Safety Interlocks Group Front End Equipment Protection System Currently there are 55 FEEPS Systems in Service –This consists of: 43 Version 1 system 4.

Slides:



Advertisements
Similar presentations
ModCon® 75 Controller.
Advertisements

CLS Machine Status Displays System Analyst - Controls Canadian Light Source Inc. web: Perimeter.
FireClass FC501. What’s FC501 ? An entry level Triple Circuit Single Loop addressable system featuring Intelli-Zone mapping An “out of the box” panel.
Labview-based User Interface for Beamline Equipment Protection System at the Advanced Light Source Hanjing Huang Bob Gunion Ken Woolfe Lawrence Berkeley.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
The Evolution of the APS Beamline Personnel Safety System (PSS) Work supported by U.S. Department of Energy, Office of Science, Office of Basic Energy.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
ION CHAMBER INTRODUCTION TRANSITION - HANDOFF FROM EESIC SESSION 1 21 SLIDES TOTAL OCT
Bubble Chamber Planning Meeting 04 September
The Personnel Safety System (PSS) monitors the state of variables relevant to personnel safety (e.g. station door status, shutter status, water flow to.
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
SSRF Beamline Control System
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
FACET Exp Area Christine Clarke 3 rd October 2013.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Steve Lewis Controls: Vacuum 5 April, 2005 UCRL-PRES LCLS Week 5 April, 2005 Steve Lewis Vacuum Standards.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Friday April 7, 2006 J. Anderson Jr. Page 1 ES&H Safety System Upgrades  Data Acquisition System 95% Complete 16 of 17 Linux Ethernet Port Replicator.
First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland G. Y. Hsiung -1 The Vacuum Interlock System for.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
1 © Red Lion Controls Inc. Graphite HMI Series Graphite Series.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
LEDA Vacuum Interlocks Bob Dalesio. Outline Leda vacuum system – displays and interfaces PLC Interlocks as presented to the operator EPICS interlock to.
Report Technical Director Storage-Ring-Installation Completed
SESAME Control System Status
LASER SAFETY External EHS Expert Panel Workshop
LEDA Vacuum Interlocks
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
The Multi Series DL2-Multi
PLC-based control systems at SOLEIL - ICALEPCS 2017
352MHz Klystron Control for the 3MeV Linac test stand
Operational Experience - Field Emission
Control systems plans & activities for HL-LHC during LS2
Photon beamline crates
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
JINR NICA beam transfer channels CS
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
UITF MPS system requirements
TTC Hot Topic Common Questions
RF Local Protection System
Personnel Safety Systems
Ion Source and LEBT control system topology, Interlock strategy
KAGRA PLC System Overview
DOE Review 11 May 2005 Stephen A. Lewis
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
Rack installation and local tests for the MEBT Chopper Rack
DOE Review 11 May 2005 Stephen A. Lewis
Presentation transcript:

Safety Interlocks Group Front End Equipment Protection System Currently there are 55 FEEPS Systems in Service –This consists of: 43 Version 1 system 4 Version 2 systems (16ID, 16BM, 22ID, 22BM) 3 Version 2.5 systems (23ID, 24ID & 31ID) 5 Version 3.0 systems (11BM, 21ID, 23BM, 26ID & 30ID)

Safety Interlocks Group Front End Equipment Protection System Version Differences Version 1 Systems: –Local control panel, for controls –Love Controllers, for DIW interlocks –Single Ion Pump interlocks Version 2.0 Systems: –Panel view touch screen, for controls –Analog module for DIW interlocks –Single Ion Pump interlocks Version 2.5 Systems: –Panel view touch screen, for control –Analog module for DIW interlocks –All adjacent Ion Pump’s interlocked Version 3.0 Systems: –EPICS control –Analog module for DIW interlocks –All adjacent Ion Pump’s interlocked –Remote Fast Valve Control –Remote Reset of Vat Chassis –Fault & Warning stack added to Epics –Fault Paging System incorporated

Safety Interlocks Group Front End Equipment Protection System Version 1 Vacuum Controls Zones Beamline VacuumFront-End VacuumStorage Ring Vacuum IP 2 IP 3 IP 4IP 5IP 6 IP 7 IP 8 BL Vac. Pump. FM 1FM 2FM 3BPM 1BPM 2 PS 1SVFVPS 2SS 1SS 2FEV BeWin IP 1 Beam Direction BIV

Safety Interlocks Group Front End Equipment Protection System Version 2.5 & 3.0 Vacuum Controls Zones Beamline Vacuum Front-End Vacuum Storage Ring Vacuum IP 2 IP 3 IP 4IP 5IP 6 IP 7 IP 8 BL Vac. Pump. FM 1FM 2FM 3BPM 1BPM 2 PS 1SVFVPS 2SS 1SS 2FEV BeWin IP 1 Beam Direction BIV

Safety Interlocks Group Front End Equipment Protection System Old Operator EPICS Displays

Safety Interlocks Group Front End Equipment Protection System New Operator EPICS Displays

Safety Interlocks Group Front End Equipment Protection System New Engineering EPICS Display

Safety Interlocks Group Front End Equipment Protection System Upcoming Changes –Upgrade Version 2.5 systems to 3.0 (23ID, 24ID & 31ID) –Version 1 Round 1 -- DIW Upgrade -- (Starting with BM’s) Remove Love Controllers & install Analog Modules Install new Version of Code Upgrade Epics controls –Version 1 Round 2 -- Vacuum Upgrade – Add all ion pumps into the interlocks Standardize all I/O Add additional Vat controls