LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of BI-BE group.

Slides:



Advertisements
Similar presentations
Conservation of energy -Energy cannot be created or destroyed-
Advertisements

HIDDEN FACES INVESTIGATION
Initial Results of the ECR Charge Breeder for the 252 Cf Fission Source Project at ATLAS Richard Vondrasek, John Carr, Richard Pardo, Robert Scott.
Permanently Charging the Electroscope By conduction Using a Positively Charged Rod title.
Permanently Charging the Electroscope By conduction Using a Negatively Charged Rod title.
Why Does Sodium Have a Much Higher Second Ionization Energy? 1 st 0.5 kj/mol 2 nd 4.6 kj/mol.
Capacitance and Capacitors. Recall heat capacity (c) –The amount of heat energy (J) absorbed (released) by a material of known mass (m) when changing.
Capacitance Definition Parallel Plate Capacitors Cylindrical Capacitor
PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
A payload to test in space Superconductive Magnetic Shielding technology R. Battiston Perugia University June 2010.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Electrical Energy - Moving electrons in a path is electricity
AWAKE electron source New Electron Source WP at CERN
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
CHARGING BY INDUCTION & CONDUCTION. STARRING THE ELECTROSCOPE.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Static Electricity Electric Atom Electric Circuits Ohm’s Law Game Board.
Beam diagnostics in the beamlines
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Ohm’s Law Calculating Current, Voltage, and Resistance.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
WEEK 1 You have 10 seconds to name…
Adding SubtractingMultiplyingDividingMiscellaneous.
Jarred Alexander Young December 10,  Filament power supply has been repaired and returned  Beam Testing can continue  Research methods of incorporating.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
The HIE-ISOLDE Faraday Cup
PIP Status Report Linac Startup plans 12/05/2012.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
Rate of flow of electrical charge is called current P2 4.2 Charge on the move Metals conduct electricity because they contain conduction or de-localised.
RF source, volume and caesiated extraction simulations (e-dump)
Electric Energy Notes.
Current, Voltage and Resistance. Current  When charge (electrons) are built up at one end of a conductor, they will flow to an area where there are less.
 What is electricity made of?  An electron is a very small particle  Orbits around the atom (Like the earth around the sun) e-e- e-e- + Atom.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
R Ch 33 Electric Fields & Potential pg 1 Text Qs pg 529 RQ 6-10, 13, 18, 19 Read sec pg 520 & 527.
CELLS IN SERIES AND PARALLEL Lesson 9. Cells in Series  The electric potential given to a single electron by a dry cell has an average voltage of around.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
Comes from Latin word that means, “to go around.” A circuit is a path provided to allow electrons to flow. A circuit allows the energy from a power.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
Pulsed Magnet Power Supply Feasibility Study
Test beam check list Michael JECKEL EN-EA-EC.
Installation of a Passive ZDC Module in TAN
ELENA electron cooler and SEM grids status
Diffuser status October 2017
ELENA Magnet Installation Planning
Series and Parallel Circuits
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Vocabulary Week 2 Advanced Class You will need 11 Index Cards
Measuring Current.
Adding with 9’s.
Adding with 10’s.
Adding ____ + 10.
LCLS Control System Personnel Linac & BC2 Controls progress
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS )LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of BI-BE group

MFC01 dimensions Designed by Ivan Francescut BE-BI-ML

MFC01 potential

MFC02 dimensions Designed by Ivan Francescut BE-BI-ML

MFC02 potential

Conclusion Better performance of FCs is expected: Grounded shielding is added Length of repeller is increased (30% of total length) Electrons with energy less then 500kev for MFC01 and 300keV for MFC02 will be captured and stay in FCs. Connection wire is hidden (to avoid irradiation) Faraday Cups should arrive at CERN next week (7-11 December) and installed after cleaning and vacuum test