountant General National Treasury Project Risk Management Jeets Hargovan Government Technical.
Gregor v. Bochmann, University of Ottawa Based on Powerpoint slides by Gunter Mussbacher (2009) with material from: IEEE Standard, Daniel Amyot.
Developing Enterprise Architecture
Project Management: Madness or Mayhem
1 Lecture 5.3: SEF Ch 4 Requirements Analysis Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved..
05 December, 2002HDF & HDF-EOS Workshop VI1 SEEDS Standards Process Richard Ullman SEEDS Standards Formulation Team Lead
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
Conquering Complex and Changing Systems Object-Oriented Software Engineering Art for Chapter 11, Project Management.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
SEMINAR ON :. ORGANISATION Organizations are formal social units devoted to attainment of specific goals. Organizations use certain resources to produce.
1 REQUIREMENT ENGINEERING Chapter 7. 2 REQUIREMENT ENGINEERING Definition Establishing what the customer requires from a software system. OR It helps.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
The Challenge of IT-Business Alignment
Chapter 2 소프트웨어공학 Software Engineering 임현승 강원대학교
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
Role-Based Guide to the RUP Architect. 2 Mission of an Architect A software architect leads and coordinates technical activities and artifacts throughout.
SacProNet An Overview of Project Management Techniques.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
Cross Support Services Area Cross Support Transfer Services Working Group Strawman Forward Frame CSTS Specification Technical Note (June 2010) John Pietras.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
CCSDS P1A/B Meeting - Frascati - Nov 8, Gilles Moury, Guy Lesthievent - 1 Proposal to P1A & P1B Increasing allowed frame lengths and interleaving.
Requirements as Usecases Capturing the REQUIREMENT ANALYSIS DESIGN IMPLEMENTATION TEST.
Overview of Functional Resources for IOAG Service Catalog Services 15 April 2013 Bordeaux, France John Pietras Global Science and Technology, Inc., Greenbelt,
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
PMI-Planning Process Group Lecture 08 Ms Saba Sahar.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Lead from the front Texas Nodal 1 EDW Update to TPTF November 5, 2007 Janet Ply EIS Nodal EDW Project Manager.
Software Requirements Specification Document (SRS)
State of Georgia Release Management Training
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
SOFTWARE PROJECT MANAGEMENT
Standard Service Configurations 31 March – 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.
LCG Persistency Framework Project Boundary Conditions and Overall Schedule Torre Wenaus, BNL/CERN.
Fall Meeting, November 11, 2015 Paul Pechkam, JPL/NASA
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Standard Design Process Overview
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Daniel Amyot, University of Ottawa Based on slides by Gunter Mussbacher (2009) and Stéphane Somé (2008) with material from these standards: IEEE ,
Global Science and Technology, Inc., Greenbelt, MD, USA
Presentation transcript:

1 Nov. 9, 2015 CSTS Forward Frame Service Work Plan T. Pham Nov. 9, 2015

2 Agenda General approach High-level schedule (draft) Technical discussion Key changes since 2011 draft Relationship to FCLTU specification Frame type among service instances It’s my first formal assignment on CCSDS, especially on the development of a specification. Will definitely need, and appreciate, much of your help and guidance!!!

3 Nov. 9, 2015 Approach Build up essential knowledge on the overall framework CSTS SFW (921x1r2) Also CSTS Guidelines and Functional Resources Familiarize with similar relevant documents Forward CLTU (912x1b3) and Enhanced forward CLTU (912x11o1) CSTS-MD (922x1r1_4) and CSTS-TD (922.2-w0.11) Leverage on John’s earlier 2011 writeup CSTS Forward Frame Service Strawman Specification Plan of actions Focus on the first few general sections - Make necessary changes to sync up any changes in general operation concept since Serve as 1 st installment of updates Learn more on the detailed information re: procedures for later sections - Make necessary changes to sync up with the latest SFW and examples of MD and TD specifications - Serve as second and third installment of updates CSTS Framing & Multiplex Service User A Coding & Sync A1, A2,… (AOS) C1, C2,… (TC) B1, B2,… Service User B Service User C RF Mod Spacecraft

4 Nov. 9, 2015 Work Products Develop the specifications for the CSTS Forward Frames Service Near-term: Red Book Longer term: Blue Book, after validation via prototype effort Interface with prototyping team for validation of specifications Facilitate information flow into prototype development Extract lessons learned and changes needed to the specifications

5 Nov. 9, 2015 FY15, Q4FY16, Q1FY16, Q2FY16, Q3FY16, Q4FY17, Q1FY17, Q2FY17, Q3FY17, Q4FY18, Q1FY18, Q2FY18, Q3FY18, Q4FY19, Q1FY19, Q2FY19, Q3 Research; Formulate work plan Work on 1st draft Internal team review, 1st draft Revise & Work on 2nd draft Internal team review 2nd draft Revise & Work on 3rd draft External review Redbook Formalize Redbook Prototype effort Develop Blue Book Review BlueBook Formalize BlueBook **Draft** Work Plan Planning estimates are based on comparative analysis with previous CCSDS work, e.g. Delta-DOR Dependencies: Obtained support from collaborators on technical inputs and writing John Pietras, Wolfgang Hell, Holger Dreihahn - Commitment? Committed implementation prototype to validate the information prior to formalizing the blue book ESA/NASA - Commitment? Red Book ready Blue Book ready Q. Realistic schedule?

6 Nov. 9, 2015 TOC of 2011 FF Strawman Spec Q. Key areas require change? - Mismatches over time - Applying SFW to achieve various use cases envisioned

7 Nov. 9, 2015 Clarification on FCLTU CSTS-FF covers the functionality of FCLTU? Current FCLTU specifications to be retired post missions transition out of using it? BCH encoding typically done by mission users. Allow for bypass option? Impact with mixed use? Figure 1 Figure 2

8 Nov. 9, 2015 Clarification on frame type Current draft: Constraint on all F-Frame services instances associated with the same physical channel carry the same type of SL-PDU (TC frame, AOS frame, or AOS CADU) In Fig. 1, are all SL-PDUs into the MUX of - Same type (e.g., all instances in AOS)? - Mixture across multiple service instances (one service instance in AOS, another in TC)? - Mixture within one service instance (single service instance supports AOS/TC/CADU? Figure 1 Figure 2

9 Nov. 9, 2015 Clarification on frame type Current draft: Constraint on all F-Frame services instances associated with the same physical channel carry the same type of SL-PDU (TC frame, AOS frame, or AOS CADU) In Fig. 1, are all SL-PDUs into the MUX of - Same type (e.g., all instances in AOS)? - Mixture across multiple service instances (one service instance in AOS, another in TC)? - Mixture within one service instance (single service instance supports AOS/TC/CADU? If same type of SL-PDU is required, - Over constraint on users’ operations? - Implication to realize the scheme in Fig. 2? Figure 1 Figure 2

10 Nov. 9, 2015 Clarification on frame type Current draft: Constraint on all F-Frame services instances associated with the same physical channel carry the same type of SL-PDU (TC frame, AOS frame, or AOS CADU) In Fig. 1, are all SL-PDUs into the MUX of - Same type (e.g., all instances in AOS)? - Mixture across multiple service instances (one service instance in AOS, another in TC)? - Mixture within one service instance (single service instance supports AOS/TC/CADU? If same type of SL-PDU is required, - Over constraint on users’ operations? - Implication to realize the scheme in Fig. 2? If multi type of SL-PDU allowed, upper and lower path in Fig. 1 would be simultaneously active - Effect on idle frame generation in the async and sync paths (e.g., difficulty with definition of service instance duration)? - Additional service configuration parameters needed for defining multi-type SL-PDU? Figure 1 Figure 2