Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Chapter 7 Managing Risk.
PROJECT RISK MANAGEMENT
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Project Management 6e..
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Project Management and Scheduling
Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.
What is Business Analysis Planning & Monitoring?
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Edward B. Farkas, Managing Director, Project Management Practice
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
NCSX Project Risk Management & Contingency Analysis Chris Gruber March 13, 2008.
Achieving peak performance in contracting for services Presentation to the 10 th IPPU CPD Grand Imperial Hotel 31 st March, 2012 John F. A. Etidau.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Management & Development of Complex Projects Course Code - 706
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycle.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 1 Office of Science NCSX Project Review of NCSX April 8-10, 2008 Cost and Schedule Ron.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
SOFTWARE PROJECT MANAGEMENT
Project Management Methodology
Project Risk Management Planning Stage
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
What is project management?
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Management PTM721S
Camera PDR/CD1 Planning 19 September 2008
Project Management Chapter 3.
Risk Identification HL-LHC Detector Upgrades Project
External Independent Review (EIR)
Linac Coherent Light Source (LCLS)
Presentation transcript:

Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky

Strykowsky 2Office of Science Review August 15, 2007 Topics Cost, Schedule and Contingency Development Process Basis and Assumptions Contingency Cost Summary Schedule Summary Cost Profile Manpower

Strykowsky 3Office of Science Review August 15, 2007 Process of Establishing a new Project EAC Developed Guidelines for Job Managers (realistic not best case) Estimates Prepared Independent Management Review (led by head of PPPL engineering)* PU Estimating Workshop (May 1-4)* Refined Estimating packages Reformatted for consistency Further Estimate review for completeness and realism Estimate uncertainty and Risk* Formally documented basis of estimate* Updated overhead and labor rates Prepared resource Loaded Schedule Design evolution of critical scope (task forces) Risk brainstorming meeting* Contingency analysis process (probabilistic approach)* Re-iterate Resource Loaded Schedule June 4 PU Review* Follow-up actions Final Updates, Packaging, Documentation (signed WAF’s) Statused through end of June ( CPI = 1.2 and SPI = 1.03 for two months ) Office of Science Review August * =NEW

Strykowsky 4Office of Science Review August 15, 2007 Refined Estimating packages (table 1 of 6) Table 1 - Work Approval Form Package includes copy of the resource loaded schedule

Strykowsky 5Office of Science Review August 15, 2007 Refined Estimating packages (table 2 of 6) Table 2 - Design

Strykowsky 6Office of Science Review August 15, 2007 Refined Estimating packages (table 3 of 6) Materials and Procurements

Strykowsky 7Office of Science Review August 15, 2007 Refined Estimating packages (table 4 of 6) Fabrication and Assembly

Strykowsky 8Office of Science Review August 15, 2007 Refined Estimating packages (table 5 of 6) Estimate Uncertainty and Risk

Strykowsky 9Office of Science Review August 15, 2007 Refined Estimating packages (table 6 of 6) Basis of estimate

Strykowsky 10Office of Science Review August 15, 2007 Key Planning Basis and Assumptions ETC forward from May 1 st, 2007 Cost Incurred from April 1, 2003 (MIE project inception) MIE project scope only. (Excludes research preparations and conceptual design) GPP and Infrastructure not part of MIE project. (Progress coordinated and tracked by Erik Perry) BA constraints (FY07= $16.77 FY08 = $15.9, FY09 = $18.56*) Scope unchanged from current baseline Institutional Overhead Rates Standard work week 8hrs/day 5 days/ week (Exception coil winding, Field period assy (sta5 FPA#3), and Final Machine assy) Holidays Contingency Allocation by fiscal year (commensurate with risk & cost uncertainty) Realistic task durations (anticipate manpower shortages & priorities) Task durations - more detail on critical path and near term * = assumed

Strykowsky 11Office of Science Review August 15, 2007 Cost Basis - Resource types and Rates Resource Types, labor and overhead rates Overhead and escalation rates Labor Skills (hourly rates) Non-Labor Resource

Strykowsky 12Office of Science Review August 15, 2007 Contingency - Process Structured process with support of consultant Job Manager and Project Team input Objective was to assess and analyze all areas of uncertainty and risk that might affect the cost and schedule estimates Used Probabilistic Risk Analysis Techniques (Monte Carlo Analysis) Recommend Contingency Allowances that provide 90% confidence level that proposed baseline will not be exceeded. Project Manager Experience

Strykowsky 13Office of Science Review August 15, 2007 Contingency - Components CostSchedule Estimate Uncertainty $ months + Risk $ months + Schedule (stretch-out) $ + Schedule Mitigation (i.e. 2 nd shift) $ + Project Manager Experience $ Total $ Months

Strykowsky 14Office of Science Review August 15, 2007 Contingency – Estimate Uncertainty Both cost estimates and schedule durations have inherent levels of uncertainty Uncertainty is a direct result of degree of design maturity and the complexity of the elements involved – in effect, how much definition exists to provide a basis for the estimates Uncertainty levels can be described in terms of ranges around the point estimates developed by Job Managers and the Project Management team Used standard industry and DOE estimate classifications to describe individual job estimates Used determination of design maturity and complexity to equate to estimate classification Also solicited Job Manager opinions regarding expected range around estimates (+ or – some % of the estimate)

Strykowsky 15Office of Science Review August 15, 2007 Contingency – Estimate Uncertainty Per AACEI Recommended Practice 18R-97, Cost Estimate Classification System – As Applied to Engineering, Procurement, and Construction in the Process Industries Five classes of estimates with associated accuracy ranges, dependent on level of project development and definition and estimating techniques used Equated the five estimate classes to a design maturity and complexity matrix for NCSX Basis for Estimate Ranges Design Complexity Design MaturityLowMediumHigh Low-15%+25%-20%+40%-30%+60% Medium-10%+15%-15%+25%-20%+40% High-5%+10%-10%+15%-15%+25% Estimate Uncertainty Matrix

Strykowsky 16Office of Science Review August 15, 2007 Contingency – Estimate Uncertainty Estimate Uncertainty Matrix by WBS ETC and Estimate Range

Strykowsky 17Office of Science Review August 15, 2007 Contingency – Estimate Uncertainty Established estimate range for each job using the Estimate Uncertainty Matrix Also had Job Managers describe expected accuracy (as + and – % of base estimate) - as a check on Matrix Used Monte Carlo Analysis to determine overall project cost probability profile - both approaches yielded similar results (adopted standard approach as conservative. ~1-2% higher than job mgrs) Each job estimate was treated as an independent variable –Triangular Distributions –Base Estimate as Most Likely Value –Low End of Range as Minimum Value –High End of Range as 80% confidence level* Cost Estimate Uncertainty Result = $8,036k * 20% chance that cost could be even higher than uncertainty matrix

Strykowsky 18Office of Science Review August 15, 2007 Contingency – Estimate Uncertainty Schedule Duration Uncertainty Established estimate range only for Critical and Near Critical Path activities using same approach as for cost Used Monte Carlo Analysis to determine overall project schedule probability profile Each critical path activity treated as independent variable –Triangular Distributions –Base Estimate as Most Likely Value –Low End of Range as Minimum Value –High End of Range as 90% confidence level (higher than for costs since schedule workarounds may be possible) Did not add schedule cont. for some activities (those that could be worked on second shift) – BUT added cost allowance for shift supervision, support and shift differential costs (schedule mitigation cost) Result = 7.9 months

Strykowsky 19Office of Science Review August 15, 2007 Contingency – Risk Risk Assessment and Analysis Identified risks –Job Manager and Project Team Input and Brainstorming Assessed Risks –Likelihood of Occurrence –Cost and Schedule Impact Ranges Ranked risks to focus management attention and mitigation actions (Risk mitigation actions included in baseline estimates) Used Monte Carlo Analysis model to assess probable residual impacts (after mitigation) on cost and schedule baseline Process will continue – identification of additional risks and management of identified risks. Result = $1,282k and 3.8 months

Strykowsky 20Office of Science Review August 15, 2007 Contingency – Cost of Schedule Contingency Risk Assessment and Analysis Cost impact of schedule contingency –Oversight/management cost = $202k/mo. Cost impact of schedule mitigation by use of second shift –During field period assembly for add’l supervision, metrology, support crews = $64k/mo. Result = $355k Result = $2,347

Strykowsky 21Office of Science Review August 15, 2007 Contingency – Project Manager’s Increment Additional contingency added to attain 27% cost contingency based upon; Recent Experience with WX-7 Recent NCSX experience Undefined risk “Unknown unknowns” Adopt schedule contingency of 11 months

Strykowsky 22Office of Science Review August 15, 2007 Contingency – Results CostSchedule Estimate Uncertainty $8,036 (16%) Risk $1,282 (3%) Schedule (stretch-out) $2,347 (5%) - + Schedule Mitigation (i.e. 2 nd shift) $ 355 (1%) - + Project Manager Experience $1,711 Proposed Baseline Contingency = $ 13,731 (27%) 11 Months

Strykowsky 23Office of Science Review August 15, 2007 Contingency – Results Allocated by WBS

Strykowsky 24Office of Science Review August 15, 2007 Based on deliverables and/or tasks provided by the job managers Varied from resource loaded schedules to deliverables and resource estimate only Established tasks, internal milestones (PDR’s, FDR’s, contract awards) Task durations based on realistic resource loadings, crew sizes, # shifts Logically linked Non-critical path tasks scheduled with BA constraints with free float to critical path Schedule iterated based on Ongoing design evolutions causing estimates to vary Contingency quantification exercises Resource leveling exercises (techs, key engrs) Scheduling - Process

Strykowsky 25Office of Science Review August 15, 2007 Results – Preliminary Cost

Strykowsky 26Office of Science Review August 15, 2007 Results – Cost Profile Contingency scheduled consistent with risks and uncertainties Plan consistent with Funding

Strykowsky 27Office of Science Review August 15, 2007 Results – Preliminary Schedule (Summary)

Strykowsky 28Office of Science Review August 15, 2007 Results – Milestones

Strykowsky 29Office of Science Review August 15, 2007 Results – Prelim. Resource Loaded Schedule

Strykowsky 30Office of Science Review August 15, 2007 Results – Manpower Manpower requirements being satisfied Future needs achievable

Strykowsky 31Office of Science Review August 15, 2007 SUMMARY Project has followed a disciplined path for updating its cost and schedule estimates highlighted by; Formal & consistent basis of estimate Independent reviews by PPPL engineering and PU Focus on center of the error bars (realistic) estimates from job managers Project has followed a methodical process for quantifying cost as well as schedule contingency. Probabilistic contingency methodology for cost and schedule estimate uncertainty Probabilistic contingency methodology for quantifying cost and schedule risk Initiated a formal risk registry that will be integrated into our work planning process Project has produced a proposed baseline cost estimate backed-up by a resource loaded schedule and detailed estimate basis.