18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Solid Waste.  Where Does our trash go? Make a box and draw an image.
May, 2004S. Irish/542 FEMCI Poster Development of Cryogenic Accelerometers for 4K Principal Investigators: Petar Arsenovic/551, S. Irish/542, Brian Ross/549.
Is it possible to transfer heat to a substance and it not increase in temperature? Yes, during a phase change.
MICE Beam Monitors - STATUS MICO Meeting January 9, 2008 Alan Bross.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
Dust Accelerator: Review of Plan 3 MeV dust accelerator Particle sizes: 0.2 – 2.5  m Particle velocities: < 100 km/s Large test chamber UV sources Solar.
1 MOSFIRE is a Multi-Object Spectrometer for the Near Infra-Red (wavelengths ~ μm) We are deep in the component fabrication and procurement phase.
MMT AO run Jan Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
Integration and Test 14 October 2008 Martin Nordby.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
CHARA Collaboration Year-Five Science Review News from the CHARA-Array Beam Combination Lab Judit Sturmann.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
TSIP (Telescope System Instrumentation Program) proposal February, 2005 Carnegie submission, on behalf of Magellan Consortium: “A Second, More Sensitive.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Magellan technical updates, Pasadena April 2006 – September 2006.
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
FourStar Status Eric Persson (OCIW) Presented By.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Developments of the FETS Ion Source Scott Lawrie.
DES Review CCD Focal Plane and Camera Roger Smith George Ricker.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Readout principle Time Drift direction E drift Continuously sensitive Self-triggering Equiv. input charge due to noise:
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
BIMA Antenna Reconstruction. AntennaFarm.V3 antenna assembly lift pedestal onto base (CRANE) lift dish onto pedestal (CRANE) reinstall ladder (FORKLIFT)
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Take out notebook, folder, pencil box.
2K CB FDR Conclusion:  Project Summary, Procurement Plan / Status
Pressure Piping Analysis
FourStar 4K x 4K JHK imager
HPGe Planar Detector Stack
P10452 Dresser Rand Compressor Installation and Utilization
Type 2 Supercrystal Type 1 Supercrystal
Schematic to Pictorial
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Schematic to Pictorial
DEMO 3 We will model an occluded front in the final demo. An occluded front occurs when a FAST moving cold front catches a SLOWER warm front. In other.
Mechanical Engineering progress for the Front End Test Stand
Instrument Overview Larry Springer HMI Program Manager
CETAL PW September 2016.
Where’s the pencil?.
Presentation transcript:

18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto

18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress 11 e2v CCD44-82 detectors received (10 science, 1 engineering) Test dewar (MIKE red) finished Test electronics finished (saddlebag + preamp plate) Cryotiger cold heads received Cryotiger compressors on order, hoses to be ordered

18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Building solid model of dewar Redesign focus mechanism, front plate, dewar body, CCD plate, and G10 spaceframe Drawings released to shop include backplate, A-frame, focus flexure and counterweight, 3 sideplates, cooler housing and hardware, CCD electronics box

18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress RFQ issued for PI components Investigating installation of ion pump