Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
K. Foraz on behalf of OSS members
EYETS Works EN-EL [ FC excluded ]
SMACC Tenth report [15 min] 13/09/2013
ELENA installation and commissioning status
Status of LHC installation & New Installation Schedule
LHC-RF activities in LHC PT 4 TS2 YETS LS2
K. Foraz on behalf of OSS members
AD consolidation activities in LS2
on behalf of the RF group
Update of cryogenic activities
The LHC - Status Is COLD Is almost fully commissioned
FCC Tunnel and Shaft Cross Sections
Installations, modifications, consolidation in 2005:
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
EN-CV interventions during EYETS for PS and PSB
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
ACS news Circulator TCU: control tests in progress All cavity racks
Experimental Areas – LS2 planning
SPS Planning meeting for LS2 #26 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1

AD Removal of all the unused power supplies done Stochastic cooling amplifiers reconnected Vacuum work on UHM3107 and UVM3207 tanks delayed (tooling not ready) and postponed until week 33. Major ion pump change started More tests requested by vacuum on MTV screens (degasing issues) Girder line 7000: manufacturing drawings in progress. The 4 old magnets are removed BHN06: Waiting for other news from manufacturer 01/08/2013LSC - K. Foraz2 Girder line 7000 Stochastic cooling

LEIR Cabling campaign completed Optical fibbers installed Access system in progress Removal of ER.DHV12 magnet in progress General cleaning of LEIR area started, in collaboration with TSO. Future bake-out (sectors 1, 2 and 5): updated procedure was circulated. Most of activities on kickers were postponed 01/08/2013LSC - K. Foraz3 ER.DHV12 removal

PS Done – New crane PR275 has been commissioned In Progress – CV Consolidation program Some delay in the cabling part which will start next week – Septum 16 External Shielding - No work in August – Safety and Access System Installation is on progress EL campaign delayed PSB cabling campaign in PS (BTP transfer line) – Stopped by RP (dose higher than foreseen) – ALARA1  ALARA2, work will restart on Monday 01/08/2013LSC - K. Foraz4 New crane commissioned Ventilation installation Access system – new door BTP line cabling campaign

PSB In progress – On site preparations for the beam dump replacement project on schedule. New beam dump core delivered to CERN and is under preparation. Dismantlement of the BTM/BTY beam lines now complete. Final zone cleaning in preparation. EN-STI Successfully Injected foam to aid the cutting of the old beam pipe. Start of the beam dump removal procedure currently programmed Wednesday 07 th August. No general access to the PSB Machine during this period. – CV consolidation and maintenance of CV, kickers, Septa, vacuum beam instrumentation, Magnet and Beam stopper – AS45 lift replacement final commissioning 16 th Sept. Forecast – Replacement of all PSB ring 32A power sockets which are not protected by a differential – Integration testing of the new PPS (access) system Installation of the public address cables & infrastructure. – Replacement of the BI.SMH under preparation. Exchange work programed mid October. 01/08/2013LSC - K. Foraz5

SPS EL cabling works in progress – BA3 finished this week The preparation of LSS1 for the irradiated cable campaign is in progress: – 3 rd dump has been removed from LSS1+ and stored in ECX5 – Still on target to have the area clear for the beginning of September LSS % of orphan cables !! – (list from Wednesday in Indico – please check) Transformers – 4/8 in place in BA3 All other works progressing on schedule. 01/08/2013LSC - K. Foraz6

LHC - P1  P2 R2E – Pt1: – Left: demineralized water pipe installation finishing today. Chilled water pipe installation will follow – Right: Demineralized water pipe starting from next week LSS1: – PM15 lift broke down (generator) – back in service – Thermoswitch installation on DFBs finished – Cabling campaign is finished – Upgrade of collimator control system started – DQR-DQS upgrade in progress – Survey HLS maintenance in progress – DFBX -consolidation of current leads in progress Arc 12: – Exchange of cryo-magnets in progress ~65% 01/08/2013LSC - K. Foraz7 Demineralized water pipes – UJ14

LHC - P2  P3 Point 2 – Cabling finished – connectors in progress – Cooling tower maintenance in progress – Cryogenic maintenance in progress – DQR-DQS upgrade in progress Arc 23 – Cryogenics consolidation in progress – Magnet replacement in progress ~55% – W opening in progress ~41% LSS3 – Optical fibers work almost finished – From next week vacuum activities (B5L3, B5R3), new cable trays, walkway… 01/08/2013LSC - K. Foraz8 Next Friday AUG P2 No access from mid arc 12 to mid arc 23 Walkway in LSS – ICL review next week

LHC - P3  P5 Arc 34 – QRL leak test in progress – compensator removal from Aug. 7 th (not as easy as the others…near Q6R3) – Magnet replacement in progress ~25% – Vacuum consolidation activities in progress LSS4 & P4 – Cabling in progress (Flexwell pulled in UX) – Water cooled cables consolidation in progress – ADT RF plant maintenance and upgrade – Cryogenic maintenance Arc 45 – Magnet replacement in progress ~25% – QRL Xrays in progress 01/08/2013LSC - K. Foraz9 Cryogenic maintenance Flowmeter replacement

LHC – P5  P6 LSS5 &P5: – HRL consolidation almost finished R2E – P5 – Drilling: 5 ducts (UJ56-tunnel) being drilled – Installation of the safe-room structure in progress – Chilled water pipes installation from next week Arc 56 – QRL compensator removed under analysis – SMACC DFBA in progress – some big delays announced to be analyzed – Xrays tonight M weld in progress (~45%) Vacuum leak test in progress LSS6 & P6 – MKD-MKB tests on going – Cryogenic maintenance 01/08/2013LSC - K. Foraz10 DFBAJ – clamp installation Additionnal valves on HRL

LHC – P6  P7 Arc 67 – SMACC in progress Resolder BB ~68% Shunt ~55% – DFBA consolidation – Vacuum insulation consolidation in progress R2E – P7: – TZ76 – vault painted – Installation of cable trays in progress – Smoke detector in RR being installed LSS7&P7 – Vacuum activities in progress: A6L7 (TCP), A5L7 (NC), IP7 (NC), A5R7 (NC), B5R7 (NC) – 13kA & 600A upgrade in progress 01/08/2013LSC - K. Foraz11

LHC - P7  P1 Arc 78 – SMACC M cut ~85% Desolder BB just started DFBA consolidation in progress LSS8 &P8 – DQR-DQS upgrade finished 01/08/2013LSC - K. Foraz12 Arc 81 -SMACC -DFBA consolidation in progress -W opening finished -DN200 installation finished -Cryo module consolidation in progress

General infrastructures The possibility of deploying Wi-Fi access points at each LHC pits (PAD – MAD on surface) is under study. A slight slowdown in the project of technical network renewal (due to vacation period) but still quite ahead of the schedule. Demineralised water production – work is finished !! 400kV & 66kV maintenance and consolidation – CERN ends end of July – But auto-transfer test postponed to end of August 01/08/2013LSC - K. Foraz13 Courtesy F. Chapron

Overall progress Injectors: on schedule, but to follow – CV cabling for PS ventilation – AD – BHN06 coil manufacturing LHC on schedule – R2E - On schedule – SMACC – to follow “OK for M line” welding DFBA schedule – Support from vacuum on surface – under analysis – overloaded !! General infrastructures: good progress Impact of summer holidays will be assessed in September (we can “feel” it already) Reminder - IPE 01/08/2013LSC - K. Foraz14