Opto temperature experience in the Pixel detector C. Gemme IBL meeting, 17 March 2009.

Slides:



Advertisements
Similar presentations
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Advertisements

The ATLAS Pixel Detector - Introduction -
Clouds and the Earth’s Radiant Energy System NASA Langley Research Center / Atmospheric Sciences Methodology to compare GERB- CERES filtered radiances.
1 Vertically Integrated Seismic Analysis Stuart Russell Computer Science Division, UC Berkeley Nimar Arora, Erik Sudderth, Nick Hay.
WH  bb and WH  uu Studies Monica Dunford FTK Monthly Meeting March 13 th, 2007.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
DCP Meeting – September 12 th 2010 WP1/4: Leak Search & Repair- Paolo Petagna 1/9 PH-DT - WP1: REMOTE LEAK REPAIR- Update Report on status of leak analysis/quantification.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
A.Murari 1 (24) Frascati 27 th March 2012 Residual Analysis for the qualification of Equilibria A.Murari 1, D.Mazon 2, J.Vega 3, P.Gaudio 4, M.Gelfusa.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Optoboards dependence on Temperature C. Gemme, T.Flick detector meeting, April 2 nd 2009 Motivations Test in SR1 thanks to K. Lantzsch, L.Masetti, J.Moss,
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Background Subtraction and Likelihood Method of Analysis: First Attempt Jose Benitez 6/26/2006.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Ciro Bigongiari, Salvatore Mangano Results of the optical properties of sea water with the OB system.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
1 Objective Compare of two matched-paired means using two samples from each population. Hypothesis Tests and Confidence Intervals of two dependent means.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
FADC Time Study EJ, HD 10/09. Purpose: to test Hai Dong’s firmware implementation of Indiana U. timing algorithm NOT meant to be a definitive study of.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
SCT WeekDecember 3, Block of Low Gain Analysis and Solutions A. Ciocio - LBNL.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Connectivity Workshop Conclusions: Lessons learned C12 Test Next future Claudia Gemme, CERN - INFN Genova Connectivity.
MUST HAVE SHOULD HAVE COULD HAVE Module # Bonus. Screen Captures with notes The following set of slides provides the Screen captures of various Feeds.
10 May 2006Paul Dauncey1 ALICE EMCAL Technical Proposal: First Discussion Paul Dauncey, Michel Gonin, Junji Haba.
10 January 2008Neil Collins - University of Birmingham 1 Tau Trigger Performance Neil Collins ATLAS UK Physics Meeting Thursday 10 th January 2008.
Ciro Bigongiari, Salvatore Mangano, Results of the optical properties of sea water with the OB system.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Chi-Cheng Lin, Winona State University CS412 Introduction to Computer Networking & Telecommunication Data Link Layer Part II – Sliding Window Protocols.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
Global Warming Vs Climate Change
In conclusion the intensity level of the CCD is linear up to the saturation limit, but there is a spilling of charges well before the saturation if.
MEGN 537 – Probabilistic Biomechanics Ch.5 – Determining Distributions and Parameters from Observed Data Anthony J Petrella, PhD.
Copyright 2010, The World Bank Group. All Rights Reserved. Producer prices, part 2 Measurement issues Business Statistics and Registers 1.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Detector Control for the Insertable B-Layer Susanne Kersten Wuppertal University ATLAS Upgrade Workshop, February
OD Tuning: SK-IV Roger Wendell TMC Meeting
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Mid Term II Review.
on behalf of ATLAS LAr Endcap Group
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Sampling Distributions and Estimation
Charles F. Maguire Vanderbilt University
Aachen Status Report: CO2 Cooling for the CMS Tracker
Volume 89, Issue 2, Pages (August 2005)
The Stave Thermo-Conductivity QC Procedure Idea
CO2 cooling requirements for the IBL
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
RPC Detector Control System
Lesson Comparing Two Means.
Aachen Status Report: CO2 Cooling for the CMS Tracker
GOES -12 Imager April 4, 2002 GOES-12 Imager - pre-launch info - radiances - products Timothy J. Schmit et al.
Imperial laser system and analysis
Software Testing.
Volume 89, Issue 2, Pages (August 2005)
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
RPC Detector Control System
Analysis Drift velocity of the SDD Detector
Data Literacy Graphing and Statisitics
Fig. 2 Plasma diagnostics with DEM analysis.
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Presentation transcript:

Opto temperature experience in the Pixel detector C. Gemme IBL meeting, 17 March 2009

Pixel Optoboards 272 optoboards arranged on the Service Quarter Panels in groups of 36 per quadrant. Those 36 opto are arranged in six groups of six optoboards each. One cooling loop per quadrant, eight for the detector, each one with independent temperature (pressure) setting. To have more granularity in temperature control, on each quadrant, added six optoheaters, one per each six opto-row to regulate the temperature. Two types of optoboards in terms of produced heat (D and B-boards) A quadrant with 36 optoboards, not visible An optoheater on a six opto-row

Optoboards temperature Operation point in 2008 Opto cooling loops set at 4.15 bara, i.e. 0C Manually Set the optoheater in such a way that all opto have T>20C 20-40% requested power for the optoheaters ~22C average temperature of the optoboards, tails at higher temperatures Opto OFF

Temperature dispersion Operation point in 2008 No way to recover not uniformity in the opto array, in particular when an optoboard is off or has high power (B-boards) See for instance location 3,4 in OSP bottom and top have higher temperature as there the B-boards are located. Old data (May): ISP settings have been raised in Aug-Dec operation.

Temperature Working range Ideally one would like to measure a temperature range in which there are no errors in data transmission for each optoboard and then derive the distribution for the full detector. But How to define the optoboard data transmission efficiency? T Data transmission Efficiency T best  From the distribution of T best and  of the 272 optoboards get the temperature precision that is needed to operate. 1

Temperature Working range The best estimator as data transmission efficiency we have used for each module is related to the Error Free Region (EFR) size and shape in the BOC parameters, i.e. the white region in the upper plot (BOC Delay (x) vs BOC Threshold (y)). But the definition of optoboard data transmission efficiency becomes more complicate: one optoboard might have up to 14 channels to manage the size/shape of the EFR depends on VISET (laser current) that is unique for all the channels the EFR of each channel has to be taken into account as well as the range of acceptable VISET settings, see next slide. WE DO NOT HAVE (yet) such a definition. And then it should be possible to study the dependence on Temperature…

ch0 ch1 ch2 ch3 ch4 ch5 ch6 Viset

Temperature dependence in 2008 Even if no detailed study, we know that: 1.In early August Opto BPR set to 3.5 bar (~-5C ); optoheater setting to 5C. Optoboards temperature ~5-10 C:  Many (ADD A NUMBER!!) problems in operating the detector! 2.BOC Scans vs different temperature settings on part of the detector:  Only 6 PP0s all failing at 10C  Optoheaters settings at ~10C-13C-16C-19C-22C  Analysis on-going…  More tests could be done in SR1 if needed (14 PP0s there)

Not a conclusion… It is complex to define a temperature range of good operation for the optoboards and it has not been done systematically neither during QC or on the final detector. Some indications come indirectly from the commissioning period: 5-10C is too low ~22±3C is good Not tested the high temperature range. Analysis is on-going for temperature dependence studies done in September. More tests could be done in SR1 if needed.